Вы находитесь на странице: 1из 14

ROURKELA DEVELOPMENT AUTHORITY ( AT A GLANCE)

UDITNAGAR, ROURKELA-769012.

1. INTRODUCTION:The Orissa Town Planning and Improvement Trust Act, 1956 was extended over NAC(Civil Township) Area, Rourkela with effect from 1.1.1961. During 1964 the Special Planning Authority, Rourkela was Constituted where the Zone Officer-cum-Asst. Town Planner functioned as Special Planning Authority which continued till 25.1.1976.The Rourkela Regional Improvement Trust was constituted on 26.1.1976 with its jurisdiction over Master Plan Areas of Rourkela Civil Township, Rajgangpur,Biramitrapur and Sundargarh. The Rourkela Development Authority was constituted with effect from 2.10.1995 with its jurisdiction over Development Areas of Rourkela Civil Township, Rourkela Industrial Complex,Rajgangpur,Biramitrapur and Sundargarh. 2. CONSTITUTION OF AUTHORITY:The Rourkela Development Authority has been constituted vide Notification No.30938/HUD.,dt.15.9.95 effective from 2.10.1995.Now the following members constitute the Authority. 1.Minister of State Urban Development, OrissaChairman 2.Collector, Sundargarh Vice-Chairman 3.Executrive Engineer, P.H. Division, Rourkela. Engineer Member (Part time) 4. Assistant Town Planner Planning Member 5. Secretary, RDA Finance & Accounts Member 6. Deputy Architect, Orissa, Architect Member (Part time) 7. Commissioner-Cum-Secretary,HUD,Orissa Ex-officio Member 8. Chairman, Rourkela Municipality -do9. Chairman, Sundargarh Municipality -do10.Chairman, Rajgangpur Municipality -do11.Chairman, Biramitrapur Municipality -doSince 1.1.08 Sri Sushil Kumar Das, OAS(I),SB is the Secretary and Finance Member of the Authority. M.L.A.,Rourkela and Director,Town Planning, Orissa are special invitees to the Authority meetings. Since constitution of the Authority 11th Authority meting have so far been conducted.

-:2:3.STAFF POSITION:The following are the existing staff position of various branches of the authority:A) ADMINISTRATIVE BRANCH:Sl. Name of the post Category & Scale of pay & No. of Rmarks No. grade pay posts 1. Secretary OAS (I) SB 1 Part time 2. Section Officer,L-II Class-III,Rs.9200-34800/1 In house-1 G.P.-4200/3. Personal Assistant Class-III,Rs.9200-34800/1 In house-1 G.P.-4200/4. Legal Assistant Class-III,Rs.5500-9000/1 In house-1 5. Senior Assistants Class-III,Rs.9200-34800/3 In house-3 G.P.-4200/6. Jr. Assistant Class-III,Rs.5200-20200/2 In house-2 GP-Rs.1900/7. Jr.Typist Class-III,Rs.5200-20200/1 In house-1 GP-Rs.1900/8. Sr.Diarist Class-III,Rs.5200-20200/1 Vacant-1 GP-Rs.2400/9. Collection Assistant Class-III,Rs.5200-20200/1 In House-1 GP-Rs.1900/10. Process Server Class-IV,Rs.4440-7440/1 Vacant-1 GP-Rs.1300/11. Driver (LMV) Class-III, Class-III,Rs.52003 In house-3 20200/- GP-Rs.1900/12. Peon Class-IV,Rs.4440-7440/4 In house-3 GP-Rs.1300/Vacant-1 13. Mali Class-IV,Rs.4440-7440/1 In house-1 GP-Rs.1300/B) PLANNING BRANCH :1. Planning Member Asst. Town Planner of DTP, 1 Full time on Orissa,Class-I deputation Rs.15600-39100/2. Planning Asst. Class-III, Rs.9200-34800/1 In house-1 G.P.-4200/3. Sr.Draughtsman Class-III,Rs.9200-34800/-G.P.- 3 In house-1 4200/Deputation-1 Vacant-1 4. Ferro Printer Class-III,Rs.5200-20200/- GP- 1 Vacant-1 Rs.1900/5. Amin Class-III,Rs.5200-20200/- GP- 2 Vacant-2 Rs.1900/6. Chainman Class-IV,Rs.4440-7440/3 In house-2 GP-Rs.1300/Vacant-1

-:3:C)ENGINEERING BRANCH:1. 2. 3. 4. 5. Engineer Member Asst.Engineer Jr.Engineer Work Sarkar Surveyor Senior Class-I Class-II Class-III ,Rs.9200-34800/G.P.-4200/Class-III,Rs.5200-20200/- GPRs.1900/Class-III,Rs.5200-20200/- GPRs.1900/1 1 2 1 1 Part time, E.E.,PHD,Rkl. Vacant On deputation-2 In house-1 In house-1

D)FINANCE BRANCH:1. Finance Member Sr.Class-I 1 Part time (now Secretary in charge of Finance Member) In house-1 In house-1 In house-1

2. 3. 4.

Accountant(Sr.Asst.) Class-III ,Rs.9200-34800/G.P.-4200/Cashier (Jr.Asst.) Class-III,Rs.5200-20200/GP-Rs.1900/Treasury Sarkar Class-IV,Rs.4440-7440/GP-Rs.1600/-

1 1 1

E) ARCHITECTURE BRANCH:Sr.Class-I 1 Vacant Class-III ,Rs.9200-34800/1 In-house-1 G.P.-4200/Apart from the above regular staff there are 39 persons working on DLR basis. 4. A) Sl. No. 1. 2. SCHEMES COMPLETED:HOUSING SCHEMES:The following housing schemes/site and Services schemes have been completed so farName of the housing/site and Year No. of units No. of services scheme of constructed units compl allotted etion D.F.H.Housing 1979 LIG-138 LIG-138 scheme,Stage-I EWS-92 EWS-92 D.F.H.Housing 1980 EWS-54 EWS-54 scheme,Stage-II LIG-166 LIG-166 1. 2. Arct.Member Arct.Asst.

Remarks

3. 4.

Chhnd Housing Project, Stage-I(HUDCO) Site & Services Scheme, Stage-I (IDSMT) Composite Housing Scheme, Sundargarh Chhend Housing Project, Stage-II. (HUDCO) Chhend Housing Project, Stage-II,Phase-I (S.F.) Site & Services Scheme,Stage-II,Phase-I. Chhend Housing Project,Stage-II.Phase-II(SF) Jawaharnagar Housing Scheme,Stage-I (HUDCO) Jawaharnagar Housing Scheme, Stage-II,.(HUDCO) Site & Services Scheme, Gopabandhunagar, Chhend Site & Services Scheme, Gopabandhunagar, Chhend Plotted Scheme near Jagat Janani Market,CHP-I Duplex Houses Under, CHP-II Gopabandhunagar Housing Scheme, Stage-III

1985 1985

5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.

1992 1994 1992 1994 1995 1996 1996 1997 1997 2001 1998 2000

MIG-110 EWS-96 LIG-230 MIG-84 EWS-187 LIG-124 MIG-61 HIG-29 EWS-48 LIG-256 MIG-105 LIG-I-128 LIG-II-387 MIG-189 MIG-55 HIG-32 HIG-73 MIG-180 HIG-52 MIG-90 LIG-144 MIG-60 LIG-40 MIG-24 MIG(A)-56 MIG(B)-40

MIG-110 EWS-95 LIG-230 MIG-84 EWS-187 LIG-124 MIG-61 EWS-48 LIG-255 MIG-105 LIG-I-128 LIG-II-387 MIG-189 MIG-55 HIG-32 HIG-72 MIG-179 HIG-52 MIG-90 LIG-143 MIG-60 LIG-40 MIG-24 MIG(A)-55 MIG(B)-40

Vacant E/74

VacantL-195

VacantSH-8 S2H-15

Vacant LIG-1 Only core houses Vacant-1

Commercial-6 Commercial-6 Residential-11 Residential-11 HD-114 114 EWS-244 (204+40) LIG-150 MIG-160 LIG-53 MIG-147 HIG-74 (Reserve- 2 nos.) EWS-154 LIG-146 MIG-159 LIG-52 MIG-143 HIG-71 Vacant C3l1-47 C3L-4 nos C3M-137 Vacant LIG-1 MIG-4 HIG-5

17.

Site & Services Scheme (Left out) at Gopabandhu Nagar Housing Scheme, Stage-II,Phase-II.

2006

-:5:5. ON GOING SCHEMES : The detail of ongoing Scheme is furnished below:-

Sl.No.

1. 2. 3. 4. 5.

6.

7. 8. 9. 10. 11.

12. 13 14. 15. 16. 17. 18.

Estimated cost with tender premium. Construction of R.C.C.Culvert to cross road of 1476577.00 GNHS,Stage-II,Phase-II,Rourkela Construction of Central Verge and C.C.Drain of 679000.00 Chhend Main Road from MIICR-6 front ton culvert near ring road of Chhend Rourkela. Improvement of existing drain and construction of 1074476.00 Balance portion of drain to both side of 60-00 wide road at Stage-II,Phase-II,Chhend,Rourkela. Lying of distribution pipeline for W/S arrangement 1974000.00 to site and services scheme to GNHS,StageII,Phase-III chhend,Rourkela. Construction of Road in site and service scheme 5044932.00 between 600(East) and Biramitrapur Railway line(West) of Gopabandhunagar Housing Scheme, Stage-II,Phase-III,Chhend, Roukela Construction of road in site and service scheme 3516254.00 between 100-0 wide road (East) and 60-0 (West )of Gopabandhunagar Housing Scheme,Stage-II,.Phase-III,Chhend,Rourkela Construction of C.C.Drain between 60 and 30 1671000.00 wide road behind convenient shopping centre of GNHS,Stage-II,Phase-III,Chhend,Rourkela. Construction of drain between 100 & 60 wide 1978000.00 road of GNHS,Stage-II,Phase-III,Chhend,Rourkela (Reach-II) Construction of drain between 100 & 60 wide 1953000.00 road of GNHS,Stage-II,Phase-III,Chhend,Rourkela (Reach-I) Construction of culverts in site and services 1948000.00 scheme of GNHS, Stage-II, Phase-III, Chhend, Rourkela Repair of Fakir Mohan Market Complex including 1890200.00 construction of front C.C.Road and construction of C.C.Drain and repair of front and back side drain of F.M.Market complete at Gandhi Road, Rourkela Repair and renovation of bus terminal 1948200.00 building,repair of drive way and site development works at bus terminal Gandhi Road, Rourkela. Repair to internal roads of bus terminal at Gandhi 1415192.00 Road,Rourkela addl.R.C.C. works near service station Repair of 80 wide R.R.Masonry drain infront of 335754.00 SSGR market complex at Gandhi Road, Rourkela Repair of Sanjay Market complex at 7&8 736057.00 area,Rourkela Grading & Tar felting over roof slab and W/S and 662282.00 Sanitation provision J.J.Market complex,Rourkela Construction of West side boundary wall near 454000.00 washing platform at bus terminal, Gandhi Road,rkl Grading and tar felt treatment to roof slab of 73400.00 G.R.R.Shops of North-west side of RM market

Name of the works

6.

DEVELOPMENT PLANS:The following are the Development Areas (Master Plan Areas) coming under the jurisdiction of RDA. a. Rourkela Civil Township b. Rourkela Industrial Complex(Comprising Steel Township, Jalda,jagda & Lathikata) c. Rajgangpur Town d. Sundargarh Town e. Biramitrapur Town. The Master Plan of Rourkela Civil Township has been prepared during 1966 and basing on which the development control is regulated by RDA within the master plan area of Rourkela. Subsequently the Master Plan area of Rourkela Civil Township has been expanded from the existing boundary by addition of 52 RTUs and 52 revenue villages to the existing master plan boundary including Jagda, Jalda, Lathikata, Kalunga, Chikatamati, Kuarmunda etc. to be renamed as Rourkela Industrial Complex.

The Comprehensive Development Plan of the newly formed Rourkela Industrial Complex is under preparation. The following are the positions of the Development plans of the above area. Sl. No. 1. Development Area Rourkela Civil Township Rourkela Industrial Complex (Extended area of Rourkela Civil Township) Master Plan/Interi m Dev.plan Prepared and published on 27.6.66 Comprehensive Remarks Development Plan No. Comprehensive Development Plan to be prepared. C.D.P. exercise The Mastar started Plan boundary of Rourkela Civil Township is extended to Rourkela Industrial Complex for which CDP exercise has been taken up. No No. No. -

2.

3. 4. 5.

Sundargarh Town Rajgangpur Town Biramitrapur Town

Prepared and published on 9.11.87 Prepared and published on 13.5.63 Prepared and published on 1.1.75

7.

BUILDING REGULATION :The Building bye-laws of R.D.A. (Planning and Building standard) is prepared and submitted to Director of Town Planning, Orissa for scrutiny and onward submission to Govt. for approval. Besides above, the RDA has jurisdiction over three other urban areas of Sundargarh District namely, Rajgangpur, Sundargarh and Biramitrapur. The Master Plan of such towns are prepared by Director of Town Planning, Orissa & the develop control in such areas is done by RDA basing on respective Master Plan.

8. DETAIL LIST OF MARKET COMPLEXES IN ROURKELA AND SUNDARGARH OF ROURKELA DEVELOPMENT AUTHORITY, ROURKELA. Sl. No Name of Complex Market Year of Total No. complet of ion shops/co mmercial spaces 3 1983 1989 1979 1990 1990 1980 1976 1981 1999 1989 1985 1987 1981 1983 1984 1996 1996 2004 2004 2004 2004 2004 33 4 66 24 11 41 75 79 17 38 27 29 06 19 14 4 138 16 12 10 05 100 1 4 TotalNo . Ofshop s / Comm ercial spaces allotted 5 31 4 66 24 11 41 75 79 17 38 27 29 06 19 14 4 138 16 12 10 05 100 1 TotalNo . Of shops/ comm. ercial spaces vacant 6 2 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Total monthly demand.

1 I. 1. 2 3 4 5 II 6 7 8 9 III 10 11 12 IV 13 V 14 15 16 VI 17 18 19 20 21 22 23 VI I

2 UDITNAGAR: Super Market Ist.Floor Super Mkt. Tapaswini Market Ext. Tapaswini Mkt. 1st. floor Tap. Mkt. S.T.I. SQUARE Infront of R.G.H. Janata Bipani Tarangini Market Inft. of Hotel Mayfair AREA NO.7&8 Sanjaya Market Shopping Centre Ext. Shopping Centre PANPOSH AREA Panposh Market BASANTI COLONY Trust Market 1st. floor Trust Mkt. D.F.H.P.-I VSS MARKET, COMPLEXCHHEND VSS Market 1St.floor VSS market G Market H Market PINDIs KIOSKs A.T.M. Counter OTHERMARKETAT CHHEND COLONY

7 18,645.00 27,313.00 31,644.00 10,120.00 7,301.00 26,663.00 44,337.00 37,483.00 6,796.00 13,789.00 10,587.00 11,746.00 2,218.00 8,661.00 6,090.00 960.00 50,427.00 90,502.00 6,156.00 5,970.00 1,508.00 15,392.00 932.00

24 25 26 27 28 29 30 31 32 33 34 35 VI II 36 37 38 IX 39 40 41 42 43 44 45 46 47 48 49 50

MIG Block Market Jagat janani Market C2L2 Market Social Home Market BSOMarketCom.Space Near Burial Ground Bmp. Rly. Line Market MSNL Market H.D Market Ext. J.J.Market 1st.floor J.J.Market Kalinga Vihar Market SUNDARGARH Super Market Extn. Super Market 2004 2004 2004 2004 2007 1986

11 79 15 20 10 4 28 26 41 12 5 40 56 24 15

11 79 15 20 10 4 10nos of L.Fbasis 26 41 12 2 40 56 24 14

Nil Nil Nil Nil Nil Nil 18nos outright Nil Nil Nil 3 Nil Nil Nil 01

4,388.00 23,931.00 4,392.00 5,713.00 3,720.00 1,124.00 3,625.00 9,817.00 20,640.00 3,303.00 875.00 12,960.00 25,554.00 7,190.00 4,056.00

Market Near Govt. 1996 College, Sundargarh BUS TERMINAL MARKET COMPLEX S.S.G.R.Market S.S.G.R.,F.F.Market B.T.Market B.T.A.X.Market KIOSK B.T. Counter B.T.Market BTR Market(including Servicing centre and Cycle & scooter stand Fakir Mohan Market G.R.Market 1st.floor B.T.Building 2nd.floor B.T.Building 3rd.floor B.T.Building Total

73 24 45 10 10 08 15 185 14 6(17197sft 5(17172sft 5(7876sft.

73 24 45 10 10 08 15 109 14 6(17197 1(6890) 1(3530)

Nil Nil Nil Nil Nil Nil Nil 76 Nil 5(10282 4(4346)

24,095.00 7,112.00 35,577.00 3,473.00 1,282.00 814.00 27,937.00 41,707.00 9,708.00 35,658.00 10,590.00 7,64,241/-

Advertisement was made for allotment of vacant commercial space of 2nd and 3 floor of Bus Terminal. 4 Nos. of application have been received for allotment of 2763 sft. in 2nd floor and 3rd floor of Bus Terminal, Rourkela. 63 applications have also been received for allotment in F.M.Market.
rd

9.

RIGHT TO INFORMATION ACT:The detail information of Right to Information Act is furnished below:Total No. of application received under RTI Act-05 till date 106 Total No. of information supply to applicant under RTI Act. 96 Total No. of information partly supplied to the applicants under RTI Act. 5 Total No. of information pending/ under progress under RTI Act. 5

10.CASES PENDING & DISPOSED OF IN DIFFERENT COURTS :Sl. No. 1. 2. 3. 4. 5. 6. 7. 4. Courts name Supreme Court High Court State Commission District Forum Civil Courts Industrial Tribunal Commissioner court HUDCO Total Total cases filed 13 135 100 188 42 4 134 5 621 Disposed of 11 36 16 174 33 4 Nil 5 279 Pending 2 99 84 14 9 Nil 134 Nil 342 Won Nil 32 8 127 31 3 Nil 5 206 Lost 11 4 8 47 2 1 Nil Nil 73

11.

UNAUTHORISED AND DEVIATION CASES:The details of unauthorized/deviation cases instituted and amount collection from compounding from 1997 to 2009 under Section 91(1) of ODA Act, 1982 is furnished below:Year No.of cases Cases Cases Cases Compounding Compounding Pending disposed pending assessed realised

Instituted 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 12. 26 364 517 205 96 123 93 165 95 204 84 66 24 390 902 885 901 808 850 989 1034 1233 1317 1383 1406

of 5 222 80 216 51 26 50 5 1 1 1

at hearing stage 26 385 680 805 685 757 824 939 1029 1233 1316 1382 1405

137969/1477774/111358/552378/527247/255774/24962/-

376676/288365/186382/113722/363902/73529/-

ACCOUNTS SECTION :The detail fund position, Receipt and expenditure of Rourkela Development Authority furnished below till to date i.e. on 31.7.09:Sl.No. 1 2. 3. 4. 5. 6. 7. 8. Name of the Bank S.B.I. Bisra Chowk S.B.I.Uditnagar Andhra Bank S.B.I.Sector-14 S.B.I.Sundargarh Spl. Treeasury,Panposh S.D.C.C.Bank U.Co.Bank,Sector-19 Total Amount 5,49,563/221549/1252446/3678870/9508/2368574/12500000/2361 2,03,04,801/Remarks S.B.Account S.B.Account S.B.Account S.B.Account S.B.Account P.L.Account In shape of FDR S.B.Account

Details o FFunds Available with RDA for expenditure:Sl.No. Source of Fund 1. 2. 3 4. 5. 6. 7. 8. 9.

Amount Available WODC 1137392/CDP 2830380/Infrastructure Development in Housing Colonies (04-05) 1364777/Infrastructure Development in Housing Colonies (07-08) 2509745/Construction of boundary for protection of Govt. land 20,00,000/Development of parks and greenery during financial year 15,00,000/2008-09 Funds of Area No.7&8 47,281/Funds of GNHS 187,270/Funds of Infrastructure Development 2,81,186/-

Stamp Duty (99-2K) 5,41,176/Stamp Duty (02-03) 4,58,706/Total:1,28,57,913/RDA own fund 95,24,954.50 Average Revenue Receipt per month Rs. Rs.14,00,034/Average Revenue Expenditure per month-Rs.7,35,397/13.LAND SECTION:The Revenue Department has already allotted Ac.2.00 of land in the village Nua amalipali, Sundargarh in favour of RDA on payment of Rs.36,63,000/- for Housing and Commercial Scheme. Possession of Ac.2.00 has already been handed to RDA by the Tahasildar, Sundargarh. Stapes has been taken to prepare detail layout plan for housing and commercial scheme.

10. 11.

Вам также может понравиться