A1440 A1450 A1460 A1470 A1480 A1490 A1500 A1510 A1520 A1530 A1540 A1550 A1560 A1570 A1580 A1590 A1600 A1610 Activity Name Formwork of RC (Footings & Tie Beams) of area (DCO-DCU, DC11-DC14) Inspection of setting out of RC formwork for area (DCO-DCU, DC11-DC14) Pouring of Concrete for RC Fooring & Tie beams for area (DCO-DCU, DC11-DC14) Concrete curing for area (DCO-DCU, DC11-DC14) Falsework for parameter beams & Internal Columns Inspection of setting out for parameter beams & Internal Columns Pouring of concrete for parameter beams & Internal Columns Curing of concrete for parameter beams & Internal Columns Masonry works for foundation wall backfill PC for trench base & trench & ramps and external stairs Falsework for columns & shear walls & stairs till 4.5 m level Inspection of setting out for columns & shear walls & stairs till 4.5 m level Pouring of concrete for columns & shear walls & stairs till 4.5 m level Curing of concrete for columns & shear walls & stairs till 4.5 m level Falsework for columns till 9 m height Inspection of setting out for columns till 9 m height Pouring of concrete for columns till 9 m heigh Curing of concrete for columns till 9 m height Falsework of Roof Slab for area (DCA-DCO, DC11-DC16) and (DCO-DCU, DC11-DC14) Dismantling of the tower crane Falsework of Roof Slab for area (DCO-DCU, DC14-DC16) Pouring of Concrete for Roof Slab Curing of roof slab membrane 4 mm for roof isolation Thermal Insulation boards Sloped concrete average thick 7 cm Supply and install 200x200x15 mm cement tiles for roof Installation of scaffolding Masonry Works only for external parameter 20 cm thick Supply and install sand - cement plaster to internal walls only "columns and ceiling are fair face "according to specifi Supply and install sand - cement plaster to external walls accordingtospecification , inclding metal lath if needed Original Start Duration 5 22-Aug-12 1 28-Aug-12 1 29-Aug-12 5 30-Aug-12 5 05-Sep-12 1 11-Sep-12 1 12-Sep-12 5 13-Sep-12 5 19-Sep-12 3 25-Sep-12 8 25-Sep-12 7 25-Sep-12 1 03-Oct-12 1 04-Oct-12 3 06-Oct-12 5 09-Oct-12 1 15-Oct-12 1 16-Oct-12 3 17-Oct-12 15 21-Oct-12 7 30-Oct-12 7 07-Nov-12 1 15-Nov-12 5 17-Nov-12 7 22-Nov-12 7 01-Dec-12 2 09-Dec-12 10 11-Dec-12 7 17-Nov-12 10 17-Nov-12 14 28-Nov-12 Finish Apr 27-Aug-12 28-Aug-12 29-Aug-12 04-Sep-12 10-Sep-12 11-Sep-12 12-Sep-12 18-Sep-12 24-Sep-12 27-Sep-12 03-Oct-12 02-Oct-12 03-Oct-12 04-Oct-12 08-Oct-12 14-Oct-12 15-Oct-12 16-Oct-12 20-Oct-12 06-Nov-12 06-Nov-12 14-Nov-12 15-Nov-12 21-Nov-12 29-Nov-12 08-Dec-12 10-Dec-12 22-Dec-12 24-Nov-12 27-Nov-12 13-Dec-12
Project Time Schedule Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep Oct Qtr 4, 2012 Nov Dec Jan Qtr 1, 2013 Feb Mar
Formwork of RC (Footings & Tie Beams) of area (DCO-DCU, DC11-DC14) Inspection of setting out of RC formwork for area (DCO-DCU, DC11-DC14) Pouring of Concrete for RC Fooring & Tie beams for area (DCO-DCU, DC11-DC14) Concrete curing for area (DCO-DCU, DC11-DC14) Falsework for parameter beams & Internal Columns Inspection of setting out for parameter beams & Internal Columns Pouring of concrete for parameter beams & Internal Columns Curing of concrete for parameter beams & Internal Columns Masonry works for foundation wall backfill PC for trench base & trench & ramps and external stairs Falsework for columns & shear walls & stairs till 4.5 m level Inspection of setting out for columns & shear walls & stairs till 4.5 m level Pouring of concrete for columns & shear walls & stairs till 4.5 m level Curing of concrete for columns & shear walls & stairs till 4.5 m level Falsework for columns till 9 m height Inspection of setting out for columns till 9 m height Pouring of concrete for columns till 9 m height Curing of concrete for columns till 9 m height Falsework of Roof Slab for area (DCA-DCO, DC11-DC16) and (DCO-DCU, DC11-D Dismantling of the tower crane Falsework of Roof Slab for area (DCO-DCU, DC14-DC16) Pouring of Concrete for Roof Slab Curing of roof slab membrane 4 mm for roof isolation Thermal Insulation boards Sloped concrete average thick 7 cm Supply and install 200x200x15 mm cement tiles for roof Installation of scaffolding Masonry Works only for external parameter 20 cm thick Supply and install sand - cement plaster to internal walls only "column
A1620
14 28-Nov-12
13-Dec-12
Summary
Page 5 of 12