Вы находитесь на странице: 1из 6

Tel (Home): +20222634299 (Egypt) Cell: +971502356433 (UAE); +20101695576 (Egypt) E-mail: ahmed_arafia@hotmail.com P.O.

Box 45674, Abu Dhabi, UAE

Ahmed Mahmoud Arafia, PMP


Experience Jun 07- Present Senior Electrical Engineer Plant Engineering Department (PED)

Consolidated Contractors International Company (CCC)


Mussafah Industrial Area, Abu Dhabi, UAE. Example of Handled Projects (Major Projects): EPIC for Berths and Port Infrastructure for Ras Laffan Port Expansion Project, (USD1.7 billion project). Client: Qatar Petroleum Participated in preparation of all detailed design and engineering analyses, calculations and progress engineering deliverables as required to Approved for Construction. Participated in FEED package verification and site survey visits. Prepared engineering documents register (EDR) for electrical activities. Prepared electrical general specification, equipment specification& data sheet for different electrical equipment such as power and distribution transformers, 33kV Gas Insulated Switchgear, 33& 11kV Air Insulated Switchgear, AC& DC UPS, 11kV secondary distribution ring main units, low and medium voltage cables. Prepared electrical power system sizing calculations (load analysis, cable sizing, UPS sizing, DC system sizing). Prepared electrical single line diagrams and equipment protection schemes. Prepared cable layouts (cable routing layouts, cable sections layouts, road crossings details, cable trays layouts, power cable block diagrams). Prepared lighting calculation, lighting plans and block diagrams. Prepared lighting, grounding and lightning power and protection layouts. Prepared interconnection and wiring diagrams. Prepared equipment arrangement layouts. Prepared purchase specifications, fabrication drawings, specifications and procedures for fabrication, transportation, installation, hook-up, precommissioning and testing of the facilities. Prepared material requisitions for quotation for electrical equipment and materials and technical bid evaluation of electrical equipments and materials. Reviewed relay coordination studies, vendor prints for electrical equipments and materials, issued technical queries for electrical equipments and materials.

Prepared material requisition for purchasing for electrical equipments and materials. Prepared electrical power system studies using electrical transient analyzer program (ETAP) PowerStation Software (short circuit calculation, dynamic and static motor starting analysis, power flow studies, grounding calculation). EPIC for Al Khafji FDP Phase-1 Facilities Oil & Gas (onshore), (USD1.5 billion project). Client: KJO; Saudi Arabia Reviewed and validated of client submitted information (FEED). This included some site visits to the existing facilities. Prepared electrical studies/calculations such as sizing of AC and DC UPS, cable sizing calculation, Earthing & Lightning protection system study, load flow study, short circuit study, motor starting study. Prepared several electrical documents such as basis of electrical system design, construction / installation specification, transformers specification& data sheets, 13.8kV, 4.16kV& 480V switchgear specification& data sheets, UPS specification, NGR specification, cables specification& data sheets, earthing specification and MTO, lighting specification, load and cable schedules. Provided electrical input to mechanical and instrumentation packages. Prepared several drawings such as key single line diagrams, symbol and legend drawings, cable routing and trench layouts, typical installation details, hazardous area classification, earthing layouts, small panel boards schedules, electrical and other disciplines interface drawings. Prepared material requisitions, technical bid evaluation, vendor drawings and documents review and purchase requisitions of transformers, 13.8kV switchgear, 4.16kV switchgear, 480V switchgear, 125V DC battery charger, 120V AC UPS, neutral ground resistor (NGR), power management system (PMS), bulk items, lighting, grounding & small power, electrical cables. Provided engineering support during construction phase, precommissioning and commissioning and prepared As-Built drawings.

Sep 06- May 07

Senior Electrical Projects Engineer Schneider

Electric Gulf

Countries
Jebel Ali Free Zone, Dubai, UAE. Example of Handled Projects (Major Projects): Global Recall Recovery Rework (G3R) of Ringmaster Ring Main Units in Gulf Area, (EUR1.2 billion project). I was responsible for all potential quality issues involving Global Recall Recovery Rework (G3R). Managing the G3R process, evaluating the safety risks, developing, validating and implementing action plans. The Project calls for SF6 Gas Reduction & Retrofit Kits Installation of Ringmaster SF6 Ring Main Units supplied and installed in Gulf Area and replacement of ring main units that has lost gas due to a premature fracture of the safety membrane due to hot climatic conditions. Assigned and acted as project manager for the retrofit and upgrade of ring main units sold and installed in Gulf Area. Managed a group of subcontractors to carry out the works in UAE, Qatar, Oman& Kuwait.

Coordinated with electrical authorities and end users for the planned shutdown schedules to execute the modification and (or) replacement of the units. Reduced the SF6 gas fill pressure from 0.8barg (at 20C) to 0.55barg (at 20C) of Ringmaster RN2c (and RE2c, RE6c and RN6c) ring main units that were at either the customer stores or premises or installed on site. Installed outdoor and indoor venting kits for internal arc proof protection.

Feb 06- Aug 06

Senior Electrical QA/QC Engineer TARGET

Engineering

Construction Company LLC


Abu Dhabi, UAE. Example of Handled Projects (Major Projects): Construction Works for Jebel Dhanna Tank Farm Facilities Upgrade, (USD60 Million project). Client: Abu Dhabi Company For Onshore Oil Operations (ADCO) The Project calls for supply and installation of new pipelines and the replacement of existing line pipe, installation of valves and fire fighting systems, instrumentation, electrical, telecommunication and civil works. The electrical scope of work includes cathodic protection, lightning protection, cables and cable trenching, power supply arrangement, control room modification, CCTV system, earthing, lighting etc. My role within the project was the implementation of related QA/QC activities for the works as detailed in relevant Inspection and Testing Plans (ITPs). Ensure that the activities on site are done according to the project specifications in compliance with approved method statement. Inspect and satisfy myself with the completed work before requesting ADCO approval or inspection. Receive the request for inspections from Site Engineer / Foreman for necessary inspection of completed work with ADCO and release it for further activity. Regularly conduct site inspections and monitor the activities for their conformance with applicable specifications and drawings. Maintain quality records of inspections certified by ADCO for any future reference.

May 04- Nov 05

Electrical Projects Engineer Industrial and Petroleum Division

Schneider Electric Egypt

Job Duties and Responsibilities Preparation of technical offers, reviewing customer specification / requirement, issuing clarification / deviation sheets if required, investigating technical risks if any, etc. Preparation of commercial offer including all commercial terms and conditions, terms of payment, financing, credit terms, customs, hard currency exposure, respected due dates, convenient delivery periods, delivery point and achieving competitive price, investigating commercial and technical risks, etc. Preparation of risk management plan, risk assessment chick list, probability and impact risk rating matrix.

Plan and manage project communication to ensure timely and appropriate generation, collection, dissemination, storage and ultimate disposition of project information and provide the critical links among people. Follow up with planning and procurement to ensure the delivery of materials on time. Ensuring that equipment manufacturing in due dates according to planned schedule and respecting the quality standard. Manage expediting visits and progress meetings with client as well as progressive invoices as per contract. Conduct expediting visits and random audits with the client to the supplied equipment such as transformers, bus duct, UPS, etc. Ensure that the finished equipment must pass successfully the client inspection tests (FAT). Prepare the commercial invoices, delivery notes, certificates of guarantee, etc. Clear all the contractual documents related to delivery such as letter of guarantees, invoices, etc. Follow up with packing, order delivery as per contract terms, etc. Manage the commission team at site to ensure the full operability of the supplied system and the full satisfaction of the client. Subsea Development of the Simian/Sienna Gas Fields Offshore Egypt, (USD6 Million project). Client: ENPPI on behalf of BG/ Burullus Gas Company

Example of Handled Projects (Major Projects):

The scope of work includes the Supply, commissioning and start up of MV/LV electrical switchgear, power transformers, UPS, and DC system from the onshore facility to supply the offshore controls platform which will be equipped with similar switchgear. Follow up Engineering, materials delivery/fabrication and subcontractors' progress. Prepare coordination meetings with Clients and Subcontractors. Prepare progress reports. Carry out the same scope of work for The Scarab and Saffron gas fields, the first deepwater development to be undertaken in the Eastern Mediterranean.

Oct 2000- Apr 04

Electrical Maintenance and Projects Engineer

Egyptian Petroleum Maintenance Co. (EMC)


a Joint Venture Company Between Egyptian General Petroleum Corporation (EGPC) and ABB Site Execution (Major Projects): GUPCO Gas Plant substation retrofit and upgrading. Headed a team of two electrical technician and electricians to execute the following: The installation of the power station main switchgear, which included the control panels of two different types of generators, the distribution panels, MCC and the accessory panels in a pressurized shelter. The power cabling, including cable termination and cable tray installation. The interconnection cabling inside the pressurized shelter.

The turbines control cabling. New electrical network at ZEITCO (ex- Ocean Energy): Followed up the fabrication of the substation in our workshops. Installed the panels and the room electrical equipment. Headed a team of one electrical technician and 6 others and installed the substation on the offshore platform. Installed the cable trays allover the platform and the MCT on the substation room. Lay and terminate cables. Carried out tests and handover. Overhead transmission lines at Qarun Petroleum Company (QPCLagoon area). Headed a similar team as above to execute the following: Determine the overhead line route. Erect the pole. Install the overhead line. Install the step down transformers and the electrical accessories, including the termination of cables connecting to the pumps on the production wells. Well A-16 ESP Surface Facilities Hookup at ZEITCO (ex- Ocean Energy): Headed a team of electrical technicians, welders, riggers, grinders and others and carried out the construction activities for the hookup and installation of well A-16 electrical submersible pump Reda (ESP) surface facilities under supervision of Schlumberger. Completed all construction activities in a safe and professional manner during the planned schedule without any production interruption and up to the full satisfaction of ZEITCO. AGIBA (Ashrafi WHP-2 platform): Platform upgrading project. Ocean Energy (Zeitco): Installation of gas detection system at oil tanks area. Ocean Energy (Zeitco): Retrofit and upgrading of lighting system. Ocean Energy (Zeitco): Upgrading and maintenance of main office electrical network. Petrobel (Port Foad) fields: Installation of rental power station. Pipelines Petroleum Company PPC (Shokeir Base): Maintenance of overhead transmission lines. Khalda Petroleum Company (KPC-Tarek Fields): Trouble shooting of fire fighting and gas detection panel.

Site Execution (Other Projects):

Education Professional Certification Training Courses

B.Sc. in Electrical Power and Machines Engineering, 1999, from Ain Shams University, Cairo, Egypt. Project Management Professional, PMP- Certified, Sep 05.

Project Management Professional Course at the American University in Cairo Engineering Services. ETAP PowerStation Version 6, OTI training Center, Dubai, UAE. AutoCAD (2D) course, Cairo, Egypt. Automatic control course at Instituto Salesiano Don Bosco. Primavera P3 Course, American University in Cairo. Contractual Risk Management, Schneider Electric Training Center, Egypt. Communication skills, Schneider Electric Training Center, Egypt. Proficient in the use of various computer software, including AutoCAD (2D), Primavera and all Microsoft Office components. Familiar with electrical engineering software (PSCAD, EDSA, ETAB, CYME, CALCULUX and Matlab). Good knowledge of Programmable Logic Control (PLC). Regular Internet User. Arabic: English: Croatian: French: Date of Birth: Place of Birth: Country of Residence: Marital Status: Single Mother Tongue. Fluent. Under Study. Poor. April, 13, 1977 Cairo, Egypt UAE

Computer Skills

Language Skills

Personal data

Вам также может понравиться