Progressive Firms
WORKFORCE DEVELOPMENT
Workforce Training & Upgrading (WTU) Enhanced BCA-Industry Built Environment Scholarship
MECH C
Provide assistance for companies to reduce cost incurred in technology adoption such as purchase or leasing of equipment.
MECH C
Funding Cap*
(whichever is lower)
Cost
< $100,000
MECH C
Automatic wheel washer Skid Steer Loader
Screed Leveler
Telescopic Handler
Boom Lift
Scissor Lift
PIP
Encourage process improvement through - technologies adoption; or - simplification of work procedures to achieve higher site productivity by at least 20%
PIP
Funding Cap*
(whichever is lower)
50% 50%
Industry
(led by public agency with at least 2 unrelated companies) * per application
70%
PIP
PIP
Only gypsum boards, cement boards and similar drywall systems used in residential projects are supportable. If the material is specified in tender documents, the grant to defray extra material cost will be given to the developer.
1. Demolition works
ROBOTIC DEMOLITION MACHINE
Conventional method
WSH Risks
Operate the machine at a distance from the demolition area Able to reach high work area without the need for worker access
Productivity 60%
MECH C
WSH Risks
Productivity 40%
PIP
WSH Risks
WSH Risks
WSH Risks
modular system reduces the need for additional bracing wider spacing than conventional scaffold frames => more working space
Productivity 22%
PIP
WSH Risks
Machine Assisted Lifting Platform
Elevator use Gondola
Moving Platform
WSH Risks
Proposed Technology / method Moving Platform Lift Installation Method using Temp System.
Moving Platform with the use of Temp Access Frame
Lift Installation by Moving Platform Method with the use of Temp System
19
WSH Risks
Machine Room
Traction Machine
2. Set up template and plumb lift shaft 3. Install motor room & pit equipment 4.Install 1st & 2nd set of guide rail & brackets
Machine Beam
Governor Machine
Counterweight & Frame Main Wire Ropes Work Platform with Toe Guard to be provided Permanent Cab Frame Components TeMP Access Frame
5. Install Car Platform & Frame, Counterweight, Temp Access Frame & Rope 6. Move the moving platform & remove the Temp System
Lift Shaft
WSH Risks
PIP
Projected Outcomes Gondola Method Improvement Expected (%) on using Moving Platform with Temp System over other methods
Area of Improvement
2 workers/lift
4 workers/lift
3 workers/lift
100% savings over scaffold 50% savings over gondola 64% savings over scaffold 35% savings over gondola
21
WSH Risks
Productivity 65%
Hoisting Ladder
MECH C
WSH Risks
MECH C
Productivity 60%
Small enough to be transported in elevator L:2000W:590H:1300mm
WSH Risks
Productivity 150%
PIP
WSH Risks
Productivity 80%
PIP
WSH Risks
Use of RFID for Tracking of Manpower Usage and Access of Confined Space
PIP
WSH Risks
Project Objectives
- To study the project level productivity on MRT projects - To track manpower movement in confined space - To enhance safety on MRT projects
Present Situation
Access Control Point (Top view)
Manual registration Manual tagging on tally board
WSH Risks
Registration Point
Tally Board
Confined Space
WSH Risks
Gantry Readers
Processor
Display Terminal
WSH Risks
Manual tagging on tally board
Registration Point
Tally Board
Confined Space
WSH Risks
PIP
6. Environmental health
Easy to install, less noise, tidier working environment
System Formwork Traditional Timber Formwork
WSH Risks
Productivity 50%
PIP
WSH Risks
2. Insert
WSH Risks
WSH Risks
Productivity 30%
PIP
MECH C
Example:
$100
Expenditure
Supportable automation equipment/ 400% deduction on $100 = $400 Credit system: Tax savings = 17% x $400 = $68 a. Concreting pump b. RideRide-on concrete trowel c. Auto Auto-climb scaffold system d. CNC machinery Pls refer to www.iras.gov.sg e. Computer Computer-aided design/ drafting software
Manpower-related costs Consultancy services Hardware/ software costs (amortised) Training cost
For more info, visit http://www.ida.gov.sg/Sector%20Developme nt/20060929142757.aspx
Definition of SME:
At least 30% of your shareholding is local AND Your company's group annual sales turnover is less than S$100 million OR Your company's group employment size not more than 200 workers
What: $40 million, 2 year programme administered by NTUC/e2i (Employment and Employability Institute) 50% funding for projects that improve work processes Company has to share productivity gains through raising the wages of local low-wage workers When: The IGP was launched in August last year and will run until Aug 2012 More info: http://www.e2i.com.sg/services/employers/inclusive-growthprogramme
Workforce Training & Upgrading (WTU) Scheme Ms Sharon Tan DID: 6325 2096 Email: sharon_tan@bca.gov.sg Ms Cherlyn Lee DID: 6325 5034 Email: cherlyn_lee@bca.gov.sg Building Information Model (BIM) Fund Ms Cindy Liew DID: 6325 1107 Mechanisation Credit (MechC)Scheme Ms Ezrin Raof DID: 6325 5093
E-mail: cindy_liew@bca.gov.sg
E-mail: ezrin_raof@bca.gov.sg
Productivity Improvement Project (PIP)Scheme Ms Phang Li Bin DID: 6325 5071 E-mail: bca_pip@bca.gov.sg Mr Martin Ho DID: 6325 5101 E-mail: bca_pip@bca.gov.sg
For more info, visit: http://www.bca.gov.sg/CPCF/cpcf.html
For any enquires, pleases call the CPCF Hotline: 1800 1800-325
5050
Thank you
We shape a safe, high quality, sustainable and friendly built environment.