Вы находитесь на странице: 1из 21

Revision Sheet:

Rev.
No.

Description

0.00 Issued for comments.


0.01 Issued for comments.
Note 8 added in Design Assumption & Limitation.
0.02 Issued for comments.
Note 3 Applied forces are considered at bottom of footing.
Spreadsheet revised accordingly.

Date
01-03-2007
02-03-2007
16-07-2007

Design Assumption & Limitation:


1 Design of Foundation is carried out in accordance with CP-65.
2 Foundation is designed as Rigid Foundation resting on soil. Bearing pressure below the
foundation is considered to be linear in nature.
3 Applied forces are considered at bottom of footing.
4 Twisting effect on Pedestal is not considered in design.
5 Manual data entry only in cells with values in blue.
6 Copy and Staad reactions in appropriate sheets.
7 Enter Load factor for S/w and Soil wt in 'Load factor' sheet.
8 Align the axes of the Staad reactions to spreadsheet axes.

R 0.02

R 0.01

CALCULATION REPORT FOR


TRUCK LOADING STATION FOUNDATION

Velosi Job No: 17493


Doc No. PEC-C675-CALC-004
Rev 00

Foundation F2

Units selected for design:

SI

MATERIAL DATA:
Grade of Concrete Fc =

Yield Strength of reinforcement =


Dia of Reinforcement in direction of L =
Dia of Reinforcement in direction of B =
Clear Cover to Reinforcement =
Unit Weight of Concrete
Unit Weight of Soil =
Unit Weight of Backfill =
Net allowable bearing pressure =

40
460
16
16
75
25
19
19
200

Internal angle of friction f of soil =


Angle of friction between conc and soil =
Load factor for S/w and Soil wt =
Factor of safety against sliding =
Friction factor between foundation concrete and soil =
Depth of Water table from Ground =
Number of Load Combinations =

30 O
30 O
1.4
1.5
0.35
2 m
60 nos

N/mm
2
N/mm
200 mm
mm @
200 mm
mm @
mm
3
kN/m
3
kN/m
kN/m3
2
kN/m

GEOMETRICAL DATA :
HPP

Embedment
depth
H = 1.10 m

Y
(Water Table)
Depth of Footing
D 0.40 m

Fy
Fx
Fz

X
4.00 m

Length of Footing L =

Z
L1=
0.75 m

L2=
2.50 m

L3=
0.75 m

O
B1=
0.75 m
0.30 m

0.30 m
Width of Footing
B = 1.50 m

0.40 m
Node Nos:

0.40 m
5

B2=
0.75 m

Page 4 of 21

CALCULATION REPORT FOR


TRUCK LOADING STATION FOUNDATION

Velosi Job No: 17493


Doc No. PEC-C675-CALC-004
Rev 00

LOAD DATA (+ve value of FY implies compression in Pedestal)


(a) Load for Stability (gf = 1.0 )
JOINT

a
b

2
5

L/C

FY

FX

FZ

MX

MZ

146
146

135.08
120.77

0.25
-0.47

9.46
9.29

-22.08
-21.91

0.60
-0.61

(b) Ultimate load combination for concrete design.


JOINT

a
b

2
5

L/C

FY

FX

FZ

MX

MZ

246
246

158.95
75.77

16.66
15.07

2.87
1.38

-4.14
-2.94

41.03
38.86

1. CHECK FOR STABILITY AGAINST SLIDING


Sliding force in X direction = FX =

-0.23 kN
18.75 kN
18.75 kN
0.00 kN
60.00 kN
76.61 kN
392.46 kN
137.36 kN
7.3

Sliding force in Z direction = FZ =


2

2 0.5

Resultant force = F = (Fx +Fz )


Buoyancy force BF =
Self Weight of Foundation SW=
Weight of Backfill =
P= FY + Self Weight of Foundation + Weight of Backfill - BF =
Resisting frictional force = Pxm =
F.O.S. against sliding =

2. CHECK FOR NET BEARING PRESSURE


Gross vertical load Fy = Fya + Fyb + SW + Weight of Backfill =
Total Moment about X = MXtot = (Fya+Fyb)*B1+MXa+MXb+(SW+Fill)*B/2=

392.46 kN
250.35 kN-m
767.02 kN-m

Total Moment about Z = MZtot = Fya*L1+Fyb*(L1+L2)+MZa+MZb+(SW+Fill)*L/2=


ex = (MZtot/FY) - L/2 =

-0.05 m

e<L/6, No Tension in footing.

ez = (MXtot/FY) - B/2 =

-0.11 m

e<B/6, No Tension in footing.

Net Load:
Py = Fya + Fyb + SW + Weight of Backfill =
Mx = Fy*eZ + MXa + MXb =

392.46 kN
-87.99 kN-m
-17.90 kN-m

Mz = Fy*eX + MZa + MZb =


Gross pressure distribution under footing is given by q =

Py
LB

6Mz
L*L*B

6Mx
L*B*B
p3

2.28
p1

11.23
p2

119.59
p3

128.54
p4

kN/m2

p4
Mx

Net pressure intensities under the footing is given by:

p2
p1

-11.02
p1net

-2.07
p2net

Maximum net pressure intensity =

106.29
p3net

115.24
p4net

kN/m2

115.24 kN/m2

Mz

O.K. Less than allowable bearing pressure

Page 5 of 21

CALCULATION REPORT FOR


TRUCK LOADING STATION FOUNDATION

Velosi Job No: 17493


Doc No. PEC-C675-CALC-004
Rev 00

3. CHECK FOR MOMENT AND SHEAR


Net pressure generated below footing due to design load.
Gross vertical load Fy = Fya + Fyb =
Total Moment about X = MXtot = (Fya + Fyb)*B1 + MXa + MXb =

234.72 kN
168.97 kN-m
445.36 kN-m

Total Moment about Z = MZtot = Fya*L1 + Fyb*(L1+L2) + MZa + MZb =


ex = (MZtot/FY) - L/2 =

-0.10 m

e<L/6, No Tension in footing.

ez = (MXtot/FY) - B/2 =

-0.03 m

e<B/6, No Tension in footing.

Net Load:
Py = Fya + Fyb + SW + Weight of Backfill =
Mx = Py*eZ + MXa + MXb =

425.97 kN
-19.91 kN-m

Mz = Py*eX + MZa + MZb =

36.17 kN-m

Gross pressure distribution under footing is given by q =

Py
LB

6Mz
L*L*B

6Mx
L*B*B
p3

66.76
p1

48.68
p2

93.31
p3

75.23
p4

kN/m

p4
Mx

Net pressure intensities under the footing is given by:

p2
p1

48.14
p1net

30.06
p2net

74.69
p3net

Maximum net pressure intensity (fac) =

56.61
p4net

kN/m

Mz

74.69 kN/m2

(a) Check for Moment and One way Shear in X direction:


3
2
1
4

Column at node 2

Column at node 5

Max (p2,p4) =
56.61

Max (p1,p3) =
74.69

56.94
57.66

59.09

65.65

72.21
d
d = D - 75 - 8 =

73.64

74.36

0.5*d
317 mm

Factored Pressure distribution at Critical sections for moment and shear.


Moment at the Critical section 1:
Moment at the Critical section 4:
Moment at the Critical section 5:
Shear at critical section 1:
Shear at critical section 2:
Shear at critical section 3:

8.69 kN-m/m Width of Footing.


-32.83 kN-m/m Width of Footing.
11.17 kN-m/m Width of Footing.

(Midpoint of Col. at node 2 & 5)

47.73 kN
19.97 kN
6.34 kN

Page 6 of 21

CALCULATION REPORT FOR


TRUCK LOADING STATION FOUNDATION

Velosi Job No: 17493


Doc No. PEC-C675-CALC-004
Rev 00

60.60 kN
25.92 kN
8.33 kN

Shear at critical section 5:


Shear at critical section 6:
Shear at critical section 7:
Tensile Reinforcement:
Section 1

Section 4

Section 5

K= M/fcubd =
z= d[0.5+(0.25-K/0.9)] =
Hence z =
Ast = M / ( 0.95 x fy x z )
2

K= M/fcubd =
z= d[0.5+(0.25-K/0.9)] =
Hence z =
Ast = M / ( 0.95 x fy x z )

-0.0082
319.85
301.15
-249

< 0.156
mm
mm
2
mm /m

0.0028
316.02
301.15
85

< 0.156
mm
mm
2
mm /m

K= M/fcubd =
z= d[0.5+(0.25-K/0.9)] =
Hence z =
Ast = M / ( 0.95 x fy x z )

Ast max =
Minimum Reinforcement 0.13% =
Reqd. Spacing of 16 mm dia bar =
Provided Spacing =
Design Concrete shear stress uc =
Section 1

0.0022
316.24 mm
301.15 mm
66 mm2/m

85
520
387
200

Ultimate shear stress v1 =

Ultimate shear stress v2 =

Ultimate shear stress v3 =


Maximum allowed uc =

Section 5

Ultimate shear stress v1 =


Maximum allowed = Min (0.8fcu =0 or 5.00)

Section 6

Ultimate shear stress v2 =


Maximum allowed 1.5uc =

Section 7

Ultimate shear stress v3 =


Maximum allowed uc =

<= 0.95d =

301.15 mm

<= 0.95d =

301.15 mm

Therefore, Ast =

520 mm2/m

Ast,provided =

1005 mm2/m

0.53 N/mm2

Maximum allowed 1.5uc =


Section 3

301.15 mm

mm /m
2
mm /m
mm
mm

Maximum allowed = Min (0.8fcu =5.06 or 5.00)


Section 2

<= 0.95d =

0.10 N/mm2
5.00 N/mm2

O.K.

0.04 N/mm2
0.80 N/mm2

O.K.

0.01 N/mm2
0.53 N/mm2

O.K.

0.13 N/mm2
5.00 N/mm2

O.K.

0.05 N/mm2
0.80 N/mm2

O.K.

0.02 N/mm2
0.53 N/mm2

O.K.

Page 7 of 21

CALCULATION REPORT FOR


TRUCK LOADING STATION FOUNDATION

Velosi Job No: 17493


Doc No. PEC-C675-CALC-004
Rev 00

(b) Check for Moment and One way Shear in Z direction


Column at node 2:

Column at node 5:

Min (p2,p4) =
30.06

Max (p2,p4)
= 56.61
Min (p1,p3) =
48.14

45.99
51.31

Max (p1,p3)
= 74.69
64.07

53.98

69.40

72.07

d 0.5*d
d = D - 75 - 16 - 8 =
301 mm
Factored Pressure distribution at Critical sections for moment and shear.
Moment at the Critical section 1:
Moment at the Critical section 4:

9.55 kN-m/m Width of Footing.


12.81 kN-m/m Width of Footing.

Shear at critical section 1:


Shear at critical section 2:
Shear at critical section 3:

123.11 kN
64.54 kN
32.84 kN

Shear at critical section 4:


Shear at critical section 5:
Shear at critical section 6:

166.52 kN
86.17 kN
43.59 kN

Tensile Reinforcement:
Section 1

Section 4

K= M/fcubd2 =
z= d[0.5+(0.25-K/0.9)] =
Hence z =
Ast = M/0.87fyz =

0.0026
300.12
285.95
83

< 0.156
mm
mm

K= M/fcubd2 =
z= d[0.5+(0.25-K/0.9)] =
Hence z =
Ast = M/0.87fyz =

0.0035
299.81
285.95
112

< 0.156
mm
mm

Ast max =
Reqd. Spacing of 16 mm dia bar =
Provided Spacing =
Design Concrete shear stress uc =
Section 1

112 mm2/m
387 mm
200 mm

Ultimate shear stress v1 =

Ultimate shear stress v2 =


Maximum allowed 1.5uc =

285.95 mm

<= 0.95d =

285.95 mm

mm /m

mm2/m
Therefore, Ast =

520 mm2/m

Ast,provided =

1005 mm2/m

0.55 N/mm2

Maximum allowed = Min (0.8fcu =5.06 or 5.00)


Section 2

<= 0.95d =

0.10 N/mm2
5.00 N/mm2

O.K. (Clause 3.7.7.2)

0.05 N/mm2
0.83 N/mm2

O.K. (Clause 3.7.7.4)

Page 8 of 21

CALCULATION REPORT FOR


TRUCK LOADING STATION FOUNDATION

Section 3

Ultimate shear stress v3 =


Maximum allowed uc =

Section 4

Ultimate shear stress v1 =


Maximum allowed = Min (0.8fcu =0 or 5.00)

Section 5

Ultimate shear stress v2 =


Maximum allowed 1.5uc =

Section 6

Ultimate shear stress v3 =


Maximum allowed uc =

Velosi Job No: 17493


Doc No. PEC-C675-CALC-004
Rev 00
0.03 N/mm2
0.55 N/mm2

O.K.

0.14 N/mm2
5.00 N/mm2

O.K. (Clause 3.7.7.2)

0.07 N/mm2
0.83 N/mm2

O.K. (Clause 3.7.7.4)

0.04 N/mm2
0.55 N/mm2

O.K.

(c) Check for Punching Shear

U0

U0
or

1.5*d

1.5*d

1.5*d

1.5*d

U1

U1

d = average of effective depth in two directions =

309 mm

Column at node 2:
U0 = 2(CB+CL) =

1400 mm

U1 = U0 +12d =

5108 mm

Maximum ultimate Vertical load on column FY =


Ultimate shear stress for U0 =

158.95 kN
0.37 N/mm2

Maximum allowed = Min (0.8fcu =0 or 5.00)

5.00 N/mm2

O.K.

Ultimate shear stress for U1 =

0.10 N/mm2
0.53 N/mm2

O.K.

Maximum allowed uc =
Column at node 5:
U0 = 2(CB+CL) =
U1 = U0 +12d =

1400 mm
5108 mm

Maximum ultimate Vertical load on column FY =


Ultimate shear stress for U0 =

75.77 kN
0.18 N/mm2

Maximum allowed = Min (0.8fcu =5.06 or 5.00)

5.00 N/mm2

O.K.

Ultimate shear stress for U1 =

0.05 N/mm2
0.53 N/mm2

O.K.

Maximum allowed uc =

Page 9 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Unfactored Support Reaction :


Nos L/C :
60
Node-L/C
2-101
2-102
2-103
2-104
2-105
2-106
2-107
2-108
2-109
2-110
2-111
2-112
2-113
2-114
2-115
2-116
2-117
2-118
2-119
2-120
2-121
2-122
2-123
2-124
2-125
2-126
2-127
2-128
2-129
2-130
2-131
2-132
2-133
2-134
2-135
2-136
2-137
2-138
2-139
2-140
2-141
2-142
2-143
2-144
2-145
2-146
2-147
2-148
2-149
2-150
2-151

E-11400-BN-1380-00xx

Node

L/C
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
0.14
139.27
2.37
-3.88
0.08
0.44
0.14
139.27
2.37
-3.88
0.08
0.44
0.06
135.06
-0.54
3.53
0.09
0.33
0.21
143.49
5.28
-11.29
0.07
0.56
-6.51
125.51
2.09
-3.65
-0.15
-15.85
6.78
153.04
2.64
-4.11
0.31
16.73
-0.01
127.83
-2.54
8.57
0.10
0.21
0.24
141.88
7.16
-16.13
0.06
0.60
-10.96
111.91
1.86
-3.40
-0.30
-26.75
11.18
157.79
2.77
-4.17
0.46
27.55
0.11
134.85
2.31
-3.78
0.08
0.40
0.11
134.85
2.31
-3.78
0.08
0.40
0.10
131.91
2.28
-3.72
0.08
0.37
0.06
127.56
1.27
-1.18
0.09
0.31
0.11
130.37
3.21
-6.12
0.08
0.39
-2.13
124.37
2.15
-3.58
0.01
-5.08
2.30
133.55
2.33
-3.73
0.16
5.78
0.08
128.96
2.24
-3.65
0.08
0.35
0.08
128.96
2.24
-3.65
0.08
0.35
0.08
128.96
2.24
-3.65
0.08
0.35
-1.82
118.73
-2.40
8.83
0.16
-4.52
1.98
139.19
6.88
-16.14
0.01
5.21
-1.66
131.06
6.64
-15.83
-0.08
-4.44
1.82
126.87
-2.17
8.53
0.24
5.13
-6.00
113.56
0.49
0.56
-0.03
-15.74
6.16
144.37
3.99
-7.87
0.19
16.43
6.11
140.67
1.28
-0.47
0.26
16.41
-5.95
117.25
3.20
-6.84
-0.10
-15.72
-0.14
101.55
-5.31
15.32
0.10
-0.02
0.24
122.63
9.24
-21.73
0.05
0.57
-16.55
77.68
1.28
-2.62
-0.50
-40.45
16.66
146.50
2.65
-3.78
0.64
41.00
-0.14
101.55
-5.31
15.32
0.10
-0.02
0.24
122.63
9.24
-21.73
0.05
0.57
-16.55
77.68
1.28
-2.62
-0.50
-40.45
16.66
146.50
2.65
-3.78
0.64
41.00
-1.82
106.28
-2.62
9.19
0.15
-4.55
1.97
126.74
6.66
-15.79
0.00
5.18
-1.66
118.60
6.42
-15.48
-0.09
-4.47
1.81
114.41
-2.38
8.88
0.23
5.10
-6.01
101.10
0.27
0.92
-0.03
-15.77
6.16
131.91
3.77
-7.51
0.18
16.40
6.11
128.22
1.06
-0.11
0.25
16.38
-5.96
104.80
2.98
-6.49
-0.10
-15.75
-0.13
114.01
-5.09
14.97
0.11
0.01
0.25
135.08
9.46
-22.08
0.06
0.60
-16.55
90.13
1.50
-2.98
-0.49
-40.41
16.66
158.95
2.87
-4.14
0.65
41.03
-0.13
114.01
-5.09
14.97
0.11
0.01
0.25
135.08
9.46
-22.08
0.06
0.60
-16.55
90.13
1.50
-2.98
-0.49
-40.41

WBS 11456 ECU Cold Section - Structure xx

Page 10 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Unfactored Support Reaction :


Nos L/C :
60
Node-L/C
2-152
2-153
2-154
2-155
2-156
2-157
2-158
2-159
2-160
2222-

E-11400-BN-1380-00xx

Node

L/C
2
2
2
2
2
2
2
2
2
2
2
2
2

152
153
154
155
156
157
158
159
160

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
16.66
158.95
2.87
-4.14
0.65
41.03
-1.82
118.73
-2.40
8.83
0.16
-4.52
1.98
139.19
6.88
-16.14
0.01
5.21
-1.66
131.06
6.64
-15.83
-0.08
-4.44
1.82
126.87
-2.17
8.53
0.24
5.13
-6.00
113.56
0.49
0.56
-0.03
-15.74
6.16
144.37
3.99
-7.87
0.19
16.43
6.11
140.67
1.28
-0.47
0.26
16.41
-5.95
117.25
3.20
-6.84
-0.10
-15.72

WBS 11456 ECU Cold Section - Structure xx

Page 11 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Factored Support Reaction :


Nos L/C :
60
Node-L/C
2-201
2-202
2-203
2-204
2-205
2-206
2-207
2-208
2-209
2-210
2-211
2-212
2-213
2-214
2-215
2-216
2-217
2-218
2-219
2-220
2-221
2-222
2-223
2-224
2-225
2-226
2-227
2-228
2-229
2-230
2-231
2-232
2-233
2-234
2-235
2-236
2-237
2-238
2-239
2-240
2-241
2-242
2-243
2-244
2-245
2-246
2-247
2-248
2-249
2-250
2-251

E-11400-BN-1380-00xx

Node

L/C
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
0.20
190.23
3.22
-5.29
0.11
0.62
0.08
168.13
2.95
-4.80
0.11
0.41
0.20
190.23
3.22
-5.29
0.11
0.62
0.08
168.13
2.95
-4.80
0.11
0.41
-0.11
157.60
-4.33
13.72
0.14
0.12
0.27
178.67
10.22
-23.33
0.08
0.71
-16.53
133.72
2.26
-4.22
-0.46
-40.31
16.68
202.54
3.63
-5.38
0.68
41.13
0.09
183.90
-1.14
5.83
0.13
0.44
0.31
196.55
7.59
-16.40
0.09
0.79
-9.77
169.58
2.81
-4.94
-0.23
-23.82
10.16
210.87
3.63
-5.64
0.45
25.05
-0.03
173.06
-4.13
13.38
0.14
0.26
0.35
194.14
10.41
-23.67
0.08
0.85
-16.44
149.19
2.46
-4.56
-0.46
-40.17
16.77
218.01
3.82
-5.72
0.68
41.28
0.16
183.60
3.14
-5.14
0.11
0.56
0.16
183.60
3.14
-5.14
0.11
0.56
0.20
190.23
3.22
-5.29
0.11
0.62
0.08
168.13
2.95
-4.80
0.11
0.41
0.20
190.23
3.22
-5.29
0.11
0.62
0.08
168.13
2.95
-4.80
0.11
0.41
-0.11
157.60
-4.33
13.72
0.14
0.12
0.27
178.67
10.22
-23.33
0.08
0.71
-16.53
133.72
2.26
-4.22
-0.46
-40.31
16.68
202.54
3.63
-5.38
0.68
41.13
0.08
168.13
2.95
-4.80
0.11
0.41
0.08
168.13
2.95
-4.80
0.11
0.41
0.09
183.90
-1.14
5.83
0.13
0.44
0.31
196.55
7.59
-16.40
0.09
0.79
-9.77
169.58
2.81
-4.94
-0.23
-23.82
10.16
210.87
3.63
-5.64
0.45
25.05
-0.03
173.06
-4.13
13.38
0.14
0.26
0.35
194.14
10.41
-23.67
0.08
0.85
-16.44
149.19
2.46
-4.56
-0.46
-40.17
16.77
218.01
3.82
-5.72
0.68
41.28
0.16
183.60
3.14
-5.14
0.11
0.56
0.16
183.60
3.14
-5.14
0.11
0.56
0.18
146.64
2.46
-4.04
0.08
0.51
0.06
124.54
2.18
-3.56
0.08
0.31
0.18
146.64
2.46
-4.04
0.08
0.51
0.06
124.54
2.18
-3.56
0.08
0.31
-0.13
114.01
-5.09
14.97
0.11
0.01
0.25
135.08
9.46
-22.08
0.06
0.60
-16.55
90.13
1.50
-2.98
-0.49
-40.41
16.66
158.95
2.87
-4.14
0.65
41.03
0.07
140.31
-1.91
7.07
0.10
0.33
0.29
152.96
6.82
-15.16
0.07
0.68
-9.79
125.99
2.05
-3.70
-0.26
-23.92
10.14
167.28
2.87
-4.39
0.42
24.94
-0.05
129.47
-4.90
14.63
0.11
0.16

WBS 11456 ECU Cold Section - Structure xx

Page 12 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Factored Support Reaction :


Nos L/C :
60
Node-L/C
2-252
2-253
2-254
2-255
2-256
2-257
2-258
2-259
2-260
2222-

E-11400-BN-1380-00xx

Node

L/C
2
2
2
2
2
2
2
2
2
2
2
2
2

252
253
254
255
256
257
258
259
260

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
0.33
150.55
9.65
-22.42
0.06
0.74
-16.46
105.60
1.69
-3.32
-0.49
-40.27
16.75
174.42
3.06
-4.48
0.65
41.17
0.14
140.01
2.38
-3.90
0.08
0.45
0.14
140.01
2.38
-3.90
0.08
0.45
0.18
146.64
2.46
-4.04
0.08
0.51
0.06
124.54
2.18
-3.56
0.08
0.31
0.18
146.64
2.46
-4.04
0.08
0.51
0.06
124.54
2.18
-3.56
0.08
0.31

WBS 11456 ECU Cold Section - Structure xx

Page 13 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Unfactored Support Reaction :


Nos L/C :
60
Node-L/C
5-101
5-102
5-103
5-104
5-105
5-106
5-107
5-108
5-109
5-110
5-111
5-112
5-113
5-114
5-115
5-116
5-117
5-118
5-119
5-120
5-121
5-122
5-123
5-124
5-125
5-126
5-127
5-128
5-129
5-130
5-131
5-132
5-133
5-134
5-135
5-136
5-137
5-138
5-139
5-140
5-141
5-142
5-143
5-144
5-145
5-146
5-147
5-148
5-149
5-150
5-151

E-11400-BN-1380-00xx

Node

L/C
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
-0.32
124.92
2.25
-3.85
0.09
-0.32
-0.32
124.92
2.25
-3.85
0.09
-0.32
-0.22
120.69
-0.64
3.50
0.11
-0.15
-0.41
129.15
5.14
-11.21
0.08
-0.49
-6.44
138.69
2.53
-4.09
-0.12
-15.94
5.80
111.15
1.98
-3.62
0.31
15.30
-0.13
113.45
-2.62
8.50
0.11
0.01
-0.45
127.55
7.01
-16.01
0.08
-0.56
-10.49
143.45
2.66
-4.15
-0.27
-26.31
9.91
97.56
1.74
-3.36
0.45
25.75
-0.29
120.50
2.20
-3.76
0.09
-0.28
-0.29
120.50
2.20
-3.76
0.09
-0.28
-0.28
117.56
2.16
-3.69
0.09
-0.25
-0.23
113.20
1.16
-1.18
0.10
-0.17
-0.29
116.02
3.09
-6.08
0.09
-0.28
-2.30
119.20
2.22
-3.71
0.02
-5.43
1.78
110.02
2.03
-3.55
0.17
4.98
-0.26
114.61
2.13
-3.63
0.09
-0.22
-0.26
114.61
2.13
-3.63
0.09
-0.22
-0.26
114.61
2.13
-3.63
0.09
-0.22
-1.86
111.84
-2.16
8.13
0.17
-4.59
1.34
117.38
6.41
-15.39
0.02
4.14
-2.29
125.51
6.64
-15.69
-0.07
-5.50
1.77
103.71
-2.39
8.44
0.26
5.06
-6.25
126.12
1.20
-0.56
-0.02
-16.17
5.74
103.10
3.05
-6.69
0.20
15.72
5.86
99.00
0.41
0.46
0.28
16.00
-6.38
130.22
3.84
-7.71
-0.09
-16.44
0.03
88.60
-5.36
15.21
0.11
0.26
-0.45
109.75
9.08
-21.56
0.06
-0.59
-15.51
133.59
2.56
-3.77
-0.46
-39.21
15.09
64.75
1.17
-2.59
0.62
38.88
0.03
88.60
-5.36
15.21
0.11
0.26
-0.45
109.75
9.08
-21.56
0.06
-0.59
-15.51
133.59
2.56
-3.77
-0.46
-39.21
15.09
64.75
1.17
-2.59
0.62
38.88
-1.84
100.82
-2.36
8.49
0.16
-4.57
1.37
106.36
6.20
-15.03
0.01
4.16
-2.27
114.50
6.43
-15.34
-0.08
-5.49
1.80
92.69
-2.60
8.79
0.25
5.08
-6.23
115.10
0.99
-0.21
-0.03
-16.15
5.76
92.09
2.85
-6.34
0.19
15.74
5.89
87.98
0.21
0.81
0.27
16.01
-6.36
119.20
3.63
-7.36
-0.10
-16.42
0.00
99.62
-5.15
14.85
0.12
0.24
-0.47
120.77
9.29
-21.91
0.07
-0.61
-15.54
144.61
2.77
-4.12
-0.45
-39.23
15.07
75.77
1.38
-2.94
0.63
38.86
0.00
99.62
-5.15
14.85
0.12
0.24
-0.47
120.77
9.29
-21.91
0.07
-0.61
-15.54
144.61
2.77
-4.12
-0.45
-39.23

WBS 11456 ECU Cold Section - Structure xx

Page 14 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Unfactored Support Reaction :


Nos L/C :
60
Node-L/C
5-152
5-153
5-154
5-155
5-156
5-157
5-158
5-159
5-160
5555-

E-11400-BN-1380-00xx

Node

L/C
5
5
5
5
5
5
5
5
5
5
5
5
5

152
153
154
155
156
157
158
159
160

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
15.07
75.77
1.38
-2.94
0.63
38.86
-1.86
111.84
-2.16
8.13
0.17
-4.59
1.34
117.38
6.41
-15.39
0.02
4.14
-2.29
125.51
6.64
-15.69
-0.07
-5.50
1.77
103.71
-2.39
8.44
0.26
5.06
-6.25
126.12
1.20
-0.56
-0.02
-16.17
5.74
103.10
3.05
-6.69
0.20
15.72
5.86
99.00
0.41
0.46
0.28
16.00
-6.38
130.22
3.84
-7.71
-0.09
-16.44

WBS 11456 ECU Cold Section - Structure xx

Page 15 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Factored Support Reaction :


Nos L/C :
60
Node-L/C
5-201
5-202
5-203
5-204
5-205
5-206
5-207
5-208
5-209
5-210
5-211
5-212
5-213
5-214
5-215
5-216
5-217
5-218
5-219
5-220
5-221
5-222
5-223
5-224
5-225
5-226
5-227
5-228
5-229
5-230
5-231
5-232
5-233
5-234
5-235
5-236
5-237
5-238
5-239
5-240
5-241
5-242
5-243
5-244
5-245
5-246
5-247
5-248
5-249
5-250
5-251

E-11400-BN-1380-00xx

Node

L/C
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
-0.44
170.85
3.07
-5.25
0.13
-0.45
-0.32
148.76
2.80
-4.76
0.13
-0.25
-0.44
170.85
3.07
-5.25
0.13
-0.45
-0.32
148.76
2.80
-4.76
0.13
-0.25
-0.08
138.18
-4.43
13.62
0.15
0.18
-0.56
159.34
10.02
-23.15
0.10
-0.67
-15.62
183.18
3.49
-5.35
-0.41
-39.29
14.98
114.34
2.10
-4.17
0.67
38.80
-0.30
164.51
-1.26
5.78
0.14
-0.20
-0.58
177.20
7.40
-16.28
0.11
-0.70
-9.62
191.51
3.49
-5.61
-0.20
-23.88
8.74
150.20
2.65
-4.90
0.45
22.98
-0.17
153.65
-4.23
13.28
0.15
0.04
-0.64
174.80
10.21
-23.49
0.10
-0.81
-15.70
198.65
3.68
-5.70
-0.41
-39.43
14.90
129.80
2.29
-4.51
0.67
38.66
-0.40
164.23
2.99
-5.10
0.13
-0.39
-0.40
164.22
2.99
-5.10
0.13
-0.39
-0.44
170.85
3.07
-5.25
0.13
-0.45
-0.32
148.76
2.80
-4.76
0.13
-0.25
-0.44
170.85
3.07
-5.25
0.13
-0.45
-0.32
148.76
2.80
-4.76
0.13
-0.25
-0.08
138.18
-4.43
13.62
0.15
0.18
-0.56
159.34
10.02
-23.15
0.10
-0.67
-15.62
183.18
3.49
-5.35
-0.41
-39.29
14.98
114.34
2.10
-4.17
0.67
38.80
-0.32
148.76
2.80
-4.76
0.13
-0.25
-0.32
148.76
2.80
-4.76
0.13
-0.25
-0.30
164.51
-1.26
5.78
0.14
-0.20
-0.58
177.20
7.40
-16.28
0.11
-0.70
-9.62
191.51
3.49
-5.61
-0.20
-23.88
8.74
150.20
2.65
-4.90
0.45
22.98
-0.17
153.65
-4.23
13.28
0.15
0.04
-0.64
174.80
10.21
-23.49
0.10
-0.81
-15.70
198.65
3.68
-5.70
-0.41
-39.43
14.90
129.80
2.29
-4.51
0.67
38.66
-0.40
164.23
2.99
-5.10
0.13
-0.39
-0.40
164.23
2.99
-5.10
0.13
-0.39
-0.36
132.29
2.35
-4.02
0.09
-0.39
-0.24
110.19
2.07
-3.53
0.09
-0.18
-0.36
132.29
2.35
-4.02
0.09
-0.39
-0.24
110.19
2.07
-3.53
0.09
-0.18
0.00
99.62
-5.15
14.85
0.12
0.24
-0.47
120.77
9.29
-21.91
0.07
-0.61
-15.54
144.61
2.77
-4.12
-0.45
-39.23
15.07
75.77
1.38
-2.94
0.63
38.86
-0.21
125.94
-1.99
7.01
0.11
-0.13
-0.50
138.63
6.68
-15.05
0.08
-0.64
-9.54
152.94
2.76
-4.37
-0.23
-23.81
8.82
111.63
1.93
-3.66
0.42
23.04
-0.08
115.08
-4.96
14.51
0.12
0.10

WBS 11456 ECU Cold Section - Structure xx

Page 16 of 21

LUMMUS TEC J.V.

LUMMUS-TEC J.V.

TOYO ENGINEERING INDIA LIMITED


TEIL
Client
Plant
Location

Shell Eastern Petroleum (PTE) Ltd.


Shell ECC Project Singapore
Pulau Ular, Singapore

Civil Design
Dept/Sect.
0

Always refer to this number


5139
Calculation
Job

Factored Support Reaction :


Nos L/C :
60
Node-L/C
5-252
5-253
5-254
5-255
5-256
5-257
5-258
5-259
5-260
5555-

E-11400-BN-1380-00xx

Node

L/C
5
5
5
5
5
5
5
5
5
5
5
5
5

252
253
254
255
256
257
258
259
260

Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z


kN
kN
kN
kNm
kNm
kNm
-0.56
136.23
9.48
-22.25
0.07
-0.75
-15.62
160.08
2.96
-4.46
-0.45
-39.37
14.98
91.24
1.57
-3.28
0.63
38.72
-0.32
125.66
2.26
-3.87
0.09
-0.32
-0.32
125.66
2.26
-3.87
0.09
-0.32
-0.36
132.29
2.35
-4.02
0.09
-0.39
-0.24
110.19
2.07
-3.53
0.09
-0.18
-0.36
132.29
2.35
-4.02
0.09
-0.39
-0.24
110.19
2.07
-3.53
0.09
-0.18

WBS 11456 ECU Cold Section - Structure xx

Page 17 of 21

Result Summary
Design of Foundation Slab
O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

1005

5.00

0.80

223
194
Reinf along-Z

0.28

0.15

Provided
Minimum Reinf. 0.13% = 520 mm2/m
Min
3.8
115.2

L/C

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149

E-11400-BN-1380-00xx

Max Net
Bearing
Sliding Pressure
kN/m2

30.3
30.3
115.6
13.7
10.2
10.5
25.7
10.0
6.3
6.4
30.4
30.4
30.4
54.2
21.3
21.4
22.3
30.5
30.5
30.5
21.9
10.1
9.9
22.2
10.6
9.7
10.9
9.5
10.7
7.0
3.8
3.8
10.7
7.0
3.8
3.8
19.5
9.7
9.6
19.6
10.0
9.3
10.2
9.0
12.0
7.3
4.0
4.1
12.0

68.2
68.2
65.9
89.3
75.6
66.7
76.8
101.7
78.8
69.9
66.5
66.5
65.3
57.2
71.2
66.6
61.7
64.2
64.2
64.2
77.2
96.4
101.0
72.7
61.4
73.3
52.6
82.1
85.8
109.9
75.6
67.6
85.8
109.9
75.6
67.6
73.8
91.1
95.7
69.2
58.0
68.9
50.1
76.8
89.2
115.2
80.9
72.0
89.2

1005
186
585
Reinf along-X
Reinf
along-X
Left of 2

Overturning
Check

L/C

No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension

201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249

Max
167

Reinf
Reinf
Reinf
along-X
along-X along-Z
at
Right of 5
at 2
Midpoint

Reinf
along-Z
at 5

O.K.

O.K.

O.K.

Allowable
0.53 5.00

0.53

0.08

0.50

0.14

Shear
Shear
Punching
Shear
at
at
Shear Stress
at 'd'
Face
'1.5*d'

Required Required Required Required Required


U0
U1
Axr
Axr
Axr
Azr
Azr
(N/mm2) (N/mm2) (N/mm2)
(N/mm2) (N/mm2)
(mm2/m) (mm2/m) (mm2/m) (mm2/m) (mm2/m)

-ve sign indicates Reinf required at top


114
- 347
95
150
122
105
- 314
85
138
108
114
- 347
95
150
122
105
- 314
85
138
108
138
- 421
117
169
139
181
- 566
161
216
186
123
- 314
67
166
81
87
- 314
103
111
135
114
- 346
95
149
120
159
- 495
140
196
168
125
- 347
84
167
105
103
- 346
106
134
138
140
- 432
121
174
145
186
- 585
167
223
194
130
- 337
74
174
90
93
- 337
110
119
145
112
- 337
92
147
118
112
- 337
92
147
118
114
- 347
95
150
122
105
- 314
85
138
108
114
- 347
95
150
122
105
- 314
85
138
108
138
- 421
117
169
139
181
- 566
161
216
186
123
- 314
67
166
81
87
- 314
103
111
135
105
- 314
85
138
108
105
- 314
85
138
108
114
- 346
95
149
120
159
- 495
140
196
168
125
- 347
84
167
105
103
- 346
106
134
138
140
- 432
121
174
145
186
- 585
167
223
194
130
- 337
74
174
90
93
- 337
110
119
145
112
- 337
92
147
118
112
- 337
92
147
118
93
- 282
77
122
99
84
- 250
67
110
85
93
- 282
77
122
99
84
- 250
67
110
85
131
- 404
114
157
130
165
- 519
149
200
169
102
- 250
49
137
58
66
- 249
85
83
112
103
- 316
88
132
108
140
- 438
125
171
147
104
- 282
67
139
83

WBS 11456 ECU Cold Section - Structure xx

0.19
0.17
0.19
0.17
0.21
0.27
0.21
0.17
0.18
0.24
0.21
0.17
0.21
0.28
0.22
0.18
0.18
0.18
0.19
0.17
0.19
0.17
0.21
0.27
0.21
0.17
0.17
0.17
0.18
0.24
0.21
0.17
0.21
0.28
0.22
0.18
0.18
0.18
0.15
0.14
0.15
0.14
0.20
0.25
0.17
0.14
0.16
0.21
0.17

0.10
0.09
0.10
0.09
0.11
0.14
0.11
0.09
0.10
0.13
0.11
0.09
0.11
0.15
0.11
0.09
0.09
0.09
0.10
0.09
0.10
0.09
0.11
0.14
0.11
0.09
0.09
0.09
0.10
0.13
0.11
0.09
0.11
0.15
0.11
0.09
0.09
0.09
0.08
0.07
0.08
0.07
0.10
0.13
0.09
0.07
0.09
0.11
0.09

0.05
0.04
0.05
0.04
0.06
0.07
0.05
0.04
0.05
0.07
0.05
0.04
0.06
0.08
0.06
0.05
0.05
0.05
0.05
0.04
0.05
0.04
0.06
0.07
0.05
0.04
0.04
0.04
0.05
0.07
0.05
0.04
0.06
0.08
0.06
0.05
0.05
0.05
0.04
0.04
0.04
0.04
0.05
0.07
0.04
0.04
0.04
0.06
0.04

0.44
0.39
0.44
0.39
0.36
0.41
0.42
0.47
0.43
0.45
0.44
0.49
0.40
0.45
0.46
0.50
0.42
0.42
0.44
0.39
0.44
0.39
0.36
0.41
0.42
0.47
0.39
0.39
0.43
0.45
0.44
0.49
0.40
0.45
0.46
0.50
0.42
0.42
0.34
0.29
0.34
0.29
0.26
0.31
0.33
0.37
0.32
0.35
0.35

Page 18 of 21

0.12
0.11
0.12
0.11
0.10
0.11
0.12
0.13
0.12
0.12
0.12
0.13
0.11
0.12
0.13
0.14
0.12
0.12
0.12
0.11
0.12
0.11
0.10
0.11
0.12
0.13
0.11
0.11
0.12
0.12
0.12
0.13
0.11
0.12
0.13
0.14
0.12
0.12
0.09
0.08
0.09
0.08
0.07
0.09
0.09
0.10
0.09
0.10
0.10

Result Summary
Design of Foundation Slab
O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

O.K.

1005

5.00

0.80

223
194
Reinf along-Z

0.28

0.15

Provided
Minimum Reinf. 0.13% = 520 mm2/m
Min
3.8
115.2

L/C

150
151
152
153
154
155
156
157
158
159
160

E-11400-BN-1380-00xx

Max Net
Bearing
Sliding Pressure
kN/m2

7.3
4.0
4.1
21.9
10.1
9.9
22.2
10.6
9.7
10.9
9.5

115.2
80.9
72.0
77.2
96.4
101.0
72.7
61.4
73.3
52.6
82.1

1005
186
585
Reinf along-X
Reinf
along-X
Left of 2

Overturning
Check

L/C

No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension
No Tension

250
251
252
253
254
255
256
257
258
259
260

Max
167

Reinf
Reinf
Reinf
along-X
along-X along-Z
at
Right of 5
at 2
Midpoint

Reinf
along-Z
at 5

O.K.

O.K.

O.K.

Allowable
0.53 5.00

0.53

0.08

0.50

0.14

Shear
Shear
Punching
Shear
at
at
Shear Stress
at 'd'
Face
'1.5*d'

Required Required Required Required Required


U0
U1
Axr
Axr
Axr
Azr
Azr
(N/mm2) (N/mm2) (N/mm2)
(N/mm2) (N/mm2)
(mm2/m) (mm2/m) (mm2/m) (mm2/m) (mm2/m)

-ve sign indicates Reinf required at top


82
- 282
88
106
115
132
- 411
116
160
135
169
- 534
154
204
176
108
- 272
56
146
68
72
- 272
92
92
122
90
- 272
74
119
95
90
- 272
74
119
95
93
- 282
77
122
99
84
- 250
67
110
85
93
- 282
77
122
99
84
- 250
67
110
85

WBS 11456 ECU Cold Section - Structure xx

0.14
0.20
0.25
0.18
0.15
0.15
0.15
0.15
0.14
0.15
0.14

0.07
0.10
0.13
0.09
0.08
0.08
0.08
0.08
0.07
0.08
0.07

0.04
0.05
0.07
0.05
0.04
0.04
0.04
0.04
0.04
0.04
0.04

0.39
0.30
0.35
0.37
0.40
0.32
0.32
0.34
0.29
0.34
0.29

Page 19 of 21

0.11
0.08
0.10
0.10
0.11
0.09
0.09
0.09
0.08
0.09
0.08

Load factor for S/w and Soil wt:


Nos L/C :
60
Load Case Factor
201
1.4
202
1.4
203
1.4
204
1.4
205
1.4
206
1.4
207
1.4
208
1.4
209
1.4
210
1.4
211
1.4
212
1.4
213
1.4
214
1.4
215
1.4
216
1.4
217
1.4
218
1.4
219
1.4
220
1.4
221
1.4
222
1.4
223
1.4
224
1.4
225
1.4
226
1.4
227
1.4
228
1.4
229
1.4
230
1.4
231
1.4
232
1.4
233
1.4
234
1.4
235
1.4
236
1.4
237
1.4
238
1.4
239
1.4
240
1.4
241
1.4
242
1.4
243
1.4
244
1.4
245
1.4
246
1.4
247
1.4
248
1.4
249
1.4
250
1.4
251
1.4
252
1.4

253
254
255
256
257
258
259
260
0
0
0
0

1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4

Вам также может понравиться