Вы находитесь на странице: 1из 2

Call off

Description

Date ordered

Date Requested

Delivery change
request

Scheduled
Delivery Date

41

B2 Slab E - G / 1 - 3

12/05/07

17/05/07

18/05/07

44

PC 06, 07, Car lift

15/05/07

23/05/07

23/05/07

47

B2 Slab A - C / 4 - 8

21/05/07

23/05/07

25/05/07

48

B2 Slab G - L / 1 - 4

22/05/07

30/05/07

30/05/07

54

Core 1 B2 - GVL

31/05/07

05/06/07

04/06/07

52

Perimeter Area 4

30/05/07

06/06/07

06/06/07

53

Area 4 Chairs

31/05/07

08/06/07

06/06/07

58

Core 1 G - 2

05/06/07

09/06/07

09/06/07

50

Bottom Mat Area 4

30/05/07

07/06/07

59

Core 1 2 - 4

05/06/07

12/06/07

12/06/07

66

Pump Chamber

06/06/07

12/06/07

12/06/07

67

Shear links Core 1

08/06/07

11/06/07

12/06/07

60

Core 1 4 - 6

05/06/07

14/06/07

13/06/07

13/06/07

51

Top Mat Area 4

30/05/07

08/06/07

12/06/07

14/06/07

61

Core 1 6 - 8

06/06/07

19/06/07

15/06/07

15/06/07

62

Core 1 8 - 10

06/06/07

22/06/07

18/06/07

18/06/07

68

B2 Slab: Pour 4

08/08/07

19/06/07

63

Core 1 10 - 12

06/06/07

25/06/07

69

North Retaining wall GL 5 - 8

08/06/07

70

Stock

72

11/06/07

Ton

11/06/07

19/06/07

23.547

20/06/07

9.441

19/06/07

20/06/07

4.405

11/06/07

18/06/07

20/06/07

3.317

PC 19, 35, 39

15/06/07

20/06/07

20/06/07

1.723

71

Various Pile caps

14/06/07

21/06/07

21/06/07

8.974

64

Core 1 12 - 14

06/06/07

29/06/07

27/06/07

25/06/07

11.403

79

Core 2 First Lift

19/06/07

22/06/07

25/06/07

25/06/07

1.821

73

B2 Slab: Pour 3

15/06/07

25/06/07

26/07/06

26/06/07

10.499

65

Core 1 14 - 16

06/06/07

02/07/07

29/06/07

29/06/07

10.756

77

Core 2 B2 - GF

18/06/07

29/06/07

29/06/07

29/06/07

15.547

74

B2 Slab: Pour 5

18/06/07

27/06/07

02/07/07

02/07/07

10.480

75

B2 Slab: Pour 6

18/06/07

29/06/07

02/07/07

02/07/07

14.714

78

Core 1 16 - Roof

18/06/07

28/06/07

03/07/07

03/07/07

17.850

84

PC 14

27/06/07

03/06/07

03/07/07

1.018

83

West wall F - L / South wall 1 - 5

26/06/07

28/06/07

05/07/07

8.712

85

Missing BM for B2 slab + crane tie


steel

28/06/07

04/07/07

05/07/07

4.771

82

Core 2 GF - 2

25/06/07

06/06/07

09/07/07

15.766

86

Mesh for temporary gantry

04/07/07

09/07/07

10/07/07

0.565

88

Core 2 2 - 4

05/07/07

13/07/07

12/07/07

18.409

87

Water tank walls

05/07/07

13/07/07

13/07/07

13.858

93

Shear links Core 2 + L - Bars

11/07/07

13/07/07

13/07/07

1.019

94

Dowels

11/07/07

13/07/07

13/07/07

1.001

90

Ret Wall North 10 - 18 South 5 10

09/07/07

17/07/07

17/07/07

13.526

Page 1 of 2

20/06/07

04/07/07

Call off

Description

Date ordered

Date Requested

Delivery change
request

Scheduled
Delivery Date

Ton

80

Area 4 Low level Bottom Mat

20/06/07

03/07/07

19/07/07

23/07/07

14.590

81

Area 4 Low level Top Mat

20/06/07

05/07/07

19/07/07

24/07/07

20.879

89

Core 2 4 - 6

06/07/07

16/07/07

20/07/07

24/07/07

18.409

95

1.5m straights for Core 2

18/07/07

23/07/07

24/07/07

1.184

76

B2 Slab: Pour 7

18/06/07

03/07/07

26/07/07

22.324

102

Core 1 Roof slab

20/07/07

25/07/07

26/07/07

3.500

91

Core 2 6 - 8

09/07/07

18/07/07

24/07/07

27/07/07

18.409

92

Ret Wall East A - F

09/07/07

19/07/07

07/08/07

03/08/07

7.277

96

Core 2 8 - 9

19/07/07

02/08/07

27/07/07

02/08/07

9.393

97

Core 2 9-10

19/07/07

02/08/07

27/07/07

02/08/07

9.217

98

Core 2 10 - 11

19/07/07

TBC

06/08/07

06/08/07

9.217

99

Core 2 11 - 12

19/07/07

TBC

06/08/07

06/08/07

9.217

100

Core 2 12 - 13

19/07/07

TBC

08/08/07

9.217

101

Core 2 13 - 14

19/07/07

TBC

08/08/07

9.217

103

Ret wall South 10 - 18 East F - L

24/07/07

TBC

14/08/07

06/08/07

10.239

104

Capping Beam

24/07/07

TBC

27/07/07

06/08/07

0.523

105

1.5m straights for Core 2

27/07/07

06/08/07

30/07/07

06/08/07

1.184

106

Pier reinforcement

27/07/07

09/08/07

14/08/07

17/08/07

2.154

107

Core 2 14-15

06/08/07

13/08/07

15/08/07

108

Core 2 15-16

06/08/07

13/08/07

15/08/07

109

Water tank splice bars

07/08/07

13/08/07

15/08/07

110

Core 2 16-roof

07/08/07

15/08/07

16/08/07

111

Core 2 16-roof

07/08/07

15/08/07

16/08/07

112

Temp. columns core 2

08/08/07

15/08/07

16/08/07

113

East wall extra re-bar

08/0807

14/08/07

17/08/07

114

Grid 1 & 18 capping beam

13/08/07

16/08/07

17/08/07

115

B1 1st Pour

16/08/07

22/08/07

29/08/07
29/08/07

116

CORE 1 B1

17/08/07

22/08/07

117

CONTIG PILES

23/08/07

28/08/07

Page 2 of 2

23/07/07

Вам также может понравиться