MPL - 2 x 135MW COAL BASED THERMAL POWER PLANT CONTROL & INSTRUMENTATION COMMENTS ON M/s.BANACO TECHNOLOGIES PVT.

LTD (BTPL) OFFER FOR CHLORINATION PLANT.

GAS CHLORINATION SYSTEM, LEAK ABSORPTION SYSTEM & CHEMICAL DOSING SYSTEM:
Sl. No Specification Reference (Sec/Cl.no) Bid document/ Offer Reference (Sec/Cl.no) MADHUCON / DASTURCO Comments BTPLs Reply

Section-III

General

BTPL to submit clause wise confirmation for Section-III of Technical specification No. MPL32-WTS-0005. BTPL to submit the P & I diagram along with the clarification statement (or) revised offer. BTPL to submit the technical details of PLC based control panel for Gas chlorination system & Leak absorption system. BTPL to include the supply & engineering of the following instruments in their scope. One (1) no. Residual chlorine online monitoring unit with 2NO+2 NC potential free contacts for continuous monitoring of chlorine leak in the chlorination system. Variable area flow indicator shall be provided at discharge line of all dosing pumps.

2 3

Section-III Section-III, Cl.no.3.2 Section-III, Cl.no.4.3

General Schedule-II Page.No-3 of 3, Sl.No.22 Schedule-I Page.No-6 of 7, Sl.No.76

Section-III, Cl.no.4.3

---

Instrument erection hardware such as impulse pipes, isolation valves, elbows, unions, fittings

Page 1 of 3

MPL - 2 x 135MW COAL BASED THERMAL POWER PLANT CONTROL & INSTRUMENTATION COMMENTS ON M/s.BANACO TECHNOLOGIES PVT. LTD (BTPL) OFFER FOR CHLORINATION PLANT.

and connectors etc.., shall Tenderers scope supply. Confirm compliance. 6 Section-III, Cl.no.4.3 ---

be

included

in

Cabling for hardwired signal exchange between gas chlorination control panel and Remote IO cabinet of DCS shall also be included in Tenderers scope. Confirm compliance.

Section-III, Cl.no.5.0 Annexure-2

---

BTPL to note that the remote I/O cabinet of the Plant DCS will be located at the Pump house control room. The make of Instruments, Cables and associated instrumentation items shall be as per Annexure-2, of technical speciation no. MPL-32-WTS-005. Confirm compliance

---

General

---

BTPL to furnish the following documents along with the technical offer. Type, range & all other technical details of the offered instruments. Data sheet for Local control panel, Chlorine Leak detector & Residual chlorine online monitoring unit.

Page 2 of 3

MPL - 2 x 135MW COAL BASED THERMAL POWER PLANT CONTROL & INSTRUMENTATION COMMENTS ON M/s.BANACO TECHNOLOGIES PVT. LTD (BTPL) OFFER FOR CHLORINATION PLANT.

10 Leak absorption system. Schedule-I Page.No-5 of 7, Sl.No.54

List of preferred makes of Instruments.

BTPL to indicate motorised dampers at the suction & delivery side of the Blower

Page 3 of 3