EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-122 4 May 2013 3 May 2013 8.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Modify Grating For 02E003A Grouting Pump Step 2 For 02P006C Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 Grouting Pump Step 2 For 03P020A/B/C Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 36" & 40" Fabrication Pipe 304H 28" Fabrication Steel Structure Area 02 02 03A 03B 03B 03B 03B 03B 04 05 Shop Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set Joint Set Set Joint Joint Kg. Q'ty 6 12 9 Q'ty 1 1 1 1 1 1 3 1 1 3 2 1 7368 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Modify Grating For 02E003A Install Scaffolding For Trim Cooler Install Structure & Equipment For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform & Stair For 03D020 Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 28" Area 02 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 1 3 1 No. 1 2 3 4 5 6 7 8 9 10 Activities (Tomorrow) Modify Grating For 02E003A Install Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform & Stair For 03D020 Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Fabrication Pipe 304H 28" Area 02 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 1 3 1 3 3 8 4 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 8 18 11 10 2 19 4 56 64 144 88 80 16 152 32 24 24 64 32 8 3 3 8 4 1 4 7 5 17 11 10 2 25 19 51 33 30 8 20 15 9 24 12 5 7 8 18 11 10 2 19 4 3 3 8 4 1 117 81 83 195 121 110 24 152 52 39 33 88 44 13 1,237 Description 2 2 1 4 Indirect 1 1 4 2 1 1 8 8 32 16 8 8 16 16 8 32 2 1 1 3 1 3 2 1 3 9 6 3 8 5 3 13 1 1 4 2 1 1 2 2 1 4 8 11 41 22 11 8 24 21 11 45 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 3 2 No. 7 8 9 Crane 50T. Crane 500T. Trailer Description 3 3 8 4 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 7 20 11 10 2 19 4 56 56 160 88 80 16 152 32 24 24 64 32 8 7 7 20 11 10 2 19 4 3 3 8 4 1 118 Unit ea ea ea 56 56 160 88 80 16 152 32 24 24 64 32 8 944 Q'ty 1 2 2 2 4 Indirect 1 1 4 2 1 8 8 32 16 8 16 16 16 32 1 1 4 2 1 2 2 2 4 8 8 32 16 8 16 16 16 32

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1