Академический Документы
Профессиональный Документы
Культура Документы
A
E-mail: nagaraman@gmail.com Mobile: 91-9786359734 91-9442477415
Standards Known: ASME Sec V, VIII, XI,IX ASME B 31.3,B31.4 API 1104 AWS D 1.1 Saudi Aramco Specifications-SAES- W010,W011,W012 : 7 years
Experience in Quality Assurance & Control, Welding, Inspection and expediting. Field of work Oil and Gas, Power plant, Iron and Steel, Refinery and Projects. Codes and Standards handled ASME Sec.II,V,VIII, IX, B 31.3, B 31.4, 31.8,16.5&D1.1, BS (BS 5500, EN 287, and EN 288), API 1104, etc. and various ANSI Standards, AWS, Standards and Aramco Standards.
May 2009 to May 2012 NASSER .S AL-HAJRI CORPORATION, Saudi Arabia as QC Inspector Welding. Familiar with various materials SS, DSS, CS, Low Alloy Steels & Inconel, Monal Saudi Aramco Specifications-SAES- W010,W011,W012 Projects Involved NATIONAL CHEVRON PHILLIPS (ETHYLENE CRANKING PROJECT) YANBU EXPORT REFINERY PROJECT (DELAYED COKER REFINING PROJECT) Responsibilities: To ensure the company procedure documents as per the ASME standard and section. To calibrate the portable oven and electrode baking oven. Quality procedure followed based on the ITP guidelines. Resume of Welding Inspector (AG) Venkatraman.A
VENKATRAMAN.A
E-mail: nagaraman@gmail.com Mobile: 91-9786359734 91-9442477415
Identifying the root causes of the welding related problems and taking the corrective and preventive actions. Examination of all NDTs (DPT, RT, UT, MPI). Qualifying the welders as per the PDO approved WPSs. Witnessing of welding activities during the construction and fabrication of the project. Ensure that consumable handling procedure is followed. Verify the Nitrogen content & PRE value for Base material with respective test certificate for DSS materials and consumables Finally prepare AG Piping Test Packages for Hydro/Pneumatic test and carryout the Inspection of pressure test. Maintaining the records of calibration, inspection and testing equipment as per the quality system procedures laid down.
July 2007 to April 2009 ATOMIC TECHNOLOGIES Pvt.Ltd (Singapore) as QC Inspector Welding Projects involved 1. Ex-xon Chemical 2. Singapore Refinery Company 3. Shell Bukom Refinery Project Roles & Responsibilities Involved in Quality progress for fabrication of structural steel and piping as per drawings & project Specifications and procedures. Conduct fit up inspection as per drawings on work shop and on site Conduct dimensional test at site level and elevation mention in revision drawing. Resume of Welding Inspector (AG) Venkatraman.A
VENKATRAMAN.A
E-mail: nagaraman@gmail.com Mobile: 91-9786359734 91-9442477415
Roles & Responsibilities Reviewed electrodes and filler metals chemical composition upon supplier as per test certificate. Ensured electrode baking, storage and issuance is in accordance with quality control procedure (QCP) Welder qualification record and shall conform to approve welding procedure specification. Ensured all welders have their job clearance card prior to start welding as per project requirement. Prepared visual inspection reports and maintain records as per client requirement. Performed continuous in-process welding surveillance in both fabrication and erection. Issued Surveillance and Non Conformance Reports for Discrepancies observed. Requested Non- Destructive Test requirements on weld joints from the daily production outputs. Witnessed NDT execution, Verified all the requested joints if corresponding with weld map against the actual joint on the pipe. Keep records of non-destructive testing results. Reviewed rejected radiographic films prior to repair and coordinate with the welders for the exact defects location as well as the extent of repair to be done. Raised request for inspection (RFIs) to project third party inspection division as per approved Inspection and Test Plan (ITP). For the release of process hold points. Carried outline walk through for the completeness of installed piping system and issued punch list for the discrepancy found. Controlled QA/QC issued for construction drawings and maintained on latest revisions. Prepared weld maps, As-builds and weld history. Attending weekly project quality meetings and fulfilling the Clients requirement
PERSONAL Details
FATHERS NAME DATE OF BIRTH MARITAL STATUS : : : Mr. Aumugam 17-09-1985 Single
VENKATRAMAN.A
E-mail: nagaraman@gmail.com Mobile: 91-9786359734 91-9442477415
Date: Place:
(A.Venkatraman)