Академический Документы
Профессиональный Документы
Культура Документы
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
Phase:
Date:
Rev:
DIVISION
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
Notes
Notes
South
Cooling Tower
Replacement
North
Cooling Tower
Replacement
AMOUNT $
AMOUNT $
30,000
29,925
58,000
0
0
0
0
768,896
88,537
80,000
49,850
116,000
0
0
0
0
2,543,879
102,574
975,358 (3&4)
2,892,303 (3&4)
CHL
Cooling Tower
Replacement
Computer
Center
Process Cooling
Total
AMOUNT $
80,000
11,147
29,760
568,023
189,703
25,525
30,575
10,500
31,100
14,440
9,270
4,950
2,777,158
0
215,525
121,497
214,260
31,100
14,440
9,270
4,950
6,657,955
380,815
878,633
2,903,518
7,649,812
97,536
20,646
433,845
34,842
131,795
60,626
435,528
200,343
1,098,704
316,457
1,093,540
3,360,991
1,071,054
3,539,388
9,064,973
109,354
336,099
107,105
353,939
906,497
SUBTOTAL
1,202,895
3,697,090
1,178,159
3,893,327
9,971,471
1,203,000
3,697,000
1,178,000
3,893,000
9,971,000
Deduct
Bldg 92 Cooling Towers
-1,122,422
SUBTOTAL
Development Contingency (10%)
Notes:
(1) Labor burden included in unit costs @ 23.9% ave.
(2) Sales tax included in unit costs @ 5%
(3) Subcontractor overhead included in unit costs @ 16% ave.
(4) Subcontractor profit included in unit costs @ 10%
(5) Prime contractor OH & P applied to Division 1.0 thru 6.0 and 9.0 (Civil & Electrical) @ 10%
8,849,000
Assumptions:
(Rounded)
Open competitive bidding
Start by end of 2010
Mechanical contractor is prime, Civil &
Electrical contractors are subs
Not Included Above:
Hazardous material removal
Work indicated to be by separate contract
Escalation beyond 2010 start
EwingCole
1
Phase:
Date:
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
Contract No.:
EC Project No.:
JSA 10-C0503
20100498
UNIT
RATE
AMOUNT
1
1
LS
LS
1,500.00
1,000.00
1,500
1,000
1
1
1
LS
LS
LS
10,000.00
2,500.00
15,000.00
10,000
2,500
15,000
2.0
30,000
SUBSTRUCTURE
Foundations
Column footers, 4'x4'x1.5'
Column pedestals, 1'x1'x3', w/ ab/b pl
Turndown slab edge
Slab on grade 5"
Equipment pads
Earthwork Pit & trench excavation earth
Pit & trench backfill & compact
Grade building pad
6
6
100
450
75
EA
EA
LF
SF
SF
1,200.00
750.00
35.00
8.00
15.00
7,200
4,500
3,500
3,600
1,125
LS
10,000.00
10,000
TOTAL SUBSTRUCTURE
3.0
29,925
SUPERSTRUCTURE
Structural steel framing, galvanized
Steel grating, galvanized, 1 1/2" x 3/16"
9
550
T
SF
4,000.00
40.00
36,000
22,000
TOTAL SUPERSTRUCTURE
8.0
TOTAL
58,000
MECHANICAL
Demolition - South Access Towers - Replacement
Cooling Towers
Pumps
Piping
Miscellaneous
3
3
1
1
EA
EA
LS
LS
4,455.00
2,090.00
45,000.00
15,000.00
13,365
6,270
45,000
15,000
EwingCole
Phase:
Date:
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
Contract No.:
EC Project No.:
JSA 10-C0503
20100498
2
2
2
80
2
50
1
1
1
1
1
1
UNIT
EA
EA
EA
LF
EA
LF
LS
LS
LS
LS
LS
LS
RATE
114,250.00
27,249.00
11,536.50
170.15
1,376.50
454.40
34,525.00
56,600.00
25,300.00
12,650.00
88,530.00
126,500.00
AMOUNT
228,500
54,498
23,073
13,612
2,753
22,720
34,525
56,600
25,300
12,650
88,530
126,500
TOTAL MECHANICAL
9.0
TOTAL
768,896
ELECTRICAL
South Access Cooling Towers
SA-MCC-1 600A 480V
SA-MCC-1 main feeder 600A
SA-MCC-1 redundant feeder 600A
CT Equipment Wiring
150A feeder
60A feeder
30A feeder
Disconnect switch - 200A N3R
Disconnect switch - 60A N3R
VFD 60HP (FBO)
Motor conn - 60HP
Motor conn - 30HP
Equipment conn - 30A
Existing MCC mods
Existing CT equipment feeder removals
Concrete equipment pads - MCC
1
100
90
EA
LF
LF
25,412.56
175.52
175.52
25,413
17,552
15,797
150
260
210
3
3
3
3
3
3
1
1
1
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
LS
EA
32.59
17.79
12.35
1,536.55
902.99
1,319.22
361.89
216.60
51.90
1,056.00
2,778.19
666.19
4,889
4,625
2,594
4,610
2,709
3,958
1,086
650
156
1,056
2,778
666
TOTAL ELECTRICAL
88,537
975,358
975,358
EwingCole
Phase:
Date:
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
Contract No.:
EC Project No.:
JSA 10-C0503
20100498
QTY
UNIT
RATE
AMOUNT
1
1
LS
LS
1,500.00
1,000.00
1,500
1,000
1
1
1
1
LS
LS
LS
LS
10,000.00
50,000.00
2,500.00
15,000.00
10,000
50,000
2,500
15,000
2.0
80,000
SUBSTRUCTURE
Foundations
Column footers, 4'x4'x1.5'
Column pedestals, 1'x1'x3', w/ ab/b pl
Turndown slab edge
Slab on grade 5"
Equipment pads
Earthwork Pit & trench excavation earth
Pit & trench backfill & compact
Grade building pad
12
12
200
900
150
EA
EA
LF
SF
SF
1,200.00
750.00
35.00
8.00
15.00
14,400
9,000
7,000
7,200
2,250
LS
10,000.00
10,000
TOTAL SUBSTRUCTURE
3.0
49,850
SUPERSTRUCTURE
Structural steel framing, galvanized
Steel grating, galvanized, 1 1/2" x 3/16"
18
1,100
T
SF
4,000.00
40.00
72,000
44,000
TOTAL SUPERSTRUCTURE
8.0
TOTAL
116,000
MECHANICAL
Demolition - North Access Towers - Replacement
Cooling Towers
Pumps
Piping
Miscellaneous
Demolition - ESR (Bldg 102)
Cooling Towers
Pumps
Piping
Miscellaneous
Demolition - End Station (Bldg 92)
Cooling Towers
Pumps
Piping
Miscellaneous
3
2
1
1
EA
EA
LS
LS
4455.00
2090.00
68000.00
20000.00
13,365
4,180
68,000
20,000
2
2
1
1
EA
EA
LS
LS
4455.00
2090.00
68000.00
20000.00
8,910
4,180
68,000
20,000
3
3
1
1
EA
EA
LS
LS
4455.00
2090.00
45000.00
15000.00
13,365
6,270
45,000
15,000
EwingCole
Phase:
Date:
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
Contract No.:
EC Project No.:
JSA 10-C0503
20100498
MECHANICAL (Cont)
20" Equalizer/Bypass
20" 3 Way Valve
Protect / support underground utilities
Insulation
Controls
Commissioning
Cleaning
Testing & Balancing
Coordination
New Work - ESR (Bldg 102)
BAC 3872C-OM (872 Ton)
B/G VSX-VSH 5x6x13-1/2A (60 HP)
Basket Strainer
12" Ductile Iron (UG - CWS/R)
12" Ductile Iron Fittings (UG - CWS/R)
8" Ductile Iron (UG - CWS/R)
8" Ductile Iron Fittings (UG - CWS/R)
8" Ductile Iron (UG - CWS/R)
8" Ductile Iron Fittings (UG - CWS/R)
Manhole
Tee Fittings (in Manhole) Ductile Iron
Reducers (in Manhole) Ductile Iron
New Work - End Station
BAC 31132C-QM/V (1132 Ton)
B/G VSX-VSH 6x8x10-1/2A (60 HP)
Basket Strainer
ABV Grade Pipe 14"
Iso Valves 14"
14" Equalizer/Bypass
Insulation
Controls
Commissioning
Cleaning
Testing & Balancing
Coordination
QTY
UNIT
RATE
AMOUNT
2
2
2
250
80
2
EA
EA
EA
LF
LF
EA
114,250.00
27,249.00
11,536.50
454.40
170.15
1,376.50
228,500
54,498
23,073
113,600
13,612
2,753
50
1
1
1
1
1
1
1
1
LF
EA
LS
LS
LS
LS
LS
LS
LS
454.40
20,879.00
50,000.00
104,535.00
84,900.00
23,000.00
11,500.00
80,490.00
114,990.00
22,720
20,879
50,000
104,535
84,900
23,000
11,500
80,490
114,990
1
1
1
1300
40
150
10
300
10
1
2
2
EA
EA
EA
LF
EA
LF
EA
LF
EA
EA
EA
EA
114,250.00
27,249.00
11,536.50
171.40
1,989.60
146.20
995.25
146.20
995.25
3,065.00
6,293.00
4,456.55
2
2
2
300
4
50
1
1
1
1
1
1
EA
EA
EA
LF
EA
LF
LS
LS
LS
LS
LS
LS
139,125.00
27,249.00
11,536.50
295.60
5,628.50
295.60
56,950.00
78,825.00
12,530.00
6,265.00
43,850.00
62,645.00
114,250
27,249
11,537
222,820
79,584
21,930
9,953
43,860
9,953
3,065
12,586
8,913
0
278,250
54,498
23,073
88,680
22,514
14,780
56,950
78,825
12,530
6,265
43,850
62,645
TOTAL MECHANICAL
9.0
TOTAL
2,543,879
ELECTRICAL
North Access Cooling Towers
Mods to ex Panel NA-1 add breakers (FBO)
NA-MCC-2 600A 480V
NA-MCC-2 main feeder 400A
NA-MCC-2 redundant feeder 400A
CT Equipment Wiring
150A feeder
60A feeder
30A feeder
Disconnect switch - 200A N3R
Disconnect switch - 60A N3R
VFD 60HP (FBO)
Motor conn - 60HP
Motor conn - 30HP
Equipment conn - 30A
Existing CT equipment feeder removals
Concrete equipment pads - MCC
1
1
50
130
LS
EA
LF
LF
1,265.63
23,875.25
116.32
116.32
1,266
23,875
5,816
15,122
100
170
140
2
2
2
2
2
2
1
1
LF
LF
LF
EA
EA
EA
EA
EA
EA
LS
EA
32.59
17.79
12.35
1,536.55
902.99
1,319.22
361.89
216.60
51.90
2,778.19
666.19
3,259
3,024
1,729
3,073
1,806
2,638
724
433
104
2,778
666
EwingCole
Phase:
Date:
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
Contract No.:
EC Project No.:
JSA 10-C0503
20100498
QTY
UNIT
RATE
AMOUNT
TOTAL
LS
2,566.99
2,567
2
2
2
2
7
EA
EA
EA
EA
EA
5,247.08
1,707.36
1,319.22
1,124.31
773.36
10,494
3,415
2,638
2,249
5,413
LS
1,000.00
1,000
50
90
70
1
1
1
1
1
1
LF
LF
LF
EA
EA
EA
EA
EA
EA
32.59
17.79
12.35
1,536.55
902.99
1,319.22
361.89
216.60
51.90
1,630
1,601
865
1,537
903
1,319
362
217
52
102,574
2,892,303
2,892,303
EwingCole
Phase:
Date:
Jefferson Lab
QTY
UNIT
RATE
AMOUNT
1
1
LS
LS
1,500.00
1,000.00
1,500
1,000
1
1
1
1
LS
LS
LS
LS
10,000.00
50,000.00
2,500.00
15,000.00
10,000
50,000
2,500
15,000
80,000
SUBSTRUCTURE
Foundations
Concrete Slab for Cooling Towers
Foundation for CT
Steel Tie Rod @ Foundation
Pad for Pumps
35
3
2
2
CY
CY
EA
CY
265.37
265.37
266
265.37
9,288
796
532
531
TOTAL SUBSTRUCTURE
3.0
11,147
SUPERSTRUCTURE
Structural steel framing, galvanized
Steel grating, galvanized, 1 1/2" x 3/16"
5
294
T
SF
4,000.00
40.00
18,000
11,760
TOTAL SUPERSTRUCTURE
8.0
TOTAL
29,760
MECHANICAL
Demolition - CHL
Cooling Towers
Pumps
Piping
Miscellaneous
New - CHL
Cooling Tower (872 Ton)
Pump/motor set (350 HP each)
Basket Strainer
14"Steel
14" Fittings
12"Steel
12" Fittings
10"Steel
10" Fittings
8" Steel
8" Fittings
Manhole
4
4
1
1
EA
EA
LS
LS
4455.00
2090.00
45000.00
15000.00
17,820
8,360
45,000
15,000
2
2
2
211
25
40
18
40
29
72
60
1
EA
EA
EA
LF
EA
LF
EA
LF
EA
LF
EA
EA
71,090.00
60,003.00
4,835.00
93.92
963.84
84.00
880.00
65.15
313.59
41.88
322.32
3,065.00
142,180
120,006
9,670
19,817
24,096
3,360
15,840
2,606
9,094
3,015
19,339
3,065
Ewing Cole
Insulation
Miscellaneous
Valves
Controls
Cleaning
Testing & Balancing
1
1
37
1
1
1
LS
LS
LF
LS
LS
LS
3,000.00
19,172.00
1,828.38
12,600.00
5,000.00
2,333.00
3,000
19,172
67,650
12,600
5,000
2,333
TOTAL MECHANICAL
9.0
568,023
ELECTRICAL
Transformer 1500 KVA
PANELBOARD 2000 A w/ brkr.
Circuits
500 MCM
Miscellaneous
Breakers
BRKR. 800A 3P
BRKR 900 A
BRKR 30 A
Conduit
CONDUIT 3"
CONDUIT 2 1/2"
CONDUIT 1 1/4"
CONDUIT 1"
VFD 50 HP @ C/T
REMOVE BRKR & RETURN TO OWNER
Motor conn -350HP
Motor conn - 50HP
REMOVE MCC ( 4MEN 16 HR)
ADD FOT GROUND FAULT
1
2
EA
EA
36,975.00
17,195.00
36,975
34,390
360
1500
LF
LF
13.90
3.35
5,004
5,021
1
1
1
2
90
210
210
210
2
1
3
3
1
5
EA
EA
EA
LF
LF
LF
LF
LF
EA
EA
EA
EA
LS
EA
10,530.00
22,200.00
1,600.00
17,195.00
17.52
14.84
7.51
5.12
8,250.00
723.00
361.89
216.60
666.19
2,210.00
10,530
22,200
1,600
34,390
1,577
3,116
1,577
1,075
16,500
723
1,086
650
2,240
11,050
TOTAL ELECTRICAL
189,703
878,633
878,633
Ewing Cole
Phase:
Date:
Jefferson Lab
Task Order No. 6
Process Cooling Tower Upgrade
CEBAF
Contract No.:
EC Project No.:
JSA 10-C0503
20100498
QTY
1.0
UNIT
RATE
AMOUNT
1
1
LS
LS
5,000.00
2,500.00
5,000
2,500
40
1
17
25
60
1
LF
LS
LF
SY
LF
LS
25.00
1,500.00
75.00
50.00
25.00
2,500.00
1,000
1,500
1,275
1,250
1,500
2,500
150
1
LF
LS
50.00
1,500.00
7,500
1,500
25,525
SUBSTRUCTURE
Foundations Column footers, 5'x5'x2'
Continuous wall footer & foundation wall
Slab on grade 8" bar reinforced, including
stone base
Equipment pad, interior
Earthwork Pit & trench excavation earth
Pit & trench backfill & compact
Grade building pad
2
74
EA
LF
1,500.00
135.00
3,000
9,990
660
135
SF
SF
16.00
15.00
10,560
2,025
LS
5,000.00
5,000
TOTAL SUBSTRUCTURE
3.0
30,575
SUPERSTRUCTURE
Structural steel framing, rigid frame welded
3,500.00
10,500
TOTAL SUPERSTRUCTURE
4.0
TOTAL
10,500
EXTERIOR ENCLOSURE
Insulated vertical metal panel system, inc
girts & purlins
Doors & frames Overhead door w/ channel frame, 10'x10'
Louvers
EXTERIOR ENCLOSURE
1,100
SF
24.00
26,400
1
24
EA
SF
3,500.00
50.00
3,500
1,200
31,100
Ewing Cole
5.0
ROOFING
Insulated metal roof panels
Gutters, aluminum
Downspouts, aluminum
660
34
28
SF
LF
LF
20.00
20.00
20.00
13,200
680
560
TOTAL ROOFING
6.0
14,440
INTERIOR CONSTRUCTION
Mech room cmu partition
Paint floor
Paint doors & frames, miscellaneous painting
15
660
1
LF
SF
LS
500.00
2.00
450.00
7,500
1,320
450
9,270
FIRE PROTECTION
Wet pipe sprinkler system, extend exist'g
660
SF
7.50
4,950
4,950
MECHANICAL
Demolition - CEBAF Center Power & Chilled Wtr Upgrade
Tie-in to Existing
1
UG Piping (6" CHWS/R)
2000
Misc. Piping
1
Tertiary Pumps
2
EA
LF
LS
EA
35000.00
27.50
10000.00
1030.00
35,000
55,000
10,000
2,060
EA
EA
EA
EA
EA
EA
EA
LF
EA
LF
EA
LF
EA
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
521,165.00
53,532.00
24,600.00
102,010.00
21,850.00
28,248.00
5,082.10
454.40
9,336.00
262.35
2,437.00
171.40
1,989.60
150,000.00
3,520.00
75,000.00
50,000.00
35,000.00
84,660.00
16,900.00
8,500.00
235,950.00
85,000.00
100,000.00
521,165
53,532
24,600
102,010
65,550
282,480
10,164
113,600
102,696
65,588
17,059
342,800
129,324
150,000
3,520
75,000
50,000
35,000
84,660
16,900
8,500
235,950
85,000
100,000
1
1
1
1
3
10
2
250
11
250
7
2000
65
1
1
1
1
1
1
1
1
1
1
1
TOTAL MECHANICAL
2,777,158
10
Ewing Cole
9.0
ELECTRICAL
Chiller Building Expansion
Power Distribution
Mods to existing bldg panels
Grounding
3/0 copper cable
Bronze bondong plate
Exothermic weld - cable to column
Ground rod
Exothermic weld - cable to cable
Exothermic weld - cable to rod
Exothermic weld - cable to rebar
Test well sleve and cover
LS
1,194.19
1,194
130
2
2
2
2
2
1
1
LF
EA
EA
EA
EA
EA
EA
EA
6.25
61.34
81.68
121.13
81.68
81.68
81.68
175.48
813
123
163
242
163
163
82
175
30
1
80
390
130
1
3
1
LF
EA
LF
LF
LF
EA
EA
EA
55.47
1,225.21
56.76
8.03
3.45
579.23
2,813.75
386.68
1,664
1,225
4,541
3,131
449
579
8,441
387
EA
984.56
985
80
1
1
LF
EA
EA
44.73
1,794.42
531.24
3,578
1,794
531
130
1
1
LF
EA
EA
27.81
5,247.08
222.17
3,615
5,247
222
1
1
50
30
1
80
1
1
40
1
EA
EA
LF
LF
EA
EA
EA
EA
LF
EA
1,265.63
19,255.50
175.52
44.73
531.24
27.81
1,319.22
324.27
12.35
51.90
1,266
19,256
8,776
1,342
531
2,225
1,319
324
494
52
660
660
660
SF
SF
SF
3.94
5.30
3.79
2,600
3,500
2,500
660
SF
3.03
2,000
ELECTRICAL (Cont)
CEBAF Center HVAC Upgrades
Mechanical Rooms
Mods to existing panelboards
Room reconfigurations Demo/new work
Temporary Chiller - connect/disconnect
Demo existing pump wiring
50A feeder (3 pumps)
1
1
1
2
300
LS
LS
EA
EA
LF
5,000.00
6,500.00
10,000.00
492.28
61.80
5,000
6,500
10,000
985
18,541
9.0
11
Ewing Cole
3
3
160
2
EA
EA
LF
EA
949.62
108.55
6.52
49.83
2,849
326
1,043
100
1
1500
10
LS
LF
EA
10,000.00
24.46
128.93
10,000
36,686
1,289
1
1
1
100
1
1
1
4
200
100
1
100
3
EA
EA
EA
LF
EA
LS
EA
EA
LF
LF
EA
LF
EA
110,000.00
2,883.79
5,605.88
230.67
7,717.88
440,000.00
2,096.33
2,883.79
230.67
323.84
2,250.19
323.84
666.19
110,000
2,884
5,606
23,067
7,718
440,000
2,096
11,535
46,133
32,384
2,250
32,384
1,999
897,067
12
Ewing Cole