Faculty Details

Name of the Faculty:Prof. GautamBhadoriya

Designation: Assistant Professor

Department: Civil Engineering

Course Details Name of the Program : B.E. Branch : Civil

Semester: VII

Title of the subject: Construction Planning and Management

Subject Code: 7111

Number of Student: 65

Guidelines to study the subject


Name of the Faculty: Prof. Gautam Bhadoriya

Subject :Construction Planning and Management

Subject Code:7111

Class :Final Year, VII Sem Guidelines to study the subject: 1. 2. 3. 4.

Branch :Civil

Students should bring calculator while attending the class. Knowledge of previous chapter taught in class is necessary. Knowledge of softwares related to Project management is necessary. Students should bring geometry box, notebook, graph papers, high lighters, pen, markers, and necessary stationeries while attending the class. Understand the concept and application of the topic in practice. Last 5 year question papers should be analyzed & solved. Appear all midterm exams. Discuss if difficulties associated after exam.

5. 6. 7.

Book Recommended: 1. Construction Equipment by Peurify 2. Construction Management by S. Seetaraman

3. Construction, Management & Accounts by Harpal Singh 4. Construction Planning & Management by L.S. Srinath 5. Construction Management by B.C. Punmia-K K Khandelwal 6. CPM & PERT BY Wiest& Levy

Course Objectives

Name of the Faculty: Prof. Gautam Bhadoriya

Subject :Construction Planning and Management

Subject Code: 7111

Class :Final Year, VII Sem

Branch : Civil

On completion of the subject/course the student shall be able to :

S.No. 1 2 3 4 5 6 7

Objectives To understand various aspects of project management To study different construction techniques involved in construction. To study selection criteria of various construction equipments. To study various cost associated with owning and operating construction equipments. To study different types of contracts and tenders documents and their conditions. To understand various types of charts and manuals used in site organization. To study various labour laws and welfare facilities and safety management

Outcomes (a), (b), (c), (h) (m) (k) (e), (i), (k) (d), (l) (k) (f), (g), (j)

Signature of Faculty Date:

Course Outcomes
Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Class :Final Year, VII Sem Subject Code: 7111 Branch : Civil

The expected outcomes of the course/subject are : S. General Categories of outcomes No. a An ability to apply knowledge of mathematical such, science and engineering. b An ability to design and conduct experiments, as well as to analyze and interpret data. c An ability to design a system component, or process to meet desired needs within realistic constraints such as economic, environmental, social, political, ethical, health and safety manufacturability and sustainability. d An ability to function on multidisciplinary teams. e An ability to identify, formulate and solve engineering problems. f An understanding of professional and ethical responsibility. g An ability to communicate effectively. h The broad education necessary to understand the impact of engineering solution in a global, economic, environmental and societal context. i A recognition of the need for and an ability to engage in lifelong learning. j A knowledge of contemporary issues. k An ability to use techniques , skills and modern tools necessary for engineering practiced. l The programme makes familiar with current and emerging socioeconomic issues, which Civil engg. Is practiced. m The programme makes them aware of professional ethics and their societal responsibilities for sustainable development. n -------

Specific outcomes of the course 1 1 1

5 4 7 7 1

4 7 3, 4, 6 5 2

Signature of Faculty Date:

Objective Outcome Relationship Matrix


Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Subject Code: 7111 Class : Final Year, VII Sem Branch : Civil

Indicate the relationship by putting Outcome/ a b c d objectives 1 2 3 4 5 6 7

Signature of Faculty Date:

Course Schedule
Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Class :Final Year, VII Sem The course schedule of the whole course/subject is : S.No./ Unit No. 1 2 Descprition Total No. of lectures 02 Remark Subject Code: 7111 Branch : Civil

Introduction to form work and shuttering& different types.

Job layout , factors affecting , Advantages of good job layout. 01 Examples. Construction scheduling, its uses and advantages Bar chart its construction and Numerical problems, Limitations of bar chart Development of Network and Introduction to PERT & CPM Time estimates in PERT and CPM Time computations for PERT Networks PERT Network Analysis, Numerical Problems on time estimation/ computation Numerical Problem on probability of meeting schedule time CPM Network analysis, Time computations in CPM Networks, Critical Path Problem Factors affecting selection of construction equipment, Study of construction equipment Study of working and operation of construction equipment, Equipment Management. Contract, Types of contracts their merits and demerits, Special types of contracts like turnkey, BOT etc., Contract 01 01

3 4

5 6 7 8

02 02 01 04

9 10

01 03

11

02

12

03

13

03

Document, conditions of contract 14 Process of Tendering, Notice inviting tender, Earnest money and security deposit Departmental Methods of contraction By employing, Daily labour muster roll, work order method, contract method. Arbitration its advantages, Arbitrator its qualification, appointment, duties & power. Administrative Approval Tech sanction. Direct and Indirect costs in construction projects, Cost curves, optimum duration for project, Contracting the project for cost optimization, Numerical problem on cost optimization Site organization, Labour laws, Importance of safety at construction site, Measures to prevent accidents at construction site, Approaches to achieve safe construction,Benefits to labour Organization chart and its types, Organization manuals. Practice on M.S. Project software 02

15

02

16

02

17

03

18

03

19 20

02 08

Signature of Faculty Date:

Schedule of Instructions
UNIT-I

Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Class :Final Year, VII Sem S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Date No. of Period 10/07/12 01 11/07 01 13/07 01 16/07 17/07 20/07 23/07 24/07 25/07 27/07 30/07 30/07 13/08 14/08 17/08 21/08 22/08 22/08 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 Topics Subject Code: 7111 Branch : Civil Objective and outcome No. Introduction to form work and shuttering 2/(m) Different types of form work 2/(m) Job layout , factors affecting , Advantages 1/(a), (b), (c), (h) of good job layout. Examples. Construction scheduling, its uses and 1/(a), (b), (c), (h) advantages Bar chart its construction and Numerical (1), (6)/(a), (b), problems, Limitations of bar chart (c), (h), (k) Development of Network 1/(a), (b), (c), (h) Introduction to PERT & CPM 1/(a), (b), (c), (h) Time estimates in PERT 1/(a), (b), (c), (h) Time estimates in CPM 1/(a), (b), (c), (h) Time computations for PERT Networks 1/(a), (b), (c), (h) PERT Network Analysis 1/(a), (b), (c), (h) Numerical Problems on time estimation/ 1/(a), (b), (c), (h) computation Numerical Problems on time estimation/ 1/(a), (b), (c), (h) computation Numerical Problems on time estimation/ 1/(a), (b), (c), (h) computation Numerical Problem on probability of 1/(a), (b), (c), (h) meeting schedule time CPM Network analysis 1/(a), (b), (c), (h) Time computations in CPM Networks 1/(a), (b), (c), (h) Critical Path Problem 1/(a), (b), (c), (h) Remarks

Signature of Faculty Date: Note: 1. Ensure that all the topics specified in the course are mentioned 2. Additional topics covered, if any may also be specified.

Schedule of Instructions
UNIT-II Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Class :Final Year, VII Sem S.No. 1 2 3 Date 24/08 27/08 28/08 No. of Periods 01 01 01 Topics Factors affecting selection of construction equipment Study of different types construction equipment Study of working and operation of hauling equipment&earthmoving equipment Study of working and operation of excavating equipment & transporting equipment Study of equipment management Subject Code: 7111 Branch : Civil Objective and outcome No. 3/(k) & 4/(e), (i), (k) 3/(k) & 4/(e), (i), (k) 3/(k) & 4/(e), (i), (k) 3/(k) & 4/(e), (i), (k) 3/(k) & 4/(e), (i), (k) Remarks

29/08

01

31/08

01

Signature of Faculty Date: Note: 1. Ensure that all the topics specified in the course are mentioned 2. Additional topics covered, if any may also be specified.

Schedule of Instructions
UNIT-III

Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Class :Final Year, VII Sem S.No. 1 2 3 4 5 6 Date 03/09 05/09 07/09 07/09 10/09 11/09 No. of Periods 01 01 01 01 01 01 Topics Introduction of Contract, Types of contracts their merits and demerits, Special types of contracts like turnkey, BOT etc. Contract Document, conditions of contract Process of Tendering, Notice inviting tender Earnest money and security deposit Departmental Methods of contraction By employing, Daily labour muster roll Work order method, contract method Arbitration its advantages, Arbitrator its qualification Appointment, duties & power of Arbitrator, Administrative Approval Tech sanction. Subject Code: 7111 Branch : Civil Objective and outcome No. 5/(d), (l) 5/(d), (l) 5/(d), (l) 5/(d), (l) 5/(d), (l) 5/(d), (l) Remarks

7 8 9

12/09 14/09 18/09

01 01 01

5/(d), (l) 5/(d), (l) 5/(d), (l)

Signature of Faculty Date: Note: 1. Ensure that all the topics specified in the course are mentioned 2. Additional topics covered, if any may also be specified.

Schedule of Instructions
UNIT-IV

Name of the Faculty: Prof. GautamBhadoriya Subject :Construction Planning and Management Class :Final Year, VII Sem S.No. 1 2 Date 21/09 25/09 No. of Periods 01 01 Topics Different types of cost associated with the construction projects Cost curves, optimum duration for project, Contracting the project for cost optimization Numerical problem on cost optimization Subject Code: 7111 Branch : Civil Objective and outcome No. 1/(a), (c), (h) 4/(e), (i), (k) 1/(a), (c), (h) 4/(e), (i), (k) 1/(a), (c), (h) 4/(e), (i), (k) Remarks

28/09

01

Signature of Faculty Date: Note: 1. Ensure that all the topics specified in the course are mentioned 2. Additional topics covered, if any may also be specified.

Schedule of Instructions UNIT-V

Name of the Faculty: Prof. GautamBhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem S.No. 1 2 3 Date 05/10 09/10 12/10 No. of Periods 01 01 01 Topics Site organization Labour laws, Importance of safety at construction site Measures to prevent accidents at construction site, Approaches to achieve safe construction, Benefits to labour Organization chart and its types Organization manuals Subject Code: 7111 Branch : Civil Objective and outcome No. 6/(k) and 7/(f), (g), (j) 6/(k) and 7/(f), (g), (j) 6/(k) and 7/(f), (g), (j) Remarks

4 5

26/10 30/10

01 01

6/(k) and 7/(f), (g), (j) 6/(k) and 7/(f), (g), (j)

Signature of Faculty Date: Note: 1. Ensure that all the topics specified in the course are mentioned 2. Additional topics covered, if any may also be specified.

Tutorial Sheets I

Name of the Faculty: Prof. GautamBhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem This tutorial corresponding to Unit No. 1 Q.1 (a) Role of construction in the development of country (b) Different materials for formwork. (c ) Loads for formwork. Q.2 Different types of formwork: (a) Formwork for column (b) Formwork for beam (c) Treatment and IS Code provision What is the importance of safety in construction Subject Code: 7111 Branch : Civil

Q.3

Q.4 How will you increase the safety in construction (Approaches to increase the safety in construction) Q.5 Q.6 (a) (b) (c) (d) (e) (f) (g) (h) Q.7 Describe different phases of a project life cycle. Write viability of a project. Define following: Bar Chart Short coming of Bar charts Mile stone chart CPM & PERT Earliest expected tim& latest allowable time Tp, to, t2 Slack Float Numerical Problems related to: Critical Path, Slack, Float

Please write the questions/problem/exercise which you would like to give to the students and also mention the objectives to which these questions/problems are related.

Signature of Faculty Date:

Tutorial Sheets II Name of the Faculty: Prof. GautamBhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem Subject Code: 7111 Branch : Civil

This tutorial corresponding to Unit No.2 Q.1 Q.2 Q. 3 Q. 4 Q. 5 Please write the questions/problem/exercise which you would like to give to the students and also mention the objectives to which these questions/problems are related.

Signature of Faculty Date:

Tutorial Sheets III Name of the Faculty: Prof. GautamBhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem This tutorial corresponding to Unit No.3 Q.1 What is meant by construction contracts. Write short notes on different types of contracts. Subject Code: 7111 Branch : Civil

Q.2

Method of preparing contract document.

Q.3

What do you under stand by security deposit and earnest money.

Q.4

Duties and rights of Sub Contractor.

Q.5

Condition in which contract may be terminated

Q.6

Write down in brief about: (a) Negotiation (b) Conciliation (c) Arbitration (d) Breach of contract What is the different a between administrative approval and technical sanction.

Q.7

Q.8

Discuss in brief international contracts.

Please write the questions/problem/exercise which you would like to give to the students and also mention the objectives to which these questions/problems are related. Signature of Faculty Date:

Tutorial Sheets IV Name of the Faculty: Prof. Gautam Bhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem Subject Code: 7111 Branch : Civil

This tutorial is corresponding to Unit No. 4 Q.1 Method of preparation of Measurement book

Q.2

Write short notes on: (a) Secured advance (b) Imprest amount (c) Running bills and final bill

Q.3

How will you prepare the abstract sheet

Q.4

Write down the specification fixed by PWD for construction work

Please write the questions/problem/exercise which you would like to give to the students and also mention the objectives to which these questions/problems are related.

Signature of Faculty Date:

Tutorial Sheets V Name of the Faculty: Prof. GautamBhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem This tutorial corresponding to Unit No. 5 Q.1 Write down the types of organization and also draw the charts of these. Subject Code: 7111 Branch : Civil

Q.2

Different welfare facilities provided to the staffs at construction site.

Q.3

Minimum wages Act 1948.

Q.4

Labour Act 1970

Q.5

Transportation model & assignment model construction equipment.

Q.6

Payment of wages Act 1936.

Q.7

Workmen compensation Act 1923.

Q.8

Employees state insurance Act 1948.

Please write the questions/problem/exercise which you would like to give to the students and also mention the objectives to which these questions/problems are related.

Signature of Faculty Date:

Course Completion Status Name of the Faculty: Prof. GautamBhadoriya Subject : Construction Planning and Management Class : Final Year, VII Sem Unit Unit I Subject Code: 7111 Branch : Civil No. of Objectives 1, 2

Unit II

Unit III

Unit IV

Unit V

Description Different types of form work,Job layout , factors affecting , Advantages of good job layout. Examples. Construction scheduling, its uses and advantages,Bar chart its construction and Numerical problems, Limitations of bar chart ,Development of Network, Introduction to PERT & CPM, Time estimates in PERT, Time estimates in CPM, Time computations for PERT Networks,PERT Network Analysis, Numerical Problem on probability of meeting schedule time, CPM Network analysis, Time computations in CPM Networks, Critical Path Problem. Factors affecting selection of construction equipment, Study of different types construction equipment, Study of working and operation of hauling equipment & earthmoving equipment, Study of working and operation of excavating equipment & transporting equipment, Study of equipment management. Introduction of Contract, Types of contracts their merits and demerits, Special types of contracts like turnkey, BOT etc., Contract Document, conditions of contract, Process of Tendering, Notice inviting tender, Earnest money and security deposit, Departmental Methods of contraction By employing, Daily labour muster roll,Work order method, contract method, Arbitration its advantages, Arbitrator its qualification, Appointment, duties & power of Arbitrator, Administrative Approval Tech sanction. Different types of cost associated with the construction projects, Cost curves, optimum duration for project, Contracting the project for cost optimization, Numerical problem on cost optimization. Site organization, Labour laws, Importance of safety at construction site, Measures to prevent accidents at construction site, Approaches to achieve safe construction, Benefits to labour, Organization chart and its types, Organization manuals.

3, 4

1, 4

6, 7

Signature of Faculty Date: