NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
DRAWING ID#
A-002 A-200 A-201 A-202 A-203 A-204 A-205 A-206 A-207 A-208 A-209 A-210 A-211 A-212 A-213 A-214 A-215 A-216 A-217 A-218 A-219 Scope of work (drawing list) System routes and penetration to buildings Ground floor plan Yard and lower floor plan Roof plan Sections A-A, B-B, C-C Sections D-D, E-E, F-F Elevations Stairs plans and section Stairs elevations and details Metal schedule ML metal details ML metal details Frame ML-1 - welding Cables channels details 1 Cables channels details 2 M-18 item details M-18 item details Metal details - M-4, M-6, M-15
DRAWING TITLE
File name
A-002-A A-200-A A-201-A A-202-A A-203-A A-204-A A-205-A A-206-A A-207-A A-208-A A-209-A A-210-A A-211-A A-212-A A-213-A A-214-A A-215-A A-216-A A-217-A A-218-A A-219-A
Date Created/Revised 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013
AIR CONDITIONING
NO. 1 DRAWING ID# AC-200 DRAWING TITLE Ground floor and roof plans, section D-D, details File name 2474-22-13103 Date Created/Revised 15/2/2013
SITE DEVELOPMENT
NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 DRAWING ID# R-201A R-201B R-202A R-202B R-203 R-204A R-204B R-205 R-206 R-207 R-208A-UT R-208B-UT R-209 R-210 R-211 R-212 R-213 R-214 R-215 R-216 R-217 R-218 R-219 R-220 R-221 R-222 R-223 R-224 R-225 DRAWING TITLE General Plan General Plan Traffic & Signage Layout Traffic & Signage Layout Details Long Sections Road 2 Long Sections Roads: 3,4,11 Drainage Details Cross Sections Drainage Details 100 Culvert Drainage Details 2100 Culvert Superposition Underground Utilities Superposition Underground Utilities Road No. 11 Cross sections 1100-1105 Road No. 11 Cross sections 1106-1111 Road No. 2 Cross sections 201-208 Road No. 2 Cross sections 209-215 Road No. 2 Cross sections 216-222 Road No. 2 Cross sections 223-229 Road No. 2 Cross sections 230-235
Road No. 3,4 Cross sections 301-303, 400-402
Cross sections Rampart 5800-5808 Cross sections Rampart 6000-6006 Cross sections Rampart 6007-6012 Cross sections Rampart 6013-6020 Cross sections Rampart 6021-6024 Building No. 46 Cross sections 1-3 Building No. 45 Cross sections 4-6 Building No. 44 Cross sections 7-9 Building No. 43 Cross sections 10-12
File name R-201 R-201 R-202 R-202 R-203 R-204 R-204 R-205 R-205 R-205 R-208 R-208 R-209 R-209 R-209 R-209 R-209 R-209 R-209 R-209 R-217 R-217 R-217 R-217 R-217 R-222 R-222 R-222 R-222
Date Created/Revised 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013
SAFETY
NO. 1 DRAWING NO. SA-200 DRAWING TITLE Safety plan File name SA-200 Date Created/Revised 15/2/2013
Date Created/Revised 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013 15/2/2013
PLUMBING
NO. 1 2 3 DRAWING ID# P- 201 P- 202 P- 203 DRAWING TITLE Site plan. water supply & sewage Floor plans and sections Details File name P- 201 P- 202 P- 203 Date Created/Revised 15/2/2013 15/2/2013 15/2/2013
Superposition
NO. 1 2 3 4 DRAWING ID# Z-101 Z-102 Z-103 Z-104 DRAWING TITLE Ground floor plan Yard & lower floor plan Roof plan section a-a b-b c-c File name 101 102 103 104 Date Created/Revised 15/2/2013 15/2/2013 15/2/2013 15/2/2013
AC 1 AC 1
73x73
30.0
AC-200
11
12
10
10
11
12
9.30
2.50
10.10
MAHOD
0 8.5
6
8
6
2.50
10
.40
MAHOD
3
6
1
2 3
R=
17.
50
R= 15 .00
R= 15 .0 0
R= 17
.50
R=
17 .50
MAHOD
R=15.00
R= 1 5 .00
R= 15 .0 0
R=17.5
MAHOD
SITE 13103
BUILDING No.43,45,46
SECTION D-D
DETAIL No. 1
1 5: 1.
5 1. 1: 1: 1. 5
BUILDING No.44
BUILDING
2.50
SECTION C-C
DETAIL No. 1
1. 5: 1 1 5: 1.
SCALE 1:50
DETAIL No. 2
SCALE 1:50
DETAIL No. 2
1. 5: 1
0.00
0.00
1:
5 1. 1:
1.
DETAIL No. 4
DETAIL No. 3
DETAIL No. 4
DETAIL No. 3
CONCRETE PLATE(SEE STRUCTURAL PLAN) 8 cm OF BASE MATERIAL TYPE A 5 cm ASPHALTIC CONCRETE WEARING COURSE CONNECTING ASPHALT COATING 0.25 kg/sq.m
DETAIL No. 3
5 cm ASPHALTIC CONCRETE WEARING COURSE CONNECTING ASPHALT COATING 0.25 kg/sq.m 7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 20 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A
47 cm.
72 cm.
5 cm ASPHALTIC CONCRETE WEARING COURSE CONNECTING ASPHALT COATING 0.25 kg/sq.m 7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 15 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A
7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 15 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A
47 cm.
1: 1. 5
1. 5: 1
BUILDING No.43,45,46 DETAIL No. 1 TYPICAL DETAIL FOR PRECAST CURB STONE
SCALE 1:20
BUILDING
4 cm ASPHALTIC CONCRETE BASE ASPHALT COATING 1kg/sq.m 20 cm OF BASE MATERIAL TYPE A
BUILDING No.44 DETAIL No. 2 TYPICAL DETAIL FOR PRECAST CURB STONE
SCALE 1:20
2.50
0.00
0.00
DETAIL No. 5
4 cm ASPHALTIC CONCRETE BASE ASPHALT COATING 1kg/sq.m 20 cm OF BASE MATERIAL TYPE A
5 cm ASPHALTIC CONCRETE WEARING COURSE CONNECTING ASPHALT COATING 0.25 kg/sq.m 7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 20 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A
72 cm.
SCALE 1:10
5 1. :1
NEW ROAD
EXISTING ROAD
72 cm.
5 cm ASPHALTIC CONCRETE WEARING COURSE CONNECTING ASPHALT COATING 0.25 kg/sq.m 7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 20 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A
5 1. : 1
5 cm ASPHALTIC CONCRETE WEARING COURSE CONNECTING ASPHALT COATING 0.25 kg/sq.m 7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 15 cm OF BASE MATERIAL TYPE A 20 cm OF BASE MATERIAL TYPE A
DISMANTLING UPPER ASPHALT LAYER ASPALT SAWING
47 cm.
30
OF NEW LAYERS
BUILDING
:1
1: 1. 5
2.00
DETAIL No. 3
-0.10
-0.15
STEEL ANCHORS
1.50
7.00
1.50
SHOULDER
ASPHALT ROAD
SHOULDER
16.00
1:2
.5
0.30
TYPICAL BUILDING
1: 1. 5
1:
1.
0.72
1:2
.5
DITCH
47 cm.
7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 15 cm BASE MATERIAL TYPE A 20 cm BASE MATERIAL TYPE A
1. 5
3.40(1.50)
0.50
TYPICAL SECTION
SCALE 1:50 1.50
SHOULDER
1.50
SHOULDER
7.00
ASPHALT ROAD
1: 1. 5 DITCH
1 .5 1 1:
5 : 2.
1:2 .
5 1 :
1. 1:
1.5
section no. 200-217 section no. 225-235 section no. 300-303 section no. 400-402 section no. 1108-1111
DITCH
1.50 7.00 1.50
1:2
0.30 min.
.5
IN FILL
.5 1:2
1: 1.
1:
1.
DITCH
1.50
SHOULDER
7.00
ASPHALT ROAD
1.50
SHOULDER
1: 2
.5
1:2
.5
72 cm.
7 cm ASPHALTIC CONCRETE BINDER COURSE BASE ASPHALT COATING 1kg/sq.m 20 cm BASE MATERIAL TYPE A 20 cm BASE MATERIAL TYPE A 20 cm BASE MATERIAL TYPE A
SHOULDER
ASPHALT ROAD
SHOULDER
DETAIL -A
C,D
C,D
COMPACTED WITH LEAST 80 L/M2 OF WATER WITH A SMOOTH 3 WHELL ROLLER 3 TON STATIC WEIGHT RIPPING UP TO 40 CM. WETTING AND LAY DOWN INTO THE RIPPED SOIL GRAVEL AND COBBLES "BAKALASH" TYPE 50 TO 250 mm SIZE.
DETAIL A
FILLING GAPS WITH LEAN CONCRETE CEMENT OR HYDRATED LINE
SCALE 1:20
ROCK EXCESS TO BE REMOVED
SOILS TYPE A-1B, A-2-4, A-2-5, A-2-6, A-2-7 FOR A-2 TYPE MATERIAL THE COMPACTION SHALL BE PERFORMED AT OPTIMAL WATER CONTENT +4% THE FILL SHALL BE DONE IN NO MORE THEN 20 cm LAYERS COMPACTED WITH AT LEAST 10 PASSESF A HEAVY VIBRATORY ROLLER COMPACTOR(MINIMAL STATIC WEIGHT OF 5 TONS) TO A DRY DENSITY OF 98% OBTAINED FROM "MODIFIED AASHTO"
35
MAHOD
0.20
MAHOD
ROAD3
ROAD 4
ROAD11
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
MAHOD
BUILDING
46
garden stone
garden stone
curbstone
garden stone
MAHOD
BUILDING
45
10 cm plastic cellular syatem wite concrete see detail in drawing no.-R-203 garden stone 10 cm plastic cellular syatem wite concrete see detail in drawing no.-R-203
garden stone
ROAD
curbstone
garden stone 10 cm plastic cellular syatem wite concrete see detail in drawing no.-R-203
MAHOD
BUILDING
44
garden stone
clayey material
garden stone
clayey material
curbstone
garden stone
MAHOD
BUILDING
garden stone
garden stone
curbstone
garden stone
MAHOD
Color Legend :
No.
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 25 26
Discipline
System
Color
Color No.
Line Type
Pattern
Structure
Walls / Columns
Beams
Slabs
Steal
11
21
Architecture
Mechanicals
HVAC Eqpm.
84
GAS Pipes
Electrical
194
23
194
240
244
Copper strip
Plumbing
Storm Drains
200
GAS Pipes
51
Sanitary Drains
hole
hole
T.L.= -1.0
hole hole
B.L. = 0.25
B.L. = 0.25
hole
hole
Color Legend :
No.
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 25 26
Discipline
System
Color
Color No.
Line Type
Pattern
Structure
Walls / Columns
Beams
Slabs
Steal
11
21
Architecture
Mechanicals
HVAC Eqpm.
84
GAS Pipes
Electrical
194
23
194
240
244
Copper strip
Plumbing
Storm Drains
200
GAS Pipes
51
Sanitary Drains
hole
hole
Color Legend :
No.
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 25 26
Discipline
System
Color
Color No.
Line Type
Pattern
Structure
Walls / Columns
Beams
Slabs
Steal
11
21
Architecture
Mechanicals
HVAC Eqpm.
84
GAS Pipes
Electrical
194
23
194
240
244
Copper strip
Plumbing
Storm Drains
200
GAS Pipes
51
Sanitary Drains