Part A: Student Activities


1. Practical Knowledge Training: S. No . 1 Date Branch/ Year/ Section Mech/ II/A Industry visited Neycer, Vadalur No. of days 1 No. of student s 55 Faculty Accompanied Feedback from students Obtained 15 reports from students and an oral presentation about the visit was presented on 31.07.12 Relevant subject knowledge gained Casting process and furnace Casting process and furnace

17-072012

1. Mr D. Ratchaga raja 2. Mr G.Mohan 1. Mr S.Velmurugan 2. Mr A.Balamurugan 3. Mr.K.Vaithiyanathan

17-072012

Mech/ II/B

Neycer, Vadalur

52

2. Student: In-Plant Training: S.No. 1 2 3 4 5 6 7 8 9 Name of Student Annamalai.C Ashwin.V Devanathan.B Gopinath.S Navinkumar.V Ramkumar.C Sivakumar.C Arunkumar.R Pragathish.G Place of the Training Period of the Training From To Knowledge gained/outcome Students gained knowledge on various engine component, their assembly and disassembly, over oiling, maintenance of the engine

18.06.2012 to 28.06.2012 Cuddalore (TNSTC)

3. Co-curricular activities: a) Project presented: Name of Students / S.No. Date Class June to July 2012 M.Jagatheesh / Final Year

Organizer

IGCAR, Kalpakkam

Program/ Paper Name Study of subassembly vibration using shake table and hammer testing

Position

Remarks

Waiting for result

---

Page 1 of 5

Part B: Faculty Activities

1. a) Faculty Deputation / Higher studies / Research work: Ph.d:/M.Tech / M.E. (Full time ):/M.E. (Part Time): Deputation/ Higher S.No. Name of the Faculty Studies/ Institution Research work 1 2 Mr.G.K.Mallieswaran Mr S PannerSelvam Ph.D.(Parttime) M.E. (Parttime) V.I.T AMU

Duration

Current Status 2 Course works completed. Final year

Date of Completion

Impact

3 Years 3 Years

--April-2013

-----

b) Faculty Recruited/Relieved: S.No. 1 2 3 4 5 6 7 8 9 10 1 2 Faculty Name Mr.G.Mohan Mr.R.Anandhan Mr.B.Vasanth Mr.B.RajaBharathi Mr.D.Rajasekaran Mr.S.Velmurugan Mr.R.Murasu Mr.G.Ganesan Mr.P.Nandha Kumar Mr.M.Selvam Mr.D.Manikandan Mr.R.Anbazhagan Qualification M.E M.E M.E M.E M.E M.E M.E M.E M.E M.E M.E M.E Institution P.S.G BARATHIYAR ENGG COLLEGE K.C.T ARUNAI ENGG COLLEGE ANNA UNIVERSITY, TRICHY THIRUVALLUVAR ENGG COLLEGE S.R.M G.K.M MAILAM ENGG COLLEGE VRS BARATHIYAR THIRUVALLUVAR ENGG COLLEGE Recruited/ Relieved Recruited Recruited Recruited Recruited Recruited Recruited Recruited Recruited Recruited Recruited Relieved Relieved Date of Joining/ Relieved 19.04.2012 07.05.2012 23.05.2012 31.05.2012 24.05.2012 14.06.2012 04.06.2012 21.06.2012 14.07.2012 24.07.2012 31.05.2012 31.05.2012

2. Faculty Conferences / Seminars / Work shop/Continuing Education Programme/Symposiumparticipated: Title of Significance and S.No. Date Name of Faculty Organizer Period Programme Knowledge shared 1 B.VASANTH, AP Got knowledge on Education analysis of heat 2 B.RAJA BHARATHI, AP 12.07.12 Program on Innovent, transfer, structural of 3 A.BALAMURUGAN, AP & 2 Days Ansys Bangalore beam and Shared to 4 G.MOHAN, AP 13.07.12 Software students of Final 5 S.ARAMUTHAN, LAB IC Year/Mech

Page 2 of 5

3. Industrial training: S.No. 1 2 3 Date 25.6.12 to 30.6.12 Name of the Faculty B.RAJA BHARATHI, AP G.MOHAN, AP K.VAITHIYANATHAN, Lab Assistant Industry in which Trained Duration Report/ Reference/Outcome Submitted to Dept. library. Learned about the operation, programming and maintenance aspects of CNC Lathe and Milling.

MTAB, Chennai

6 Days

4. Faculty training program in other institutions: Name of Title of S.No. Date Faculty Programme 19.6.12 to 26.6.12 Workshop on Dynamics of Machines

Organizer

Level *

Period

Remarks/Significance Report Submitted to Principal and this Workshop is useful to handle the same subject for V Semester effectively.

B.VASANTH, AP

Savitha Engg College, Chennai

National

6 Days

Page 3 of 5

Part C: Department Activities


1. Class test /IAT performance Subject Class TEST/IAT Name EDC CLASS II - A TEST-I 60 EDC CLASS II - A TEST-II 84 EDC CLASS II - B TEST-I 78 EDC CLASS II - B TEST-II 94 EVS CLASS III TEST-I 68 EVS CLASS III TEST-II 64 TQM CLASS IV TEST-I 84 TQM CLASS IV TEST-II 20

Subject Name MFT-I 61 MFT-I 31 MFT-I 52 MFT-I 25 DOM 100 DOM 89 FEA 70 FEA 75

Subject Name ETD 24 ETD 92 ETD 54 ETD 47 DME 84 DME 51 MECHATRONICS 82 MECHATRONICS 91

Subject Name FMM 85 FMM 92 FMM 68 FMM 85 GDJP 100 GDJP 91 CIM 77 CIM 82

Subject Name KOM 86 KOM 73 KOM 85 KOM 94 EMM 82 EMM 80 PPC 34 PPC 93

Subject Name TPDE 92 TPDE 94 TPDE 43 TPDE 42 AHP 100 AHP 98 ROBOTICS 84 ROBOTICS 77

Remarks

Coaching class for failed students arranged.

2. Attendance Class II (A) II (B) III IV No of working days 23 23 23 23 Total Student Strength 56 (without lateral entry) 57 (without lateral entry) 67 65 No. Less than 75% 6 03 0 6 No. 80 to 90% 12 12 10 17 No. Greater than 90% 25 21 41 25 No. 100% 13 21 13 1

3. Important Decisions: S.No 1 Description Issue of Tools to students in Manufacturing Tech Lab-I and Workshop Existing System No system for tools issue Changes Recommended Introduced tool issue slip Reason/Purpose To ensure the condition of tools after usage.

Page 4 of 5

4. Knowledge Sharing: Date and Venue 6-7-2012 CAM Lab Faculty Name B.RAJA BHARATHI, AP G.MOHAN, AP Topic of Discussion Operation and Programming of CNC machines Expected outcome Faculty members are able to operate the CNC machines.

5. New equipments/Failures /Service in the laboratory: S.No. Item Description Quantity 1 Gear Tooth Vernier 1

Cost Rs3,000/-

Purpose Machine fault To repair Electronics Faults To conduct experiment To conduct experiment To conduct experiment

Force Vibration Setup

Rs10,000/-

Remarks Replaced with new equipment. Problem solved and the machine is in working condition. New equipment New equipment New equipment

3 4 5

Two stage air-compressor test rig Vapour compression refrigeration test rig Air-conditioning test rig

1 1 1

85,000/85,000/1,05,000/-

Date: 16.08.2012 PREPARED BY: