Manpower productivity rates

ELECTRICAL
ACTIVITY GENERATORS A. 415/220 VOLTS: UPTO 50 KVA 50 KVA TO 150 KVA 200 KVA TO 500 KVA B. 11 KV GENERATORS 200 KVA TO 500 KVA 500 KVA TO 1000 KVA LT. SWITCHGEARS MDB INCOMING UPTO 1000 Amps INCOMING ABOVE 1000 Amps MCC Panels SUB DISTRIBUTION BOARD FINAL DISTRIBUTION BOARD CABLING, WIRING & TERMINATION PULLING OF WIRES IN CONDUITS PULLING OF WIRES IN TRUNKING CABLE TRAYS AND LADDERS INCLUDING ACCESSORIES UPTO 100 mm. WIDE UPTO 300 mm. WIDE TERMINATION FOR 3 AND 4 CORE CABLES TERMINATION FOR SINGLE CORE CABLES FIXING OF PVC CONDUITS IN SLAB FIXING OF PVC CONDUITS IN WALLS LAYING OF PVC CONDUITS / PIPES IN GROUND FIXING OF PVC UNDERFLOOR TRUNKING FIXING OF METAL UNDERFLOOR TRUNKING LIGHTING FIXTURES FLOURESCENT LIGHT FIXTURE RECESSED FLOURESCENT LIGHT FIXTURE SURFACE MOUNTED SWITCHES & SOCKETS 1&2 WAY SWITCHES UPTO 4 GANGS 1&2 WAY SWITCHES UPTO 8 GANGS TELEPHONE & TV OUTLETS PUSH BUTTON FOR CALL BELL FIRE ALARM SYSTEM FIXING OF DETECTORS FIXING OF BELL & CALL POINTS MAIN PANEL UPTO 10 ZONES UOM ManDays Per Unit (planning) ManDays Per Unit (Estimation) ManDays Per Unit (operations)

NOS NOS NOS NOS NOS

4.80 7.20 12.00 12.00 20.00

10 15 20 20 30

NOS NOS NOS NOS NOS POINT POINT MTR MTR NOS NOS POINT POINT POINT MTR MTR NOS NOS NOS NOS NOS NOS NOS NOS NOS

12.80 16.00 4.80 4.80 3.20 0.16 0.11 0.06 0.11 0.32 0.32 0.20 0.30 0.01 0.05 0.08 0.16 0.11 0.05 0.07 0.05 0.08 0.08 0.10 3.20

2/Cubicle 2/Cubicle 2/Cubicle 2 1 0.15 0.15 0.031 0.63 Will Vary Depending on Size of Cable 0.1 0.1 0.1 Will Vary Depending on Size of Trunking

0.208375 0.208375 0.063 0.063 0.063 0.063 0.063 0.063 1/Loops