Вы находитесь на странице: 1из 6

REGISTRATION FEES A.

For first registration and subsequent registration and renewal of persons involved in timber industry (1) For manufacture of sawntimber (excluding Belian), RM 100 for each product and Melangangai, Flitch and Hewn Timber (2) For manufacture and establishment of mills for the following products: CLASSIFICATION BY CAPACITY (m3/yr)) PROCESS CATEGORY C PRODUCT TYPES <10,000 metric tonne (I) CHIPPING AND SPLITTING

B 10,000 50,000 metric tonne

A >50,000 metric tonne

Chips Shingles Cooperage (barrel, casks, kegs) Wood particle including wood residue and sawdust Cork, bark based products Cordwood

RM 150

RM 300

RM550

50,000 <50,000 m3 100,000 m3 (II) BOARD MANUFACTURE I


>100,000 m3

Veneer (Peeled and Sliced) Plywood Particleboard Cement Bonded Board Fibreboard (low, RM 500 medium & high density) Oriented Strand Board Hardboard Wood plastic

RM 1,100

RM 2,100

composites Other biocomposites 30,000 60,000 m3

<30,000m3

>60,000 m3

(III) Board Manufacture II


Laminated Board (plywood, Oriented Strand Board, blockboard, particleboard, fibreboard, wood composites) Blockboard Doorskin Particle Block

RM 250

RM 550

RM 1,050

<50,000 m3

50,000 >100,000 100,000m3 m3

(IV) FInishing of Panel Products (Board)

Coated Board (plywood, fibreboard, particleboard, woodchipboard, Oreinted Strand Board, wood composites, biocomposites) Overlay Board (plywood, fibreboard, particleboard, wood chipboard, Oriented Strand Board, wood composites, biocomposites)

RM 450

RM 1,050

RM 2,050

<30,000 m3

30,000 60,000 m3

>60,000 m3

(V) Engineered Wood Manufacture

Laminated Veneer Lumber Glue Laminated (Glulam) Bent wood, Bent Plywood, Bnet

RM 450

RM 1,050

RM 2,050

Board, Laminated Post 5,000 10,000 metric tonne RM 150 1,000 5,000 m3

<5,000 meric tonne (VI) Fuel Manufacture


>10,000 metric tonne

Briquette Charcoal

RM 100

RM 250

<1,000 m3

>5,000 m3

(VII) Mouldings

Mouldings, Picture Frame, Joinery Carving, Toys, Inlay, Lattice, Dowel Turney, Handicraft Door, Window Door and window frame Wooden Flooring Wooden Fence Wooden Handle Furniture including Bamboo and Rattan Furniture Part and Fitting Cabinet Coffin

RM 100

RM 150

RM 250

(VII) Furniture Manufacture

RM 100

RM 150

RM 250

<5,000 m3

5,000 10,000 m3

>10,000 m3

(IX) Wood Modification or Improvement

Improve mechanical strength Improve resistance to chemical RM 150 Reduce effect of Hygroscopicity Improve resistance to fire Wood preservation,

RM 300

RM 550

Kiln Drying 100,000 350,000 adt

<100,000 adt

>350,000 adt

Pulp (Mechanical pulp, Chemical pulp and other Fibre pulp)

RM 450

RM 1,050

RM 2,050

<100,000 m3

100,000 350,000 m3 RM 1,050 3,000 10,000 m3

>350,000 m3 RM 2,050 >10,000 m3

Paper

RM 450 <3,000 m3

(X) Pulp and Paper

Paper products (tissue paper, corrugated, treated, impregnated paper, RM 450 cardboard, news print paper and recycle paper products)

RM 1,050

RM 2,050

<3,000 m3

3,000 10,000 m3

>10,000 m3

(XI) Wood Packaging Material

Pallet Crate Dunnage Packing Block Drum Wooden Box Lockboard Skid

RM 150

RM 250

RM 450

<5,000 metric tonne (XII) Other Forest

5,000 10,000 metric tonne RM 150

>10,000 metric tonne RM 250

Wood ash, bark,

RM 100

Product

tanstuff, cork, insecticide, resin, sap sugar, latex, dye, cane, bamboo, lac, honey, seed, fruit, broom, thatching, wood vinegar and scented wood (gaharu)

B. For persons engaged in more than one product, the fee payable will be the total capacities for the types of products engaged in each process category as in item A(2) above

C. The sale, distribution and marketing of timber Exporter of: (a) Logs (b) Other Timber Products Importer Local Sale of Timber / Storage of Timber RM 2,000.000 RM 100.00 RM 400.00 RM 50.00

D. For persons engaged in more than one activity, the fee payable is the sum of all activities engaged as in item C above (1) Issuance of Replacement Certificate per copy Search fees, per company Extraction of document, per page Registration form, per copy Establishment of new branch, per company RM 250.00 RM 10.00 RM 2.00 RM 2.00 RM 10.00

E. Application for:Change of Name and Ownership of mill Amendment of machinery layout plan: (a) Class A Mill (b) Class B Mill (c) Class C Mill

Fee RM 250

RM 500 RM 300 RM 100

Вам также может понравиться