Safety Advice Table of Contents
The greenhouse must be positioned and fixed on a flat level Introduction ......................................... 1
surface. Safety Advice ....................................... 2
Dispose of all plastic bags safely. Keep them out of the reach of General Order of Assembly ............ 2
small children. List of Parts ........................................... 3
Keep children and pets away from the assembly area until the Assemble Back .................................... 6
work is completed. Assemble Door ................................... 14
Always wear shoes, gloves and safety goggles when working. Assemble Front .................................. 17
In manufacturing all sharp edges and burs have been removed Assemble Sides ................................... 25
but caution should still be taken when handling metal parts. Prepare Shelves .................................. 30
Connect Sides to Back ...................... 31
Do not lean against or push the greenhouse during assembly.
Connect Sides to Front ..................... 33
Take special care not to touch overhead power lines with the
Assemble and Connect Gables ...... 36
aluminium profiles. Brace Sides ............................................ 40
Do not attempt to assemble the greenhouse in windy or wet Assemble and Install Roof Vent ..... 42
conditions. Install Circular Vent ........................... 44
Do not position your greenhouse in an area exposed to excessive Install Side and Roof Panels ............ 45
wind. Install Weather Stripping ................ 46
If using power tools or a step ladder always follow the Install Trim Plates ................................ 48
manufacturers safety instructions. Weather Strip and Hang Door ........ 49
Hot items such as recently used grills, blowtorches etc. must not Secure to Ground ................................ 50
be stored in the greenhouse. Install Trays and Bin Holder ............. 51
Store the polycarbonate panels in a cool dark place like a garage
until you are ready to use them.
Make sure the greenhouse complies with local building codes.
www.stcny.com 2 of 51
List of Parts
The greenhouse is shipped in two cartons. These cartons are heavy. Be careful when lifting them.
Wear proper safety gear including work shoes, gloves and goggles.
L03A 2 Step 4
L08A 1 Step 8
L03B 4 Step 4
L03C 1 Step 1
L03D 1 Step 1
L03E 3 Step 8
L10A 1 Step 10
L03F 1 Step 8
L03G 1 Step 8 L11A 1 Step 10
L03H 1 Step 8
L12A 2 Step 10
L04A 2 Step 3
L04B 2 Step 4
L04C 2 Step 4 L13A 2 Step 2
L04D 2 Step 4 L13B 1 Step 2
L04E 2 Step 17 L13C 1 Step 2
L04F 2 Step 1
Y1 2 Step 1
S03 4 Step 4
Y2 1 Step 1
Y5 1 Step 3
S09 2 Steps 1,3
Y6 1 Step 3
S10 2 Steps 1,3
Y7 2 Step 3
S12 1 Step 1
Y8 1 Step 3
Y10 4 Step 12
S19 2 Step 4
Y11 4 Step 12
S21 1 Step 8
Y12 3 Step 12
Y13 1 Step 12
S28 6 Steps 2,3
Y14 1 Step 10
S39 2 Step 4
Y15 2 Step 2
www.stcny.com 4 of 51
Trim Plate QTY Bracing Parts QTY
S06 24 Steps 1,3,9
L09A 2 Step 14
S07 8 Step 9
L09B 2 Step 14
S16 4 Steps 1,3
Hex Key 1 Steps 1,3,9
J02L 2 Step 14
J02R 2 Step 14
S23 3 Step 8
J03 2 Step 14
J04 1 Step 14
L15A 1 Step 2
rubber J01 63M Steps 13,15
stripping
S25 1 Step 10
S17L 1 Step 3
Anchor Clip and Peg QTY
S34 6 Step 16
S35 6 Step 16 S17R 1 Step 3
Connector QTY
! The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
1.1A Slide short side of connector S01 into channels of profiles L02A and L02B.
Line up last hole on connector S01 with hole in each profile.
IMPORTANT: The holes are not at the midpoint of the profile.
Arrange profile so the 28” portion will be the bottom when standing.
L02A L02B
1.1B Secure with S02 screws.
S01
28”
(711 mm)
S02
28”
NOTE: ALL VIEWS ARE FROM INSIDE.
(711 mm)
www.stcny.com 6 of 51
1.3A Attach profiles L02B and L03C to profile L04F by sliding the long sides of connector S01
into channels lining up last hole in S01 with holes in profile L04F. Attach profiles L03D
and L02A to profile L04F by sliding the long side of connector S01 into profile
channels lining up last hole of S01 with holes in L04A.
L04F
L02A
L04F
L03C L03D
L02B
L02A
L04F
L04F
#L04F 2 #S02 4
www.stcny.com 7 of 51
1.4A Slide connectors S08 into channels of profiles L03C and L03D.
L03D
L02B L03C
S02
L02A
S08
Connector QTY
S08 #S02 4
#S08 2
S08
1.5 Slide connectors S04 and S04 into profile L01B until they securely click into place.
S05
S04
L01B
L01B L01B
S05
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com 8 of 51
1.6A Carefully line up connector S04 with profile L02B and connector S05 with profile L02A.
Slide profile L01B half way into place. Continue sliding until connectors S04 and S05
click securely into profiles.
L03C
L03D
L02A
L01B
S02
S04
L01B
Screw QTY
S05
#S02 4
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
1.7A Slide hex bolt S13 into channels of profiles L05A and L05B as shown.
1.7B Screw hex nut S14 onto bolt. Do not completely tighten.
L05A
S14
L05B
L05A
L05B
S13
#L05A 2 #S13 4
#L05B 1 #S14 4
www.stcny.com 9 of 51
1.8A Remove protective plastic from both sides of panels Y1, Y2, Y3 and Y4. Place side to face
toward the sun facing down. Fit panels Y1 and Y2 into bottom channel of profiles L05A
and L05B.
! Remove protective plastic from EACH side of poly carbonate
L05A panels before installing. Dispose of plastic properly. Install with
side labeled “Face this side towards the sun” FACING DOWN.
L05B
L05A
Y1
Y1
Y1
1.8C Slide panels Y3 and Y4 into V-channels on
profiles L0A, L02B, L03C and L03D. Fit inside
Y2
channels on profiles L05A and L05B.
Y1
Y4 Y3
Y4 L02B
L03C
L05A
L05B L03D
L02A
Y1
L05A
Y2
Y1
#Y1 2 #Y3 1
#Y2 1 #Y4 2
www.stcny.com 10 of 51
1.9 Slide hex nut S14 and hex bolts S13 into U-cutout in both sides of
profiles L03C and L03D. Tighten securely to hold in place.
L05A
L05B
L05A
L03C
L03D
1.10A Slide profiles L02C and L02D into connectors S09, S10 and S12 until they click into place.
L02C
S12
L02C L02D
S09 L02C
L02D L02D
24.5”
(623 mm) S10
S09 24.5”
(623 mm)
S10
IMPORTANT: The holes are not at the midpoint of the profiles. Arrange
profile so the 24.5” portion will be the bottom when standing.
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com 11 of 51
1.10B Slide connectors S09 and S10 half way into profiles L02A and L02B. Continue sliding
together making sure panels Y3 and Y4 fit into V-channels
of profiles L02C and L02D. Connectors click L02C
securely into profiles. L02D
S09
L02B
L02A
S10
L02B
L02A
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
L02C
1.11A Place connectors S11 onto profiles L02C and L03C
and L02D and L03C matching up all holes.
L03C
L03D L02D
S11
S02
S02
S02
S02
Connector QTY
NOTE: ALL VIEWS ARE FROM INSIDE.
#S02 8
#S11 2
www.stcny.com 12 of 51
1.12A Insert long side of cable connector S06 into profile channel L02B with hook facing up. Slide
connector to other side of channel. Use hex key to securely tighten and hold in place.
Y1
L02B
L04F
Y1
L04F
L02A
L01B
1.12B Attach one side of short cable S16 to hook and lace under profile L04F. Attach other
side of cable to another S06 cable connector. With hook facing the center, insert connector into
profile channel L01B and push towards center until profile corners are square and cable is tight.
Use hex key to securely tighten and hold in place.
1.13 Repeat step 1.12 inserting cable connectors S06 into profiles L02A and L01B. Cable rests next to panel
Y1 and behind profile L04F. Slide connector until profile corners are square and cable is tight. Securely
tighten second connector to hold in place.
1 #S06 4 #S16 2
www.stcny.com 13 of 51
Assemble Door
Lay out all the parts for the door in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
! The door is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
L05E
S13
S14
2.2 Remove protective plastic from both sides of panels Y15. Place side to face toward the sun facing
down. Fit panels into channels of profile L05E.
Y15
L05E
Y15
L05E
NOTE: ALL VIEWS ARE FROM INSIDE.
#S13 3
#L05E 1 #Y15 2
#S14 2
www.stcny.com 14 of 51
2.3 Place door profiles L13A, L13B and L13C next to connectors S28 around Y15 panels as
shown. Slide connectors into profiles. Make sure panels and profile L05E fit into
V-channels of each profile. S28 connectors will be secured to profiles in Step 2.4
S28
Y15
S28
S28
Y15
L13C
2.4A Slide hex nuts and bolts into U-cutout in side of profiles
L13B and L13C. Tighten securely to hold in place.
! NOTE: The holes at the top of profile L13B and the bottom
left corner of profile L13A will be secured in Step 2.5.
L13A
L13A L13B
L13B
Y15
L13C
Y15
L13C L13A
L13A
Profile QTY Screw QTY Connector QTY
#L13A 2
#L13B 1 #S02 6 #S28 4
#L13C 1
www.stcny.com 15 of 51
2.5 Place brace L15A onto door lining up the holes on each end with the holes in profiles L13A
and L13B. Slide hex bolt so it fits through hole in brace. Secure brace with two S02
screws and S14 hex nut.
S14
L13A
L13B
L15A
L13C
L13A
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn
brace until all holes line up. Brace will dip slightly when hex bolt is secured.
2.6A Open door handle kit and remove parts. Slide pin S29 through handle S30, washer S31and hole in
profile L13C into washer S31.
L13C S32
S31 S31
L13C
2.6C Hook one side of spring S33 into hole on handle S30. Hook the other
side into pin hole on profile L13C.
NOTE: Connectors packaged as Door Handle Kit.
Connector QTY
#S31 2
Connector QTY
S33
#S29 1 #S32 1
L13C
#S30 1 #S33 1
www.stcny.com 16 of 51
Assemble Front
Lay out all the parts for the front face in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
! The front is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
3.1A Lay out profiles L02A, L02B, L06A and L06B so all holes line up. Slide short side
of connector S01 into channels of profiles L02A, L02B, L06A and L06B. L06A
L06B
IMPORTANT: The holes are not at the midpoint of the profile.
Arrange profile so the 28” portion will be the bottom when standing.
L02A
L06A
S01
S01 28”
(711 mm) 28”
(711 mm)
L02B L06B
3.1B Line up lower hole on connector S01 with hole in each profile and secure with S02 screws.
L02A
L02B
www.stcny.com 17 of 51
3.2A Slide profiles L06C into L06A and L06B using connectors S28. S28 connectors do not snap
into place.
L06C 3.2B Place connectors S17L and S17R on corners
S28 matching up bottom two holes with holes
S28 S28 in profiles L06A, L06B and L06C as shown.
S17L L06C
S17L
L06B S17R
L06A L06B S17R
L06B
L06A
L06A
S02
S02
3.3A Attach profiles L02B and L06B to profile L04A. Slide long sides of connectors S01 into channels of profile
L04A, lining up last hole in S01 with holes in profile L04A. Attach profiles L06A and L02A to profile L04A.
Slides long side of connectors S01 into channels of profiles L04A, lining up last hole of S01 with holes in L04A.
L02B L06B
L06A
L06B
L04A
L02B L06A
L04A
L02A L02A
L04A
L04A
www.stcny.com 18 of 51
3.4A Slide profiles L02E and L02F into connectors S09, S18 and S10 until they click into place.
S18
L02F
L02E
L02F
S18
S09
Connectors S09, S10 and S18 CLICK into place.
L02F L02E
L02E
26.5”
(676 mm)
S09
26.5”
(676 mm)
S10
S10
IMPORTANT: The holes are not at the midpoint of the profiles. Arrange
profile so the 26.5” portion will be the bottom when standing.
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
3.4B Remove protective plastic from both sides of panel Y8. Place side to face toward the sun facing down.
Fit panel into V-channel on profile L06.
! Remove protective plastic from EACH side of poly carbonate
Y8 panels before installing. Dispose of plastic properly. Install with
side labeled “Face this side towards the sun” FACING DOWN.
L06C
Y8
L06C
#Y8 1
www.stcny.com 19 of 51
3.5A Slide connectors S09 and S10 half way into profiles L02A and L02B. Continue sliding
together making sure panel Y8 fits into V-channels of profiles L02F and L02E.
Connectors click securely into profiles.
L02F
Connectors S09 and S10 CLICK into place. L02E
Y8
S09
S10
S09
L02B
S10
L02A
L02B
L02A
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
3.5B Place connectors S17L and S17R on frame, lining up holes as shown.
L02F
L02E 3.5C Secure with two S02 screws.
S17L
S17R
S02
S02
L06B
L06A
Screw QTY
#S02 2
www.stcny.com 20 of 51
3.6A Remove protective plastic from both sides of panels Y5, Y6 and Y7. Place side to face
toward the sun facing the down. Fit panels Y7 into top channels of L05C.
Y7 Y7
L05C
L05C L05C
NOTE: ALL VIEWS ARE FROM INSIDE.
! Remove protective plastic from EACH side of poly carbonate
panels before installing. Dispose of plastic properly. Install with
side labeled “Face this side towards the sun” FACING DOWN.
Y8
L02B L02A
Y8
Y7
Y7 Y7
L05C L05C
Y8
3.6C Slide Y5 and Y6 panels into V-channels
on profiles L02A, L02B, L06A and L06B.
Fit inside channels on L05C profiles.
Y7 Y7
L05C L05C
L06B L06A
L02A
L02B
Y6
Y5
www.stcny.com 21 of 51
3.7A Slide short side of connectors S01 into channel of profile L01A. Line up last hole on
connector with holes on profile.
S01
L01A
3.7B Secure with S02 screws.
S02
S01
S02
3.7C Slide connectors S04 and S05 into profile L01A until they click into place.
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
S04 profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
S04
S05
S05
Connectors S04 and S05 CLICK into place.
#S04 1 #S05 1
www.stcny.com 22 of 51
3.8A As you slide bottom profile L01A half way into place, carefully line up S01 connectors
with channels on profiles L06B and L06A and S04 and S05 connectors with profiles
L02B and L02A. Continue sliding, making sure panels Y6 and Y5 fit into V-channels.
Snap connectors S04 and S05 securely into profiles.
L06A
L01A
Y6
Y5
L01A
S04 S05
S01
S01
L01A S05
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
3.8B Secure S01 connector to profiles L06A and L06B with S02 screws.
L06A
NOTE: ALL VIEWS ARE FROM INSIDE.
#S02 2
www.stcny.com 23 of 51
3.9A Insert long side of cable connector S06 at an angle into profile channel L02B with hook
facing up. Slide connector to other side of channel. Use hex key to securely tighten
and hold in place.
NOTE: ALL VIEWS ARE FROM INSIDE.
L06A
L06B
L02A
Y5
Y6
L02B
L01A
3.9B Attach one side of short cable S16 to hook and lace under profile L04A. Attach other side of cable to
another S06 cable connector. With hook facing the center, insert connector into profile channel L01A
and push towards center until profile corners are square and cable is tight.
3.10 Repeat step 3.10 inserting cable connectors S06 into profiles L02A and L01A. Cable rests next to panel
Y5, under profile L04A and over vent. Slide connector until profile corners are square and cable is tight.
Securely tighten second connector to hold in place.
Hex Key QTY Cable Connector QTY Cable QTY
1 #S06 4 #S16 2
www.stcny.com 24 of 51
Assemble Sides
Lay out all the parts for the sides in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
! You are assembling both sides in the following steps. Both sides are identical until step 6.1
4.1A Line up the four profiles L03B so the holes are at the same position. Slide long side of connectors
S20 and S08 into channel of profile, lining up holes as shown. Repeat for all four L03B profiles.
S20
S20
4.1B Secure with three S02 screws.
S02 S02
L03B
L03B
S08
Profile QTY Connector QTY Connector QTY
#S02 4 #S02 8
#L03B 4
#S20 4 #S08 4
S08
4.2A Place L03B onto profiles L07A and L01C. Line up holes as shown.
L07A L03B
L03B
S02
L01C S02
L01C
www.stcny.com 25 of 51
4.3A Place L03B onto profiles L07B and L01C. Line up holes as shown.
L03B
L03B
S02
S02
L01C
L01C
S02
L01C Profile QTY Profile QTY Screw QTY
4.4A Lay out profiles L03A so the holes are at the same position. Slide short side of connectors S01 into
channel of profile until the last hole in S01 lines up with the bottom hole on profile L03A.
L03A L03A
L03A
S02
S02
28”
(715 mm)
www.stcny.com 26 of 51
4.5A Lay out profiles L04D so the holes are at the same position. Slide short side of
connector S01 into channel of profile, lining the last hole in S01 with the hole
on profile L04D. Secure with S02 screw.
S01 4.5B Slide connector S39 into profile S39
L04D until it snaps into place.
Repeat to make two sets.
S39
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
4.6 Slide connector S03 into profile L04B until it clicks into place.
S03
S03 Connector S03 CLICKS into place.
4.7A Attach profiles L04B and L04C to profile L03A by sliding the long sides of connectors S01 into the
channels. The last hole of connector S01 lines up with the holes in the profiles.
4.7B Secure with two S02 screws. Repeat to make two sets.
IMPORTANT: Connector S03 rests
on top of connector S01. S02 screw
L03A secures S03 to profile L04B.
L04B
S01
L04C
S03
L04B
S02 L03A
S02
S01
www.stcny.com 27 of 51
4.8A Connect profile L04D by sliding connector S39 into profile L04B until it clicks securely into place. Slide
connector S01 into channel of L04C.
4.8B Secure with S02 screw. Repeat to
Connectors S39 CLICKS into place.
make two sets.
S39
L03A
L04B
S39
#S02 2
L04D S02
S01
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
4.9 Slide connectors S19 and S03 into profile L03A until they click securely into place.
Repeat to make two sets.
S19
S19
Connectors S03 and S19 CLICK into place.
L03A
S03
www.stcny.com 28 of 51
4.10 Slide sections together as shown. Repeat to make two sets.
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
L07A S19
L07B L07B
S19
L07A
L03A
L01C
S03
L01C
L01C
NOTE: ALL VIEWS ARE FROM INSIDE.
L01C
S03
! NOTE: The two sides are identical. When you connect them to
the back, there will be a right and left side. Stand these up.
www.stcny.com 29 of 51
Prepare Shelves
Place all the parts for the shelves on a level surface.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
5.1A Line up the shelf profiles so the holes are at the same position. Slide long side of connector S37 into
channel of each profile, lining up the last hole on the connector with the hole in the channel.
L14B
L14C
S37
L14D S37
L14A
IMPORTANT: The shelf profiles have rectangular holes in the channel or side of one end.
Slide connector S37 into other side, lining up last hole in connector with hole in the channel.
S37
S02
6.1A Set up one side faAing inside with L07B next to the back. Slide shelf profile
L07B
L14B into connector S03 until it clicks into place. Slide shelf profile
L14D into connector S39 until it clicks into place.
L14B
L14B
L14D
S03 L07A L14D
S03
S39
S39
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
6.1B Carefully slide left side into back, lining up connectors with profiles. Move side so connectors S09 and
S04 are half way into profiles L07B and L01C. Connectors S37 rest on top of profile L04F. Push side in
until connectors click into place.
L04F
S37
S09
L07B
S09
S37
L07B
L04F
S04
L01C
S04
VIEWS FROM INSIDE.
L01C
Screw QTY
Connectors S04 and S09 CLICK into place.
#S02 2
www.stcny.com 31 of 51
6.2A Set up the other side facing inside with profile L07A next to back.
Slide shelf profile L14A into connector S03 until it clicks into L07A
place. Slide shelf profile L14C into connector S39
until it clicks into place.
L14E
L14C
L14C
S03
S03
S39
S39
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
6.2B Carefully slide right side into back, lining connectors up with profiles. Move side so connectors S10
and S05 are half way into profiles L07A and L01C. Connectors S37 rest on top of profile L04F. Push
side in until connectors click into place.
S10
S10
L07A
L07A
L04F
S37
L04F
S37
L14A
Secure connectors S37 to
L14C profile L04F with S02 screws.
S05 S02
L01C S02
L04F
www.stcny.com 32 of 51
Connect Sides to Front
Keep the structure as is, with the back against the wall until you
! finish this step. This will make it easier to keep the angles square.
7.1 Slide shelf profile L14A into connector S03 on the left side until it clicks into place.
Slide shelf profile L14B into connector S03 on the right side until it clicks into place.
S03
L14A
L07A
S03
L07B
L14A
S03
L14B
S03
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com 33 of 51
7.2A Lift front from inside and rest it next
to sides. Line up connector S10 with
profile L07A, connector S09 with
S10
profile L07B and connectors S04
and S05 with profiles L01C. L07A
S09
L14A
L07B
S05 L01C
L14B
S04
L01C
7.2B Carefully pull the front until all connectors are half way inside each profile. Make sure connector
S37 attached to shelf profiles rest on top of profile L04A. Push front into sides until connectors
click into place.
S10
L07A
S37 L07B
S37
L14A
L04A S09
L07B
S37 S05
S04
L14B
S04
L01C
L01C
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com 34 of 51
7.3A Slide shelf profile L14C at a slight angle so one end slides half way into connector S39 and the other side
with connector S37 rests on top of profile L04A. Continue to slide until profile clicks into connector S39.
Connector S39 CLICKS into place.
L14C ! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
S39 profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
7.3B Repeat step 7.3A, sliding shelf profile L14H into S39 connector.
Make sure connector S37 rests on top of profile L04A.
L14D
L04A S39
S37
L14A
L14C S39
L04A
L04A
L14A
L14D
L14C
L14B
Screw QTY
www.stcny.com 35 of 51
Assemble and Connect Gables
Lay out all the parts for the gables in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Please carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including shoes, gloves and goggles.
8.1A Slide connector S22 into channels of profiles L03E. Slide another S22 connector into channels
of profiles L03E and L03F. IMPORTANT: U-shaped cutout is not at midpoint of
S22 profile L03F. Attach longer side (22.5”) to connector S22.
L03E L03E
S22
L03E L03F
L03E
L03F
S02
Profile QTY Connector QTY
#L03E 3 #S02 8
L03F
#L03F 1 #S22 2
8.2A Slide connector S21 into profiles L03H and L03G until it clicks securely into place.
IMPORTANT: U-shaped cutout is not at midpoint of profile L03G. Attach longer side (22.5”)
to connector S21. Make sure coonector S21 is positioned correctly before connecting.
S21
L03G
L03H
L03G
L03H
L03G L03H
L03G
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into S02
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com 36 of 51
8.3 From the inside of the greenhouse, use two people to carefully lower center gable onto frame. Line
up and slide profiles L03G and L03H into connectors S19 until they click securely into place.
S19
S19 S19
L03G
S19 L03G
8.4 From the inside of the greenhouse, use two people to carefully lower front and back gables onto frame.
Line up and slide connectors S20 into channels of profiles L03E and L03F.
L03E
L03E L03E NOTE: U-shaped cutouts
on profile L03F faces front.
S20 S20
L03F
L03F
S20 L03E
S20
S20
L03F
S20
www.stcny.com 37 of 51
8.5 Line up profiles L08A and L02G as shown. Note that L08A has a cutout on one end. The plain
side slides into V-channels of profile L02G. Note the rectangular holes in the channels
of profile L02G are NOT on the side next to the V-channel.
L08A L08A
L08A L08A
L02G
L02G
L02G
8.6A Using a small step ladder inside the greenhouse, carefully slide profiles L08A and L02G into back
connector S12 at a slight angle. Gently push center gable slightly towards the front to slide other end
of profile into connector S21. Make sure both connectors snap securely into place. Note L02G profile
rests on top of connector S22.
IMPORTANT: Make sure profiles L02G with L08B are in correct positions before installing. Arrange profile L02G
so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside.
S12 L02G
L08B
Connectors S12 and
S21
S21 CLICK into place.
S22
8.6B Slide profile L02G at a slight angle into center gable connector S21. Gently push front side slightly
forward to slide other end of profile into connecor S18. Make sure both connectors click securely into
place. Note profile L02G rests on top of connector S22.
IMPORTANT: Arrange profile L02G so rectangular holes in channels face
the LEFT when looking at the front of the greenhouse from the outside.
S21 L02G
S22 S18
Profile QTY
! There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into #L02G 1
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com 38 of 51
8.7A From inside of greenhouse secure S20 connectors
to profiles L03E and L03F with two S02 screws. 8.7B Secure S22 connectors to profiles
L02G with one S02 screw.
L03E
L02G
S20
S22
S02
L03F
S02
Screw QTY
8.8A From inside of greenhouse, line up bracing bar S23 with holes in profiles L03A and L03H. Secure one
S02 screw partially into each end. Then go back and tighten both screws.
S02
S23 S23
L03G
L03A
S02
L03A
L03A
S23
L03A
#S02 4 #S23 2
www.stcny.com 39 of 51
Brace Sides
Place all the parts for bracing the sides on a level surface.
Make sure the pieces are in the correct positions before assembling.
! Please carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including shoes, gloves and goggles.
9.1A From the inside of the greenhouse, insert long side of cable connector
S06 into profile channel L07B with hook facing the front. Slide
connector to other side of channel. Use hex key to
securely tighten and hold in place.
L07B
L07B
L02B L02B
L14A
L03A
9.1B Attach one side of long cable S07 to hook and lace behind profile L14A. Attach other side of cable to
a second S06 cable connector. With hook facing the back, insert connector into profile channel L01C.
9.1C Push towards center until profile corners are square and cable is tight.
L03A
Use hex key to securely tighten and hold in place.
L03A
L01C
IMPORTANT: Make sure all corners
are squared at 90 degrees.
9.2 Repeat step 9.1 inserting cable connectors S06 into profile L07B with hook facing the back and into
profile L01C with hook facing the front. Cable rests behind profile L14A. Slide connector until profile
corners are square and cable is tight. Securely tighten second connector to hold in place.
L02B
L07B
L03A
L03A
L02B
L01C
L14A
www.stcny.com 40 of 51
9.3A From the inside of the greenhouse, insert long side of cable connector S06 into channel
of profile L07A with hook facing the back. Slide connector to other side
of channel. Use hex key to securely tighten and hold in place.
L07A
L07A
L02A
L02A
L14B
L03A
L01C
9.3B Attach one side of long cable S07 to hook and lace behind profile L14B. Attach other side of cable to
a second S06 cable connector. With hook facing the front, insert connector into channel of profile L01C.
L03A 9.3C Push towards center until profile corners are square and cable
is tight. Use hex key to securely tighten and hold in place.
L03A
L01C
IMPORTANT: Make sure all corners
are squared at 90 degrees.
VIEWS FROM INSIDE. L01C
9.4 Repeat step 9.3 inserting cable connectors S06 into profile L01C with hook facing the front and into
profile L07A with hook facing back. Cable rests behind profile L14A. Slide connector until profile
corners are square and cable is tight. Use hex key to securely tighten second connector to hold in place.
L07A L02A
L03A L07A
L01C
VIEWS FROM INSIDE.
L02A
L14B
9.5 Repeat step 9.1 through 9.4 on the other
side of the greenhouse.
L01C
L07B
L07A
IMPORTANT: Make sure all corners
L02B are squared at 90 degrees.
L14B
L14A L02A
www.stcny.com 41 of 51
Assemble and Install Roof Vent
Lay out all the parts for the roof vent in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
! The roof vent is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
10.1 Remove protective plastic from both sides of panel Y14. Place side to face toward the sun facing up.
Fit panel into channels of profiles L10A and L11A.
L11A
! Remove protective plastic from EACH side of poly carbonate
panels before installing. Dispose of plastic properly. Install with
side labeled “Face this side towards the sun” FACING UP.
Y14
L10A
L10A
NOTE: ALL VIEWS ARE FROM INSIDE.
10.2A Fit panel and profiles L10A and L11A into channels of profiles L12A. Make sure holes in ends
of profiles line up.
L11A
L12A
10.2B Secure with four S26 screws.
S26
S26
S26
Y14
L12A
L10A
L11A L12A L10A
L12A
S26 S26
L12A
10.3 Attach handle S25 to profile L10A L12A
with two S24 screws. S25 L10A
S26
S25
Y14 S24
S24
S24
L10A S24
L10A
IMPORTANT: hollow side of handle S25 faces down when attached.
Profile QTY Handle QTY Screw QTY
#S24 2
#L12A 2 #S25 1
#S26 4
www.stcny.com 42 of 51
10.4A With pins facing up on the inside of the greenhouse, slide one end of profile L05D into
V-channel of profile L03F. Angle it slightly to fit the other end into V-channel of profile L03G.
IMPORTANT: Profile L05D is shipped with four hex nuts and bolts attached.
Loosen hex nuts on each end and slide towards center. Make sure the pins
L03F
face up on inside of the greenhouse when profile L05D is installed.
L03G
L05D
L03F
L05D
L05D
VIEW FROM INSIDE.
Profile QTY
10.5A Stand on a small step ladder inside the greenhouse. Install roof vent by sliding profile L11A
into profile L08A from the back of the greenhouse towards the front.
L11A
Y14
IMPORTANT: The handle of roof vent L08A
L08A
L08A
S24A
Y14 L08A
#S24A 1
www.stcny.com 43 of 51
Install Circular Vent
Lay out all the parts for circular vent in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
11.1A Open the box containing the parts for the circular vent.
From the outside of the greenhouse, line up
vent frame pins with holes in panel Y6,
and slide into place. From the inside of the
greenhouse, slide circular vent under the
cable. Line up pins in vent frame with
holes in vent fan and slide into place.
Y6
11.1C Double check that the corners are squared at 90
degrees and adjust if necessary. See step 3.10 for
detailed instructions.
Y6
1 1 4
www.stcny.com 44 of 51
Install Side and Roof Panels
Lay out all side and roof panels in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
12.1 Remove protective plastic from both sides of panels Y9 and Y10.
Place side to face toward the sun facing out when installing.
Slide panels carefully into V-channels in corner profiles L02A Y9
and L02B and side profiles L03A and L03B. As you Y10
continue sliding the panels make sure they fit
into the V-channels in base profiles L01C. Y10
Y9
Y11
Y12
Y12
Y11
Y11
Y13
Y12
Y11
#Y10 4 #Y12 3
Panel QTY
www.stcny.com 45 of 51
Install Weather Stripping
If you have been building your greenhouse in another place than it’s final
! position, we recommend you move the greenhouse before you begin
these steps. Have at least one person help you carry it.
13 From the outside of the greenhouse, line up the black rubber stripping with the V-channels
of all profiles. Cut to length of each profile as you work, pushing the stripping between the
panel and the empty space in the V-channel of the profile.
IMPORTANT: The black rubber stripping J01is cut to length with scissors. Make sure to
insert stripping as shown, securely into the V-channels of all the profiles, cutting each piece
to the proper length. This will help protect the inside of your greenhouse from the weather.
#J01 63M
www.stcny.com 46 of 51
Install Trim Plates
Lay out the trim plates in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
14.1 Remove the six hex nuts from the hex bolts attached to
each L09A and L09B trim plate BEFORE installing.
L09A
L09B
VIEWS FROM INSIDE.
14.2A Place trim plates L09A and L09B onto profiles L07A and L07B
on outside of greenhouse. Trim plates fit over edges
of side and roof panels and bolts are inserted
into holes on profiles L07A and L07B.
L07A
NOTE: Trim plates cover edges of black
rubber stripping, and roof and side panels.
L09A
L07B
14.2B From inside of greenhouse, place
hex nuts onto hex bolts in trim plates
L09B
L09A and L09B and tighten securely.
IMPORTANT: The holes in profile L07A and L07B and the bolts in
trim plates L09A and L09B are in different positions. Fit trim plate
L09A into profile L07A. Fit trim plate L09B into profile L07B.
14.3 Repeat Step 14.2A and 14.2B on other side of greenhouse. Note the positions of profiles
L07A and L07B are reversed. Make sure to attach trim plate L09A to profile L07A in the front
and trim plate L09B to profile L07B in the back.
L07B
L09B
L07A
Trim Plate QTY
#L09A 2
L09A
#L09B 2
www.stcny.com 47 of 51
14.4A In the front of the greenhouse, slide plastic trim plates J02L, J02R, and
J03 into connectors S09, S10 and S18 until they snap into place. On
top of the greenhouse, snap trim plate J04 onto connector S21.
The trim plates will cover the edges of the black rubber
stripping installed in step 13. S12
J04
S21
S18
J03
S10
S10
J02L
S09
J02R
14.4B In the back of the greenhouse, slide plastic trim plates J02L, J02R, and J03 into connectors
S09, S10 and S12 until they snap into place.
S10
S12
S09
J03 J02R
J02L
IMPORTANT: The plastic trim plates J02L, J02R, J03 and J04 fit into connectors one way. Make sure
the connectors are snapped securely into place as they will protect the connectors from the weather.
Trim Plate QTY Trim Plate QTY Trim Plate QTY Trim Plate QTY
www.stcny.com 48 of 51
Weather Strip and Hang Door
The door has been assembled in Step 2. When hung, the bracing bar is on the
! inside of the greenhouse. We recommend using two people to hang the door.
NOTE: You will use the remainder of the roll of 63 meters of black rubber
weather stripping. You will need a pair of scissors for this step.
15.1 Follow instructions for Step 13 to install rubber weather stripping to outside of the door.
IMPORTANT: The rubber stripping J01is cut to length with scissors. Make sure to insert
stripping as shown, securely into the V-channels of all the profiles, cutting each piece
to the proper length. This will help protect the inside of your greenhouse from the weather.
#J01 63M
15.2 From the outside of the greenhouse, carefully line up hinges on door into hinges on door
frame and lower into place. There is no need to secure it.
www.stcny.com 49 of 51
Secure to Ground
IMPORTANT: The greenhouse must be firmly secured to the ground. Make
! sure the foundation is FLAT and LEVEL. Make sure the greenhouse is square.
The two diagonal measurements inside the greenhouse should be identical.
16 From the inside of the greenhouse, insert the S34 anchor clips into channels of side profile
L01C at each corner and center of both sides. Place the S35 pegs through the holes and into
the ground to establish proper placement. Remove the pegs, dig holes 12”/30cm deep and
fill with concrete. When the concrete is partially dry, use a hammer to drive the pegs all the
way into the concrete and let dry completely for twenty four hours.
NOTE: Insert S34 anchor clips into the channel of side profiles
L01C at a slight angle and slide under the lip of the channel.
L01C
S35
L01C
S34
#S34 6 #S35 6
www.stcny.com 50 of 51
Install Trays and Bin Holder
Lay out all the parts for the trays and bin holder in a staging area.
Make sure the pieces are in the correct positions before assembling.
! Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
17.1 From the inside of the geenhouse, place the trays on the
shelves. The trays interlock together and rest on
the lip on the sides of the shelve profiles. Ten
trays fit on each side of the greenhouse.
S37
S02
IMPORTANT: S36 are self tapping screws used to screw into areas that do not have predrilled holes. When you
have decided on the placement of your bin, use these screws to attach the L04E profiles into the shelf profiles.
L04E
S36 L04E
#S02 4
#L04E 2 #S37 4
#S36 4
www.stcny.com 51 of 51