Area:
No. 1 2 3 4 5 6
_____________________________
Description Is the work area clean? Are walkways clear of obstacles? Are the work area floors, tables, or desks free from debris, or other foreign items? Are unused items stored in proper storage areas, locations, or containers? Are unused tools stored in their appropriate tool container, or board? Are storage areas and tool containers properly labeled i.e.: item name, quantity, and area location? Are there materials stored in such a fashion that they lean against walls or obstruct aisle ways? Are inventory racks and work in progress tray tiers organized and labeled? Are machines and equipment clean? Are manufacturing floor trashcans located on the outside of factory perimeter aisle ways? Is an work area display board accessible to shop employees? Does the area display board present current information for that work area? Are there any potential safety hazards within the area? Are fire extinguisher storage areas clearly marked and accessible? Are exits clear and easily accessible? Are emergency evacuation routes posted and clear? Yes
Date:
No
_______________________________
Comments
8 9 10
11 12 13 14 15 16
Self-Discipline
Work areas are evident of 5S principles and follow through procedures.
Level 5
Work area operators are continually seeking improvement opportunities to establish positive visual controls.
Level 4
A documented method is evident to ensure unnecessary materials and items are kept from the work place.
A documented method is evident to provide visual indication of location, quantity, and status of materials and items.
Evidence of 5S agreements and safety practices are present in the work environment.
Level 3
Unnecessary materials and items are removed from the work area.
Visual controls have been implemented and followed to control work area organization and cleanliness.
Level 2
Unnecessary materials and items have been separated from the necessary within the work area.
Work areas are cleaned on a regular schedule. Items have been identified for scheduled check.
Level 1
Area
Fabrication Team Office Fabrication Commercial Team Office Final Assembly Electrical Plumbing Spares Team Office Sub-Assembly GAV Team Office GAV Assembly
Sort
Simplify
Standardize
Sweep
Self Discipline
Area
Materials Static Test Technical Publications Engineering IT Human Resources Contracts Product Support Finance Maintenance
Sort
Simplify
Standardize
Sweep
Self Discipline
Distinct categories are scored from 1 5 for each work area, 1 being low. These ratings are detailed on the level of 5S measurement document. Measure each area at least once a month. Return the completed form to the lean manufacturing coordinator no later than two days before the end of the month. Provide specific comments as required.