Вы находитесь на странице: 1из 1

EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-094 6 April 2013 5 April 2013 8.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Install Steel Structure Trim Cooler Remove sand Bag From Gutter Grouting Foundation Trim Cooler Preparation Area For Lifting Trim cooler Install Steel Structure Reactor 03R003 Installation Insulation For 03D030 Installation Insulation For 05T009 Welding Pipe 24",28" 304H Fabrication Pipe 24",28" 304H Shop Fabrication Steel Structure Area 03A 03B 03A 03A 03B 03B 05 Shop Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set DB DB Kg. Q'ty 4 12 9 Q'ty 1 1 6 1 1 1 1 24 24 7825 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Install Steel Structure Trim Cooler Remove sand Bag From Gutter Grouting Foundation Cooling Water Preparation Area For Lifting Trim cooler Install Scaffolding Reactor 03R003 First Alignment For Pump 03P020A Installation Insulation For 03D030 Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H Welding Pipe 800HT Area 03A 03B 03A 03A 03B 03B 03B 05 Shop Shop Unit Set Set Set Set Set Set Set Set DB DB Q'ty 1 1 26 1 1 1 1 1 24 28 No. 1 2 3 4 Activities (Tomorrow) Area Unit Set Set DB DB Q'ty 1 6 28 28 Lifting Trim Cooler For Transport by trailer03A Preparation Crane 500 T For Lifting Work 03A Fabrication Pipe 24",28" 304H Fabrication Pipe 800HT Shop Shop Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 6 18 12 8 2 19 4 4 3 4 6 4 1 48 48 144 96 64 16 152 32 32 24 32 48 32 8 2 1 6 4 1 2 6 5 16 12 8 2 18 15 48 60 24 6 6 8 3 18 12 3 6 6 18 12 8 2 19 4 4 3 4 6 4 1 117 66 63 192 156 88 22 152 38 32 32 35 66 44 11 1,187 Description 2 2 2 5 Indirect 1 2 3 1 1 1 8 16 24 8 8 8 16 16 16 40 3 1 1 1 2 1 1 3 6 3 3 3 3 9 1 2 3 1 1 1 2 2 2 5 8 19 30 11 11 8 19 19 16 49 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 3 3 1 No. 7 8 9 Crane 55T. Crane 70T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 6 18 12 8 2 19 4 4 3 4 6 4 1 48 48 144 96 64 16 152 32 32 24 32 48 32 8 6 6 18 12 8 2 19 4 4 3 4 6 4 1 117 Unit ea ea ea 48 48 144 96 64 16 152 32 32 24 32 48 32 8 936 Q'ty 1 2 2 2 5 Indirect 1 2 3 1 1 1 8 16 24 8 8 8 16 16 16 40 1 2 3 1 1 1 2 2 2 5 8 16 24 8 8 8 16 16 16 40

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1