1st attempt 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. c2.

0 is global delivery- true pareto- 80 to 20 proj components->proj mgmt, delivery mgmt,performance mgmt,knowledge mgmt c2 -> proj setup, proces setup, proj planning, proj tracking,metrics reporting completed product in operative environment->production roll out text cases ->analysis and design six sigma is->statistical measure 2 persons for 1 month should use iterative ->false 8 persons in 12 month->large proj matrix is sys assigns priority according to priority matrix->true

2nd attempt 1.) Which is the not the element of ISO ? a)mgmt responsibility b)resource mgmt c) quality mgmt sys d)measure,analysis, nd improvement e)product realization f)support 2.) Roles and responsibilities is part of which stage ? a)project startup b)proj closure c)proj prosposal d)proj execution nd control 3.) Cognizants processes ? a)cognizant 2.0 b)one cognizant c)qmart d)cognizant online 4.) One of more measure is metric->true 5.) One of more metrix is measure->false 6.) Author role in review? I)specify review objective II)identify lead review, where required III)organize meeting with reviewers where required a)II only b)III only c)I and III oly d) I, II and III(I think so) 7.) What we consider in % defect leakage calculation ? a) leak in same b) 8.) Which is the start up document for a new project ? 9.) At what frequency the benchmarks are revised ? a) Monthly b) Daily c) Half-yearly d) Yearly e) Hourly 10.) What constitutes output/work products that mark completion of a phase ? a) Exit criteria b) Entry criteria c) Task d) Verification(think so) 11.) What would happen if a developer provided read/write access during tester read/write access ?

12.) Which is a not a type of audit? a)process audit b)project audit c)workproduct audit d)facilation audit (not sure) e)delievery audit 13.) What is the first phase of a project in Cognizant? 14.) What is severity rating for CWorldwebsite ? a)c1:highly critical b)c2:critical c)c3:protected d)c4:general 15.) What are the 3 levels of benchmark ? a)lower specification limit, uper specification limit, goal b) lower boundary,goal,upper boundary 16.) Six sigma focuses on ? Ans: Reduction defects and variation 17.) Which phase does not belong to software life cycle/proj ? a) review b)analysis c)design d)code/cut 18.) Tool from where initial information regarding project details flow into C20? a)none b)process set up c) peoplesoft application(not sure) d)project information screen in c2 19.) True w.r.t with the term Defect ? To be informed to the project leader and make him correct the defect. To be informed to the developer and correct it informally. To be documented and revised when it is occurred 20.) Output of the review process will be ? Bug fix Ans:Defect Enhancement Software (one more option) 21)Estabilishing a process to produce a product is a)quality assurance b)quality control c)process definition(I think so) d)process tailoring 22)audits and feedbacks-> ans:Qsmart 23) various widgets under c2o home page? Ans:project health, work list, defects, issues, risk 24)cognizant project 1st stage->ans: project definition 25) requirement added in each phase-> ans: spiral

26) each starts at design phase-> ans: spiral 27) startup document for a new project a)requirement document b)analysis 28) umberalla activities?(check box) a. b. c. d. e. risk utilities load factor spm formal technical review SQA

29) design translated into machine readable language? a)code b)requirement c)design d)analysis 30) defects classification are under which two category?(checkbox)(ans: a b) not sure a)defect severity b)defect priority c)defect id d)none 31) key features in cognizant process? a. b. c. d. all of the above none of the above thin framework automatic process implementation method

32) Which is not phase of project? a) Implmntn b) Coding

c) Testing d) estimation 33) Inspection is a review activity? a)lead by moderator b)very formal in nature c) use checklist d)all 34) Internal Quality Audits? a. b. c. d. C2 Yss Qsmart Riskportal

35)Incremental model of software devpt? a. b. c. d. Address changing require Waterfall overlapping Multiple iteration(think so) Clearly defined spiral

36) Phases of maintenance project? a)knowledge transition, shadow support,steady state-enhancement,production support,bug fix 37) A work b has same task..? a) b) c) d) Version Access control Status accounting Branding and merging

38) Quality means meeting the requirementswhose view point? 39) 6sigma? ANS:Reducing variability and defects
40) Features of QMS in cognizant?

a. Business aligned metrics model b. Customer centric process model c. Automated process improvement methodology+more options

41) What is a defect? a) b) c) d) A flaw in a s/m or s/m component That happened outside your control None All