Sui Northern Gas Pipelines Limited (SNGPL) was incorporated as a private limited company in
1963 and converted into a public limited company in January 1964 under the Companies Act
1913, now Companies Ordinance 1984, and is listed on all the three Stock Exchanges of the
Country.
The Company took over the existing Sui - Multan System (349 km of 16 inch and 129 km of 10
inch diameter pipelines) from Pakistan Industrial Development Corporation (PIDC) and Dhulian Rawalpindi - Wah system (132 km of 6 inch diameter pipeline) from Attock Oil Company Limited.
The Company's commercial operations commenced by selling an average of 47 MMCFD gas in
two regions viz. Multan and Rawalpindi, serving a total number of 67 consumers.
SNGPL is the largest integrated gas company serving more than 2.95 million consumers in North
Central Pakistan through an extensive network in Punjab and NWFP. The Company has over 44
years of experience in operation and maintenance of high-pressure gas transmission and distribution
systems. It has also expended its activities to undertake the planning, designing and construction
of pipelines, both for itself and other organization.

Annual Report 2007

41

Vital Information
THE MANAGEMENT
A. Rashid Lone
Managing Director
Abrar Ahmed
Senior General Manager (Engineering Services)
Pervaiz Azeez Khan
Senior General Manager (Human Resource)
Mujahid Anwar
Senior General Manager (Distribution)
Nadeem Shahryar
Senior General Manager
(Corporate Planning & Development)
Imdad Hussain
Senior General Manager (Consumer Services)
Hasnath Aziz Banth
Senior General Manager (Projects)
Khalid Walid Sharaq
Senior General Manager (Transmission)
Amer Tufail
Chief Financial Officer
Waqar Nisar
Chief Information Officer

42

Sui Northern Gas Pipelines Limited

Uzma Adil Khan


FCA
Company Secretary /
Secretary to Sub Committees of the Board
Joint Auditors
Ford Rhodes Sidat Hyder & Co.
Chartered Accountants
Riaz Ahmad & Co.
Chartered Accountants
Shares Registrar
M/s. Hameed Majeed Associates (Pvt) Ltd.,
H.M.House, 7-Bank Square, Lahore.
Ph: 092 - 42 - 7235081 - 82
Fax: 092 - 42 - 7358817
Legal Advisors
M/s. Surridge & Beecheno
M/s. Salim Baig and Associates
Registered Office
Gas House,
21-Kashmir Road, P.O. Box No. 56
Lahore - 54000 (Pakistan)
Ph: 092 - 42-9201451 - 60, 9201419
Fax: 092 - 42 - 9201369, 9201302
E-mail: info@sngpl.com.pk
website: www.sngpl.com.pk

The Management

A. Rashid Lone
MD / CEO

Abrar Ahmed
SGM (ES)

Pervaiz Azeez Khan


SGM (HR)

Mujahid Anwar
SGM (D)

Nadeem Shahryar
SGM (CP&D)

Imdad Hussain
SGM (CC)

Hasnath Aziz Banth


SGM (P)

Khalid Walid Sharaq


SGM (T)

Amer Tufail
CFO

Waqar Nisar
CIO

Annual Report 2007

43

SNGPL

Serves each Customer with the same dedication

Milestones
1964 1969

Project I

Extension of Sui-Multan section to Faisalabad and


Lahore and then linked with Dhulian-Rawalpindi-Wah
system to form a common grid.

1970 1971

Project II

Increased system capacity from 170 MMCFD to


205 MMCFD.

1971 1973

Project III

Supplies of gas further extended to major cities in


the NWFP. System capacity increased to 277
MMCFD.

1974 1981

Project IV

Erection of 2 x 100 MMCFD purification banks at


Sui, installation of 34,700 HP compression stations.
System capacity enhanced to 387 MMCFD.

1985 1991

Project V

Increased system capacity to 450 MMCFD,


constructed purification bank of 120 MMCFD capacity
at Sui.

1989 1998

Project VI

1200 km pipeline laid and 53,370 HP additional


compression stations installed. System capacity
enhanced to 980 MMCFD

2001 2003

Project VII

560 km pipeline laid and 25,000 HP additional


compression stations installed. System capacity
enhanced to 1380 MMCFD

2003 2005

Project VIII

803 km transmission pipeline laid to increase system


capacity upto 1680 MMCFD.

2005 2006

Gas Supply to
Lilla Town

Completed a pilot project (Phase-I) for supply of gas


to Lilla Town through CNG by establishing MotherDaughter system.

2006 2007

Gas Supply to
Murree

Completed a project for supply of gas to Murree.


Gas supply to 21 No. Southern district of Punjab &
NWFP.

2006 2008

Project IX

Being undertaken to absorb additional gas supply


from newly discovered gas fields.

Annual Report 2007

45

Decade at a Glance
BALANCE SHEET - SUMMARY

Paid up share capital


Revenue reserves
Deferred credit
Non-Current liabilities
Long term loans outstanding
Local
Foreign
Banking companies
Long term security deposits
Deferred liabilities - taxation
Deferred liabilities - others
Current Liabilities
Represented by:
Non - Current Assets
Current Assets

(Rupees in thousand)
2007

2006

2005

5,491,053
10,798,422
23,108,412

4,991,866
10,116,826
16,663,770

4,991,866
7,892,142
10,279,438

2,194,721
1,515,460
662,500
7,270,407
6,752,570
298,026
25,559,287

3,428,613
2,045,483
1,949,084
5,865,779
6,046,992
312,654
25,815,502

4,068,020
2,536,780
3,473,672
5,279,975
6,112,252
381,719
19,998,166

83,650,858

77,236,569

65,014,030

50,287,624

43,789,649

40,659,914

33,363,234

33,446,920

24,354,116

83,650,858

77,236,569

65,014,030

122,091,652
(9,514,600)
112,577,052
99,168,250
13,408,802

107,897,291
(2,046,177)
105,851,114
91,986,318
13,864,796

84,710,404
(1,333,069)
83,377,335
71,192,390
12,184,945

828,140
673,241
591,354
78
1,855,118

744,955
534,470
472,879
1,828,399

699,036
646,662
397,671
918,747

17,356,733

17,445,499

14,847,061

12,005,044
860,715
241,324

10,799,936
1,180,203
346,300

9,289,124
1,054,730
241,730

PROFIT AND LOSS - SUMMARY


INCOME
Sales
Add/(Less) differential margin/development surcharge)
Net Sales
Cost of Gas sold
Gross profit
Rental and service income
Surcharge on interest on gas sales arrears
Amortization of deferred credit
Operating profit/(Loss)-LPG
Share of profit from associate
Other operating income
EXPENDITURE
Operating Expenses
Finance Cost
Other charges

13,107,083

12,326,439

10,585,584

PROFIT BEFORE TAXATION


PROVISION FOR TAXATION

4,249,650
1,571,307

5,119,060
1,396,816

4,261,477
1,525,499

PROFIT AFTER TAXATION

2,678,343

3,722,244

2,735,978

Earning per share (Basic)/(Rupees)


DIVIDEND (%)
BONUS SHARES (%)

4.88
30
-

6.78
30
10

4.98
30
-

NUMBER OF EMPLOYEES

6,712
209
6,921

6,852
249
7,101

6,904
264
7,168

GAS SALES (MMCF)


CONSUMERS (IN NUMBERS)

576,658
2,953,818

571,481
2,723,225

537,086
2,516,795

CUSTOMERS (IN NUMBERS) - Industrial


- Commercial
- Domestic

4,425
45,925
2,869,208

3,773
43,919
2,641,273

3,271
41,358
2,437,541

2,919,558

2,688,965

2,482,170

6,625
52,394

6,195
46,964

6,121
42,285

- Operation
- Project

TRANSMISSION AND DISTRIBUTION SYSTEM (in Kilometers)


Transmission mains
Distribution mains and services

46

Sui Northern Gas Pipelines Limited

2004

2003

2002

2001

4,991,866
5,861,970
8,098,044

4,991,866
3,564,492
4,328,300

4,991,866
2,648,937
3,980,851

4,991,866
1,760,485
3,820,602

3,036,539
2,992,191
5,035,759
4,441,952
5,546,779
1,989,201
14,930,469

3,711,707
3,414,091
5,471,154
3,744,461
4,986,297
1,560,203
11,528,019

4,506,818
3,805,052
4,254,384
3,301,454
4,551,906
1,075,325
12,511,306

56,924,770

47,300,590

45,627,899

2000

1999

1998

4,340,753
1,923,646
3,194,350

3,774,568
1,963,131
2,783,107

3,282,233
2,029,932
2,500,395

5,197,566
4,167,517
2,211,682
3,040,623
4,128,560
799,157
13,119,164

2,229,817
4,525,551
2,898,603
1,670,921
3,326,809
560,076
15,053,938

5,015,173
4,880,544
2,395,092
1,338,108
2,625,629
404,797
14,805,272

4,565,991
5,009,957
3,088,776
1,117,849
2,336,798
805,811
18,923,300

43,237,222

39,724,464

39,985,421

43,661,042

37,173,812

33,774,911

30,527,631

29,216,137

29,360,967

29,580,315

29,390,576

19,750,958

13,525,679

15,100,268

14,021,085

10,363,497

10,405,106

14,270,466

56,924,770

47,300,590

45,627,899

43,237,222

39,724,464

39,985,421

43,661,042

64,276,145
(70,064)
64,206,081
52,627,542
11,578,539

45,649,496
(3,189,416)
42,460,080
31,349,357
11,110,723

42,005,148
(4,084,195)
37,920,953
28,549,844
9,371,109

36,522,243
(2,442,668)
34,079,575
24,849,097
9,230,478

26,569,704
(1,019,657)
25,550,047
16,626,517
8,923,530

20,577,266
(1,665,855)
18,911,411
11,088,152
7,823,259

18,738,847
984,977
19,723,824
12,328,687
7,395,137

638,648
526,729
359,145
406,283

635,260
491,890
333,994
422,831

585,016
475,570
312,849
(3,192)
455,736

589,680
110,493
278,447
(13,807)
182,221

529,600
383,223
235,877
(6,426)
138,817

283,644
669,988
206,219
7,671
86,714

236,881
673,309
186,590
3,546
116,310

13,509,344

12,994,698

11,197,088

10,377,512

10,204,621

9,077,495

8,611,773

8,679,258
968,918
196,791

8,061,605
1,531,471
194,555

6,832,948
1,398,174
201,727

6,484,892
1,440,695
122,602

6,050,798
2,716,947
71,900

4,761,582
3,462,516
42,689

4,602,373
3,258,039
38,277

9,844,967

9,787,631

8,432,849

8,048,189

8,839,645

8,266,787

7,898,689

3,664,377
1,366,899

3,207,067
1,193,301

2,764,239
877,414

2,329,323
992,754

1,364,976
838,276

810,708
385,174

713,084
327,630

2,297,478

2,013,766

1,886,825

1,336,569

526,700

425,534

385,454

4.18
25
-

3.67
22
-

3.44
20
-

2.43
17
-

0.95
15

0.77
15

0.70
15

7,070
259
7,329

7,240
208
7,448

7,417
182
7,599

7,607
96
7,703

7,716
86
7,802

7,808
142
7,950

7,836
302
8,138

452,338
2,340,872

341,643
2,208,968

321,957
2,113,847

308,111
2,021,857

284,338
1,922,289

253,104
1,782,600

231,556
1,672,548

2,881
38,842
2,263,875

2,669
37,471
2,133,554

2,548
37,622
2,038,403

2,475
39,128
1,944,980

2,672
40,675
1,843,662

2,337
38,869
1,706,114

2,316
37,231
1,598,256

2,305,598

2,173,694

2,078,573

1,986,583

1,887,009

1,747,320

1,637,803

5,776
38,284

5,759
35,814

5,405
34,093

5,122
32,825

5,217
31,477

5,112
29,954

4,920
28,661

Annual Report 2007

47

2
1.
2.

President General Pervez Musharraf inaugurated a mega project of gas supply to Southern Districts of Punjab.
Prime Minister Shaukat Aziz Inaugurated Gas supply to Swabi villages.

48

Sui Northern Gas Pipelines Limited

4
3.
4.
5.

5
Mrs. Zubaida Jalal Fedral Minister, and Doctor Firdous Ashiq Awan Parliamentary Secretary jointly, inaugurated
Gas supply to villages Chak Ghallah, Chak sarwani and Daultanwali.
Cheif Minister NWFP at gas supply to village Regi.
Chief Minister Punjab inaugurates gas supply to Talagang.

Annual Report 2007

49

8
Gas Sales Agreement Signing Ceremonies between SNGPL V/s.
6. M/s Engro Chemical Pakistan Limited.
7. M/s DEL.
8. M/s OPCL.

50

Sui Northern Gas Pipelines Limited

10

11

Gas Sales Agreement (GSA) Ceremonies between SNGPL V/s.


9. M/s Saif Power.
10. M /s Hallmore Power Generation Company (Pvt) Limited.
11 M /s Savari Power (Pvt) Limited

Annual Report 2007

51

13

12

14

15

17

16
12.
13.
14.
15.
16 & 17.
52

SNGPL signed an agreement for sponsoring a chair in Punjab University.


Prime Minister of Azad Jammu & Kashmir and MD SNGPL discuss local matters.
A Presentation on Performance Management Systems made by the HR Department.
Flag hoisting ceremony on the Independence Day.
Sui Northern Executive Officers Association hosted annual dinner during 2007.
Sui Northern Gas Pipelines Limited

18

19

21
18.
19.
20.
21.
22.

20

22
Eid Mailad-un- Nabi celebrated at Head Office.
Burning calories during the race in the annual sports 2006-07.
Trophies for the winners.
The overall winning team of annual sports 2006-07.
Traditional Kabadi event could not be missed from the annual sports.
Annual Report 2007

53

Transmission System
As on June 30, 2007

SR. #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

54

SECTION
PIRKOH - SUI
LOTI - PESHBOGI
SUI - MULTAN
SUI - MULTAN
SUI - MULTAN
SUI - MULTAN
SUI - MULTAN
K1 MP-37.88
SHER SHAH X-ING
AC1X AV7 (RYK)
AV17 - AV 20
AV21 AV 22
GUDDU THERMAL POWER STATION
GUDDU CROSSING - 1
GUDDU CROSSING - 2
SUTLEJ CROSSING - 1
SUTLEJ CROSSING - 2
KHANPUR LINE
A5 - BAHAWALPUR
AV22 - KOT ADDU
AV22 - KOT ADDU
D. G. KHAN LINE
DHODAK - KOT ADDU
TPS MUZAFFARGARH LINE
QADIRPUR - AC-1X LINE
QADIRPUR - AC-1X LINE
MUBARAK LINE
KAND KOT LINE
SAWAN - QADIRPUR LINE
AHMEDPUR EAST
KHAN GARH
MULTAN - FERTILIZER LINE
JAHANIAN LINE
MULTAN - SIDHNAI
MULTAN - SIDHNAI
MULTAN - SIDHNAI
MULTAN - SIDHNAI
AV29 - SAHIWAL
SIDHNAI - FAISALABAD
SIDHNAI - FAISALABAD
SIDHNAI - FAISALABAD
SIDHNAI - FAISALABAD
SIDHNAI X-ING - AC-7
T.T. SING - JHANG
SAHIWAL - LAHORE
AC8 - SMSII (OLD)
AC8 - A11
WAPDA OFFTAKE FSD
CHAK JHUMRA LINE
FSD - MALIKWAL
FSD - MALIKWAL
FSD - MALIKWAL

Sui Northern Gas Pipelines Limited

DIA
(Inches)

MAINLINE
(kilometers)

24
18
16
18
24
30
36
20
36
36
36
36
4
24
36
12
36
6
8
16
20
8
16
16
30
36
16
16
24
6
8
10
8
18
24
30
36
24
18
24
30
36
36
8
18
16
20
12
6
12
16
30

70.50
11.25
2.11
321.66

2.41
1.81
1.61
22.81
48.18
69.65
72.06
77.79
4.57
70.26
35.48
52.23
131
18.34
22.20
1.430
30.49
22.46
145.45

30.28
142.93
2.42
12.04
70.74

LOOPLINE
(kilometers)

256.82
347.38
213.68
20.68
2.20
26.96
3.50
27.79
1.81
3.22
2.04

38.01

70.00

46.7
22.46
46.70
48.38
163.58
50.24
53.29
26.42
33.26
5.90
0.66

158.67
90.82

SR. #
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

SECTION
MALAKWAL - JHELUM CROSSING
CHENAB CROSSING CHINIOT
CHENAB CROSSING CHINIOT
KOT MOMIN - JOHARABAD (1)
KOT MOMIN - JOHARABAD (2)
JOHARABAD - CHASHMA
SARGODHA LINE
FSD - SHAHDARA
FSD - SHAHDARA
BC1 - FAROOQ ABAD
SHAHDARA - LAHORE
RAVI CROSSING (1)
RAVI CROSSING (2)
SHAHDARA - WAPDA LAHORE
KHURRIANWALA - JARANWALA
DAWOOD HERCULES LINE
SHEIKHUPURA - GUJRANWALA (1)
SHEIKHUPURA - GUJRANWALA (2)
KOTLI - RAHWALI (BV13)
HAFIZABAD LINE
SHAHDARA - GUJRANWALA - RAHWALI
RAHWALI - GUJRAT
RAHWALI - SIALKOT
SIALKOT O/T - WAZIRABAD
SAHIWAL - LAHORE
PHOOL NAGAR - DAWOOD HERCULES
GUJRAT - JHELUM
SARAI ALAMGIR - MIRPUR
MALIKWAL - HARANPUR - DANDOT
MALIKWAL - HARANPUR - DANDOT
CC1 - C4
C4 - CHAKWAL CEMENT
HARANPUR - GHARIBWAL
DANDOT - GALI JAGIR - WAH
DANDOT - GALI JAGIR - WAH
DANDOT - GALI JAGIR - WAH
DHULIAN - GALI JAGIR
DAKHNI - MEYAL - DHULIAN
CV13a - CC1
C10 - ISMAILKOT
RATANA LINE
SIL CROSSING
DHURNAL LINE (1)
DHURNAL LINE (2)
DHULIAN - DAUDKHEL
GALI JAGIR - MORGAH (1)
GALI JAGIR - MORGAH (2)
WAH - ISLAMABAD
WAH - HATTAR - HAVELIAN
WAH - HATTAR
HATTAR - HARIPUR
HATTAR OFFTAKE

DIA
(Inches)
16
18
30
8
6
8
6
16
24
8
16
16
10
10
8
12
10
16
18
8
10
8
8
18
16
16
8
8
12
16
30
10
8
10
16
30
10
16
16
16
10
10
8
10
8
10
6
6
16
10
10
6

MAINLINE
(kilometers)
1.13
2.32
72.41
38.36
82.21
22.90
60.84
22.96
2.51
0.58
3.41
5.87
59.44
30.76
43.00
73.4
35.46
43.58
63.95
54.27
35.85
4.78
24.00
13.02
151.92
40.14
50.44
2.49
0.54
11.08
85.2
21.43696
9.50
12.06
9.93
18.12
0.39

LOOPLINE
(kilometers)
5.42

119.25
55.03
2.99
0.58
22.53
44.57

43.58
19.82
143.36

20.00
29.09

153.51
64.22
29.85
3.58
14.64
1.46
4.04

81.29

Annual Report 2007

55

Transmission System
As on June 30, 2007

SR. #
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
144
145
146
147
148
149
151
152
153
154

SECTION
HARIPUR - MANSEHRA
HARIPUR OFFTAKE
ADHI - RAWAT
RAWAT - MURREE
BHANGALI LINE
MISSA KASWAL - MANDRA
WAH - NOWSHERA (1)
WAH - NOWSHERA (2)
TAXILA LINE
SANJWAL LINE
KOHAT LINE
NOWSHERA - ISMAILKOT (1)
NOWSHERA - ISMAILKOT (2)
ISMAILKOT - TURNAB
ISMAILKOT - TURNAB
ISMAILKOT - TURNAB
SHAKARDARA - DAUDKHEL
SHAKARDARA END POINT - F3
KHARAPPA - SHAKARDARA
NOWSHERA - MDN - TAKHTBAI - S/KOT
SAKHAKOT - SWAT
NOWSHERA - CHARSADDA
CHARSADDA - TURANG ZAI LINE
SADQAL - NAUGAZI LINE
TANGI LINE
DASKA - PASROOR LINE
FAUJI KABIR WALA LINE
OKARA - DIPALPUR LINE
CHARSADHA - KHAZANA SUGAR MILLS
CHARSADHA - KHAZANA DOLATPURA
JAHANGIRA - SWABI - TOPI
KABUL CROSSING JAHANGIRA ON TOPI LINE
ROUSCH POWER PLANT LINE
PINDORI - BHANGALI LINE
MIANWALI LINE
CHACHAR FIELD LINE
MIAN CHUNNUN - MACHIWAL
AV-40 - DIJKOT - TANDLIANWALA
SUKHO - RAWAT
DIPALPUR - BASIRPUR
MANGA - PACKAGES LINE( RENTED POWER )
RENTED POWER - SHEIKHUPURA
RODHO - KOT QAISRANI LINE
KHURAPPA - KARAK - KURRUM - MUNJOWAL
JARMA - HUNGO
MUNJOWAL - PEZU
PEZU - TANK

DIA
(Inches)

MAINLINE
(kilometers)

8
8
10
12
8
8
10
16
4
6
8
8
6
8
6
16
10
10
8
8
8
8
6
16
6
8
8
8
8
6
8
16
16
8
8
8
12
8
16
8
8
12
12
12
8
8
8

70.53
1.53
47.70
57.25
5.82
20.60
75.51

TOTAL
GRAND TOTAL

56

Sui Northern Gas Pipelines Limited

76.27

4.43
6.67
54.27
11.97

11.97
20.85

20.86

21.24

43.11
1.55
25.50
57.99
68.06
23.59
10.36
19.02
13.87
24.86
5.86
16.83
22.64
0.34
40.29
0.30
4.70
15.83
17.80
2.87
48.20
16.61
33.24
22.64
36.65
0.43
14.50
84.42
36.00
53.29
31.51
3874.42

LOOPLINE
(kilometers)

2750.30

6624.72 km

Transmission System