Академический Документы
Профессиональный Документы
Культура Документы
2010
12
SINO-GLOBAL ENERGY
27
43%~45%
102.99MW
1)
2008
118
[1]
Gg
2 g
u g g=
90
Tg
pB= 1
2
Tg
V=15m/s)kg/
0.45Gg =V
(1)
kg/m3[1]
= 29 273 = 353.44
22.4
Tg
Tg
400)K
1)
90
(2)
[2]
52Pa
[1]
2.2
29
90
(ms)g
140
90
80%
90
2
2.1
471012)
102.99MW
43%~45% 4
92.8%
86.81%
52Pa
10a
90
1996
E-mailxiongwei22522@sina.com
SINO-GLOBAL ENERGY
28
3a
26Pa
26Pa
30Pa
2005
90
)52Pa
110
1)
8400h
/a
86.81
92
92.8
260
884.7
720
4424t/a
102.083MW
526.6kg/h
320
118
140
2008 8
255
190
/t
6.1148MW
41800kJ/kg
2000
10a
5.99%
(396
140
2008
3.1
28.7MPa)
86.81%
160
396.2
255
500
92%
2008
1200
[2]
15
3.2
2010
[1]
[2]
2003189-191522-530.
) [ M ] .
[J].
199920(2)45-4654.
29
[Abstract]
Sinopec Luoyang Companys xylene plant has four heating furnaces.These four unitswith a de
signed heat demand of 102.99MWare the main energy-consuming deviceswhich accounted for 43%-45% of
the total energy consumption of the xylene plant.Prior to a technical upgradethe plants heat efficiency was
only 86.81% the local pressure drop in the flue was too largeand the heating furnaces could not run at
low load under natural ventilation conditions.In 2008the company carried out a technical upgrade: to resolve
the problems in the fluetechnicians took out two 90 bendsoptimized the layout of the hot flue to make
gas flow more smoothand reduced the local resistance in the flue by up to 52Pathe air preheater was
changed to turbolator plus glass -lining pipe heavy -duty air preheater and glass -lining surface was used at
the end of the flue
(due to its smooth surfacedust deposits reduced significantly).The upgraded flue has
strong anti-corrosion capability and the flue gas temperature could be reduced and maintained at 140 for
a long period of time with the lowest temperature reaching 118.The xylene units heat efficiency was en
hanced dramatically.This upgrade overcame many disadvantages of heat-pipe air preheaters such as short life
dew point corrosion and fast aging and significantly extended the service life of preheaters (to more than 10
years).After the above upgradethe heat efficiency of the plant rose to 92.8% and the heaters can now oper
ate at low load under natural ventilation conditions.The effects of these energy saving measures are consider
able.
201011205~6
44%200(274) 1050%200937%
25%200920% 9%
11% 4%5% 2009
7%9%
30 15
310
20095.5610
( )
()
SINO-GLOBAL ENERGY
2010,15(z1)
(4)
1. 2003
2. 2003
3.; 1999(02)
4.. 1999(2)
(10)
1. . []-2005,21(7)
2. ....CHE Jun-tie.CAI Xiao-jun.WANG Li.WANG Jian-jun []2001,23(1)
3. .ZHANG Xiu-feng []-2005(6)
4. .. []-2002,23(1)
5. . []-2004
6. ..Zhong Hua.Jin Wanjin []-2007,37(12)
7. .Wu Mingbo []-2010,31(2)
8. . []-2003,27(4)
9. .CHEN Lvyun 95N[]-2010(4)
10. ....Du Bohua.Liu Jianjun.Jiang Zhijun.Cao Huimin
[]-2010,38(1)
http://d.g.wanfangdata.com.cn/Periodical_zwny2010z1008.aspx