Transient instability occurs - after large and sudden changes in generation, load or transfer capacity - or as a consequence of low voltages or negative damping Classical problem
Olof Samuelsson
Summer 2000
Basic phenomenon
Time scale: s Imbalance between accelerating and decelerating generator torque Temporary (negative) surplus energy is stored in the rotating masses Capture range of synchronizing torque is limited Pull-out torque or power Stability/synchronized operation may be lost.
Olof Samuelsson
Summer 2000
Mechanical analogs
Synchro demo feel the synchronizing and pull-out torques Synchronous generator has fEfd=0 and rotor speed 50 Hz Synchro has fEfd=50 Hz and rotor speed Stator frequency is 50 Hz in both cases Spring and rotating mass Inertia Torque Length of spring xdI
Olof Samuelsson
Summer 2000
Important factors
Disturbance type and severity Disturbance location Disturbance duration Operating point
Olof Samuelsson
Summer 2000
Analysis methods
Three stages pre-fault, during fault, post-fault periods - Time simulation - (Extended) Equal Area Criterion - Energy functions
Olof Samuelsson
Summer 2000
Olof Samuelsson
Summer 2000
Energy functions
or Direct stability analysis Quantifies system energy as V=Ep+Ek System stable is dV/dt 0 Eliminates time simulation Useful for design of stabilizing control laws
Olof Samuelsson
Summer 2000
Modeling considerations
Generators Power-angle relationship, rotor saliency Controls AVR, PSS, (governor) Damper windings not efficient Protection Preset delay Breaker operating time Loads Usually very simple models
Olof Samuelsson
Summer 2000
AVR
- Improves first swing stability - Time/phase lag reduces damping - Reduces stability at following swings - Compensated by Power System Stabilizer
Olof Samuelsson
Summer 2000
Olof Samuelsson
10
Summer 2000
Olof Samuelsson
11
Summer 2000
EPRI TSAT
Transient stability Security Assessment Tool EPRI and PowerTech Labs Inc. - Time simulation - EAC - Contingency ranking - Analyzes the current operating point - Typical cycle time of 20 minutes