Вы находитесь на странице: 1из 4

AW

7.05 DIRECT a

Providing and laying cement concrete / reinforced cement concrete for foundation and sub-structure excluding cost of reinforcement with all leads and lifts as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. and as directed by Engineer
UNIT CUM M25 sqm FORM WORK RATE PER CUM RATE Precast - pretensioned Girders Providing, precasting, transportation and placing in position precast pretensioned concrete girders as per drawing and technical specifications Unit = 1 cum Taking output = 1 cum Grade of concrete - M40 a) Material Cement tonne Coarse sand cum 20 mm Aggregate cum 10 mm Aggregate cum Admixture @ 0.4 per cent of cement Kg b) Labour (i) Cutting, bending, making reinforcement cage, placing in position, binding etc. complete Taking quantity of steel 100 Kg/cum of concrete including laps and wastage Mate day Mazdoor (Skilled) day Mazdoor day (iv) Concreting by Batching plant and stationary concrete pump Mate day Mazdoor (Skilled) day Mazdoor day (v) Steam curing and manual curing Mate day Mazdoor day c) Machinery i) At casting yard Generator 100 KVA hour Batching Plant @ 20 cum/hour hour Transit Mixer 4 cum capacity hour Concrete Pump stationary hour ii) For transportation and placement at site Crane 35 tonne capacity hour Trailer 30 tonne capacity for transporting to site. tonne.km (L - Lead in Kilometer) Trailor 30 tonne capacity during placement. hour Page 1

7.07

AW Cost of formwork, steam curing arrangement, pretensioning arrangement etc @ 5 per cent of cost material, labour and machinery d) Overhead charges @ on (a+b+c) e) Contractor's profit @ on (a+b+c+d) Rate per cum = (a+b+c+d+e) FORM WORK RATE

7.09

1800

High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications Unit = 1 MT Taking output = 0.377 MT Details of cost for 12T13 strand 40 m long cable (weight = 0.377 MT) a) Material H.T. Strand @ 9.42 kg/m including 2 per cent for wastage and extra length for jacking Sheathing duct ID 66 mm along with 5 per cent extra length 40 x 1.05 = 42 m. Tube anchorage set complete with bearing plate, permanent wedges etc Cement for grouting including 3 per cent wastage @ 3.00 kg/m = 3 x 1.03 x 40 = 123.60 kg (say, = 125 kg) Add 0.50 per cent cost of material for Spacers, Insulation tape and miscellaneous items b) Labour i) For making and fixing cables, anchorages Mate Blacksmith Mazdoor ii) For prestressing Mate/Supervisor Prestressing operator / Fitter Mazdoor iii) For grouting Mate/Supervisor Mason Mazdoor c) Machinery Stressing jack with pump Grouting pump with agitator Generator 33 KVA. d) Overhead charges @ on (a+b+c) e) Contractor's profit @ on (a+b+c+d) Cost for 0.377 MT (a+b+c+d+e) Rate per MT = (a+b+c+d+e)/0.377 Note Cost of HT steel has been taken for delivery at site. Hence carriage has not been considered. Page 2

tonne metre each tonne

day day day day day day day day day hour hour hour

AW

250

2,535.00 750

3,285.00

0.47 0.45 0.54 0.36 1.88

3600.00 535.00 401.00 401.00 34.00

1692.00 240.75 216.54 144.36 63.92

0.00 0.00 0.00 0.00 0.00

0.06 0.35 1.40

200.00 175.00 150.00

12.00 61.25 210.00

0.00 0.00 0.00

0.03 0.05 0.60 0.01 0.35

200.00 175.00 150.00 200.00 175.00

6.00 8.75 90.00 2.00 61.25

0.00 0.00 0.00 0.00 0.00

0.05 0.05 0.10 0.05 0.15 2.5xL 0.15

562.00 1450.00 660.00 173.00 0.00 0.00

28.10 72.50 66.00 8.65

d 11.00 0.00 16.00

0.00 20.00 0.00 Lead = km & a 0.00 4.00 Page 3

AW 149.20

say

0.00 0.00 3133.27 3133.00 750 3883

0.39 42.00 2.00 0.125

38448.00 0.00 0.00 3600.00

14802.48 0.00 0.00 450.00 762.62

0.00 0.00 0.00 0.00

0.16 1.00 3.00 0.05 0.25 1.00 0.05 0.25 1.00 2.50 1.00 3.50

200.00 250.00 150.00 200.00 0.00 150.00 200.00 300.00 150.00 #N/A 0.00 562.00

32.00 250.00 450.00 10.00 0.00 150.00 10.00 75.00 150.00 #N/A 0.00 1967.00 #N/A #N/A #N/A #N/A #N/A

0.00 F 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 b

say

Page 4

Вам также может понравиться