EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-120 2 May 2013 1 May 2013

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 = 11.00 12.00 13.00 Cloudy (C), 14.00 15.00 16.00 17.00 18.00

Working Date Working Time


19.00 20.00 21.00

22.00

23.00

24.00

Symbols Yesterday No. Description Normal Time man hours Over Time man hours

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. Griding M/C 4" Griding M/C 7" Activities (Yesterday) Area Description Welding M/C 300 Amp. Unit ea ea ea Unit Q'ty Q'ty No. 4 5 6 No. 1 2 3 4 5 No Activities 6 7 8 9 10 11 12 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and Welding Pipe Fire Sub MCC. Modify Grating For 02E003A Remove Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 Grouting Pump Step 2 For 03P020A/B/C Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 36" & 40" Area OSBL 02 03A 03A 03B 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 3 1 1 3 2 No. 1 2 3 4 5 6 7 8 9 10 11 12 Activities (Tomorrow) Grouting Pump Step 2 For 02P006C Modify Grating For 02E003A Remove Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 36" & 40" Area 02 02 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 1 1 1 3 2 Fit-up and Welding Pipe Fire Sub MCC. OSBL Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct Description Indirect A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty No. 7 8 9 Crane 50T. Crane 500T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 5 18 5 10 2 16 4 4 3 3 8 4 1 56 40 144 40 80 16 128 32 32 24 24 64 32 8 7 5 18 5 10 2 16 4 4 3 3 8 4 1 110 Unit ea ea ea 56 40 144 40 80 16 128 32 32 24 24 64 32 8 880 Q'ty 2 2 2 4 Indirect 1 1 4 2 1 1 8 8 32 16 8 8 16 16 16 32 1 1 4 2 1 1 2 2 2 4 8 8 32 16 8 8 16 16 16 32

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1