Uplift calculated under weir floor by Khosla theory

Sukkur River Sluices


Upstream water level=
Downstream water level=
Differential head=

194
176
18

Upstream datum=
Total horizontal length of floor, b=

176
190.00

Top of floor
Bottom of floor
Bottom of pile
Thickness of floor on upstream
Thickness of floor on downstream
Depth of pile from reference datum, d=

Pile 1
176
172
159.92
4
4
16.08

Pile 2
176
165
145
11
11
31.00

Pile 3
176
165
153
11
11
23.00

Pile 4
175
171
159
5
5
17.00

Distance of pile from u/s end of floor, b1=


Distance of pile from d/s end of floor, b2=

5.00
185.00

45.5
144.50

115
75.00

185
5.00

alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

0.31
11.50
1.05
11.55
6.30
-5.25

1.47
4.66
1.78
4.77
3.27
-1.50

5.00
3.26
5.10
3.41
4.25
0.84

10.88
0.29
10.93
1.04
5.99
4.94

Phi C=
Phi E=
Phi D=

96.10
73.58
81.38

77.62
54.84
65.11

51.17
35.73
43.64

27.11
3.79
19.07

Depth corrections
Depth correction for point C
Depth correction for point E

-3.66
1.94

-4.44
3.64

-3.60
3.78

-2.36
4.49

Correction for influence of upstream pile on phi C


Depth of pile measured from from bottom of the floor, d1=
Depth of upstream pile measured from from bottom of the floor, d2=
Distance from upstream pile, SP=
Cic=

12.08
0.00
0.00
0.00

20.00
5.08
40.50
0.89

12.00
20.00
69.50
1.72

12.00
18.00
70.00
1.52

Correction for influence of downstream pile on phi E


Depth of pile measured from from bottom of the floor, d1=
Depth of downstream pile measured from from bottom of the floor, d2=
Distance from downstream pile, SP=
Cie=

12.08
27.00
40.50
3.19

20.00
12.00
69.50
1.33

12.00
6.00
70.00
0.53

12.00
0.00
0.00
0.00

0.00
0.00
4.50

0
45.60
69.50

0
38.5
69.50

0
58.5
70.00

0.00
20.60
0.00

-1
20.60
0.00

-1
20.60
0.00

-1.00
20.60
0.00

0.00
0.00
40.50

0
38.5
69.50

0
58.5
70.00

0.00
0.00
0.00

0.00
20.60
0.00

0
20.60
0.00

-1
20.60
0.00

0.00
20.60
0.00

92.44
78.71

72.29
59.82

45.85
40.04

23.22
8.28

192.64
190.17

189.01
186.77

184.25
183.21

180.18
177.49

Slope correction on phi c


S=
Horizontal length of slope, L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=

Slope correction on phi E


S=
L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=
Corrected phi values
Corrected phi C=
Corrected phi E=
Piezometric level upstream
Piezometric level downstream

Uplift calculated under weir floor by Khosla theory


Sukkur River Sluices
Upstream water level=
Downstream water level=
Differential head=

Upstream datum=
Total horizontal length of floor, b=

194
176
18

171
190.00
Pile 1
171
167
155
4
4
16.00

Pile 2
173
165
145
6
6
26.00

Pile 3
173
165
153
6
6
18.00

Pile 4
171
167
155
4
4
16.00

5.00
185.00

45.5
144.50

115
75.00

185
5.00

alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

0.31
11.56
1.05
11.61
6.33
-5.28

1.75
5.56
2.02
5.65
3.83
-1.82

6.39
4.17
6.47
4.28
5.38
1.09

11.56
0.31
11.61
1.05
6.33
5.28

Phi C=
Phi E=
Phi D=

96.09
73.64
81.42

76.28
56.83
65.72

49.46
37.28
43.50

26.36
3.91
18.58

Depth corrections
Depth correction for point C
Depth correction for point E

-3.67
1.94

-2.44
2.05

-1.99
2.07

-1.94
3.67

Correction for influence of upstream pile on phi C


Depth of pile measured from from bottom of the floor, d1=
Depth of upstream pile measured from from bottom of the floor, d2=
Distance from upstream pile, SP=
Cic=

12.00
0.00
0.00
0.00

20.00
10.00
40.50
1.49

12.00
20.00
69.50
1.72

12.00
14.00
70.00
1.16

Correction for influence of downstream pile on phi E


Depth of pile measured from from bottom of the floor, d1=
Depth of downstream pile measured from from bottom of the floor, d2=
Distance from downstream pile, SP=
Cie=

12.00
22.00
40.50
2.51

20.00
12.00
69.50
1.33

12.00
10.00
70.00
0.83

12.00
0.00
0.00
0.00

0.00
0.00
4.50

0
45.60
69.50

0
38.5
69.50

0
58.5
70.00

0.00
20.60
0.00

-1
20.60
0.00

-1
20.60
0.00

-1.00
20.60
0.00

0.00
0.00
40.50

0
38.5
69.50

0
58.5
70.00

0.00
0.00
0.00

0.00
20.60
0.00

0
20.60
0.00

-1
20.60
0.00

0.00
20.60
0.00

92.42
78.09

72.35
60.21

45.76
40.19

23.25
7.58

192.64
190.06

189.02
186.84

184.24
183.23

180.18
177.36

Top of floor
Bottom of floor
Bottom of pile
Thickness of floor on upstream
Thickness of floor on downstream
Depth of pile from reference datum, d=
Distance of pile from u/s end of floor, b1=
Distance of pile from d/s end of floor, b2=

Slope correction on phi c


S=
Horizontal length of slope, L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=

Slope correction on phi E


S=
L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=
Corrected phi values
Corrected phi C=
Corrected phi E=
Piezometric level upstream
Piezometric level downstream

Uplift calculated under weir floor by Khosla theory


Sukkur River Sluices
Upstream water level=
Downstream water level=
Differential head=

Upstream datum=
Total horizontal length of floor, b=

194
176
18

171
190.00
Pile 1
171
165
153
6
6
18.00

Pile 2
173
165
145
6
6
26.00

Pile 3
173
165
153
6
6
18.00

Pile 4
171
165
153
6
6
18.00

5.00
185.00

45.5
144.50

115.5
74.50

185
5.00

alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

0.28
10.28
1.04
10.33
5.68
-4.64

1.75
5.56
2.02
5.65
3.83
-1.82

6.42
4.14
6.49
4.26
5.38
1.12

10.28
0.28
10.33
1.04
5.68
4.64

Phi C=
Phi E=
Phi D=

96.32
72.16
80.46

76.28
56.83
65.72

49.30
37.11
43.33

27.84
3.68
19.54

Depth corrections
Depth correction for point C
Depth correction for point E

-5.29
2.76

-2.44
2.05

-1.99
2.07

-2.76
5.29

Correction for influence of upstream pile on phi C


Depth of pile measured from from bottom of the floor, d1=
Depth of upstream pile measured from from bottom of the floor, d2=
Distance from upstream pile, SP=
Cic=

12.00
0.00
0.00
0.00

20.00
12.00
40.5
1.74

12.00
20.00
70
1.71

12.00
12.00
70.00
0.99

Correction for influence of downstream pile on phi E


Depth of pile measured from from bottom of the floor, d1=
Depth of downstream pile measured from from bottom of the floor, d2=
Distance from downstream pile, SP=
Cie=

12.00
20.00
40.50
2.25

20.00
12.00
70.00
1.32

12.00
12.00
70.00
0.99

12.00
0.00
0.00
0.00

0.00
0.00
4.50

0
45.60
69.50

0
38.5
70.00

0
58.5
70.00

0.00
20.60
0.00

-1
20.60
0.00

-1
20.60
0.00

-1.00
20.60
0.00

0.00
0.00
40.50

0
38.5
70.00

0
58.5
70.00

0.00
0.00
0.00

0.00
20.60
0.00

0
20.60
0.00

-1
20.60
0.00

0.00
20.60
0.00

91.03
77.18

72.10
60.20

45.60
40.18

24.08
8.97

192.39
189.89

188.98
186.84

184.21
183.23

180.33
177.61

Top of floor
Bottom of floor
Bottom of pile
Thickness of floor on upstream
Thickness of floor on downstream
Depth of pile from reference datum, d=
Distance of pile from u/s end of floor, b1=
Distance of pile from d/s end of floor, b2=

Slope correction on phi c


S=
Horizontal length of slope, L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=

Slope correction on phi E


S=
L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=
Corrected phi values
Corrected phi C=
Corrected phi E=
Piezometric level upstream
Piezometric level downstream

Uplift calculated under weir floor by Khosla theory


Reference: Hydraulics of Structures on Permeable Foundations (Seepage Flow) by Mushtaq Ahmad (1983)
Example 7.4 (page 507) Qadirabad Barrage
Upstream water level=
Downstream water level=
Differential head=

Upstream datum=
b=

884
872
12

Top of floor
Bottom of floor
Bottom of pile
Thickness of floor on upstream
Thickness of floor on downstream
Depth of pile from top of floor, d=

674
265.00
Pile 1
674
672
646
2
2
28.00

Pile 2
677
674
643.5
3
2
33.50

Pile 3
671
661
634
10
2
37.00

Pile 4
671
663
640
8
2
31.00

Distance of pile from u/s end of floor, b1=


Distance of pile from d/s end of floor, b2=

2.00
263.00

78.5
186.50

170.5
94.50

265
0.00

alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

0.07
9.39
1.00
9.45
5.22
-4.22

2.34
5.57
2.55
5.66
4.10
-1.55

4.61
2.55
4.72
2.74
3.73
0.99

8.55
0.00
8.61
1.00
4.80
3.80

Phi C=
Phi E=
Phi D=

99.01
71.15
79.95

71.40
54.31
62.37

50.12
32.12
41.48

30.16
0.00
20.91

Depth corrections
Depth correction for point C
Depth correction for point E

-1.36
0.63

-0.81
0.48

-2.33
0.51

-2.39
1.35

Correction for influence of upstream pile on phi C


Depth of pile measured from from bottom of the floor, d1=
Depth of upstream pile measured from from bottom of the floor, d2=
Distance from upstream pile, SP=
Cic=

26.00
0.00
0.00
0.00

30.50
28.00
76.5
2.54

27.00
17.50
92
1.39

23.00
29.00
92.50
2.09

Correction for influence of downstream pile on phi E


Depth of pile measured from from bottom of the floor, d1=
Depth of downstream pile measured from from bottom of the floor, d2=
Distance from downstream pile, SP=
Cie=

26.00
28.50
76.50
2.39

30.50
40.00
92.00
3.33

27.00
21.00
92.50
1.64

23.00
0.00
0.00
0.00

0.00
0.00
0.00

9
45.60
76.50

3
38.5
92.00

0
0
92.50

0.00
20.60
0.00

-1
1.41
-0.84

-1
4.67
-1.95

0.00
20.60
0.00

0.00
0.00
76.50

3
38.5
92.00

0
0
92.50

0.00
0.00
0.00

0.00
20.60
0.00

1
4.67
1.95

0
20.60
0.00

0.00
20.60
0.00

97.64
74.17

72.29
60.08

47.22
34.27

29.86
1.35

Slope correction on phi c


S=
Horizontal length of slope, L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=

Slope correction on phi E


S=
L=
SP=
Slope direction (+1 if slope d/s of pile slopes downward, -1 if upward, and
0 if no slope
CF=
Cs=
Corrected phi values
Corrected phi C=
Corrected phi E=

es

Annex A: Uplift calculated under weir floor by Khosla theory


Lakhay jo Wandio Madan Wai Weir
Pile No. 1
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

3
0.00
110.00
110.00
12.00
0.00
9.17
1.00
9.22
5.11
-4.11

Pile No. 2
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Phi C=
Phi E=
Phi D=

100.00
70.83
79.75

Phi C=
Phi E=
Phi D=

29.17
0.00
20.25

Depth correction for point C


Depth correction for point E

-2.23
5.06

Depth correction for point C


Depth correction for point E

-5.06
2.23

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci=
Corrected phi C=
Corrected phi E=

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

9.00
9.00
110.00
0.89

Summary
Total head (ft)

8
Percentahe pressures
phi C (%)
94.94
26.05
0.00

Pile 1
Pile 2
Pile 3

phi E (%)
73.95
5.06
0.00

Net Pressure head (ft)


Under C
Under E
7.595
5.916
2.084
0.405
0.000
0.000

Pile 1
Pile 2
Pile 3

Required thickness (ft.)

Exit gradient

9.00
9.00
110.00
0.89

94.94
73.95

Corrected phi C=
Corrected phi E=

Pile 1
Pile 2
Pile 3

3
110.00
0.00
110.00
12.00
9.17
0.00
9.22
1.00
5.11
4.11

Under C
Under E
8.167
6.361
2.241
0.436
0.000
0.000
0.094

1 in 10.65

26.05
5.06

Uplift calculated under weir floor by Khosla theory


Reference: Hydraulics of Structures on Permeable Foundations (Seepage Flow) by Mushtaq Ahmad (1983)
Example 7.3 (page 504) Trimmu Barrage
Pile No. 1
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Pile not at the end


3 thickness of slab at point E
1.00
139.00
140.00
19.00
0.05
7.32
1.00
7.38
4.19
-3.19

Phi C=
Phi E=
Phi D=

99.18
67.51
77.54

Depth correction for point C


Depth correction for point E

-3.42
1.58

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci=

13.00
18.00
72.00
2.10

Slope correction on phi E


S=
L=
SP=
Slope direction
CF=
Cs=

4.00
30.00
72.00
-1.00
3.49
-1.46

Corrected phi C=
Corrected phi E=

95.76
69.74

Pile No. 2
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Pile not at the end


3.5
74.00
66.00
140.00
22.00
3.36
3.00
3.51
3.16
3.34
0.17

Phi C=
Phi E=
Phi D=

57.97
38.56
48.34

Depth correction for point C


Depth correction for point E

-1.53
1.56

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

18.50
13.50
72.00
1.88

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci=

18.50
20.50
64.00
3.00

Slope correction on phi E


S=
L=
SP=
Slope direction
CF=
Cs=

0.00
0.00
72.00
0.00
20.60
0.00

Slope correction on phi C


S=
L=
SP=
Slope direction
CF=
Cs=

4.00
38.00
72.00
1.00
3.49
1.84

S=
L=
SP=
Slope direction
CF=
Cs=

4.00
30.00
72.00
-1.00
3.49
-1.46

Corrected phi C=
Corrected phi E=

54.95
43.11

Pile No. 3
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

+1 if slope d/s of pile slopes downward, -1 if upward

+1 if slope u/s of pile slopes upward, -1 if downward

+1 if slope u/s of pile slopes upward, -1 if downward

Pile not at the end


3.5
74.00
66.00
140.00
22.00
3.36
3.00
3.51
3.16
3.34
0.17

Phi C=
Phi E=
Phi D=

57.97
38.56
48.34

Depth correction for point C


Depth correction for point E

-1.53
1.56

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

18.50
13.50
72.00
1.88

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci=

18.50
20.50
64.00
3.00

Slope correction on phi E


S=
L=
SP=
Slope direction
CF=
Cs=

0.00
0.00
72.00
0.00
20.60
0.00

Slope correction on phi C


S=
L=
SP=
Slope direction
CF=
Cs=

4.00
38.00
72.00
1.00
3.49
1.84

S=
L=
SP=
Slope direction
CF=
Cs=

4.00
30.00
72.00
-1.00
3.49
-1.46

Corrected phi C=
Corrected phi E=

Pile No. 4
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

+1 if slope d/s of pile slopes downward, -1 if upward

54.95
43.11

Pile at the end


3.5
140.00
0.00
140.00
24.00
5.83
0.00
5.92
1.00
3.46
2.46

Phi C=
Phi E=
Phi D=

36.14
0.00
24.83

Depth correction for point C


Depth correction for point E

-1.65
3.62

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

20.50
18.50
64.00
2.85

Corrected phi C=
Corrected phi E=

31.64
3.62

+1 if slope d/s of pile slopes downward, -1 if upward

+1 if slope u/s of pile slopes upward, -1 if downward

+1 if slope u/s of pile slopes upward, -1 if downward

Uplift calculated under weir floor by Khosla theory


Reference: Hydraulics of Structures on Permeable Foundations (Seepage Flow) by Mushtaq Ahmad (1983)
Example 7.2 (page 499) Sukkur Barrage
For upstream and downstream toes of floor
t=
b=
1/alpha=

Pile No. 1
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

6
190
0.032

Pile not at the end


6
5.00
185.00
190.00
18.00
0.28
10.28
1.04
10.33
5.68
-4.64

Phi C=
Phi E=
Phi D=

96.32
72.16
80.46

Depth correction for point C


Depth correction for point E

-5.29
2.76

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci=

12.00
20.00
40.50
2.25

Corrected phi C=
Corrected phi E=

91.03
77.18

Pile No. 2
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Pile not at the end


6
45.50
145.00
190.50
26.00
1.75
5.58
2.02
5.67
3.84
-1.83

Phi C=
Phi E=
Phi D=

76.31
56.89
65.76

Depth correction for point C


Depth correction for point E

-2.43
2.05

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

20.00
12.00
40.50
1.74

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci=

20.00
12.00
70.00
1.32

Corrected phi C=
Corrected phi E=

72.14
60.26

Pile No. 3
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Pile not at the end


6
115.50
75.00
190.50
18.00
6.42
4.17
6.49
4.28
5.39
1.10

Phi C=
Phi E=
Phi D=

49.38
37.23
43.43

Depth correction for point C


Depth correction for point E

-1.98
2.07

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

12.00
20.00
70.00
1.71

Correction for influence of downstream pile on phi E


d1=
d2=
SP=
Ci1=

12.00
12.00
70.00
0.99

Corrected phi E=
Corrected phi C=

45.69
40.29

Pile No. 4
t=
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Pile at the end

Phi C=
Phi E=
Phi D=

6
185.50
5.00
190.50
18.00
10.31
0.28
10.35
1.04
5.70
4.66
27.80
3.67
19.52

Depth correction for point C


Depth correction for point E

-2.76
5.28

Correction for influence of upstream pile on phi C


d1=
d2=
SP=
Ci=

12.00
12.00
70.00
0.99

Corrected phi C=
Corrected phi D=

24.05
8.95

Uplift calculated under weir floor by Khosla theory


Reference: Hydraulics of Structures on Permeable Foundations (Seepage Flow) by Mushtaq Ahmad (1983)
Example 7.1 (page 496)
Pile No. 1

Pile not at the end

b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

0.00
150.00
150.00
18.00
0.00
8.33
1.00
8.39
4.70
-3.70

Phi E1=
Phi C1=
Phi D2=

100.00
69.47
78.84

Correction for influence of pile2 on phi C1


d1=
d2=
SP=
Ci1=

18.00
25.00
50.00
3.85

Corrected phi C1=

73.32

Pile No. 2
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=

Pile not at the end


50.00
100.00
150.00
25.00
2.00
4.00
2.24
4.12
3.18
-0.94

Phi E2=
Phi C2=
Phi D2=

70.93
49.43
59.59

Correction for influence of pile1 on phi E2


d1=
d2=
SP=
Ci1=

25.00
18.00
50.00
3.27

Corrected phi E2=

67.67

Correction for influence of pile3 on phi C2


d1=
d2=
SP=
Ci1=
Corrected phi C2=

Pile No. 3
b1=
b2=
b=
d=
alpha1=
alpha2=
L1=
L2=
Lambda=
Lambda1=
Phi E3=
Phi C3=
Phi D3=
Correction for influence of pile 2 on phi E3
d1=
d2=
SP=
Ci1=
Corrected phi E2=

25.00
18.00
100.00
2.31
51.75

Pile at the end


150.00
0.00
150.00
18.00
8.33
0.00
8.39
1.00
4.70
3.70
30.53
0.00
21.16

18.00
25.00
100.00
2.72
27.81