Вы находитесь на странице: 1из 1

CONSULTANCY SERVICES FOR PROPOSED LIBRARY FOR INGIRIYA PS

ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Task Name Project Start (Award of Consultancy Services by the Ministry (Client) Initial Discussions with the Employer (Ministry/Local Authority) for further Proceedings Preliminery/Schematic Design Phase Site visits to study the given Scope of Work, statutory requirements and discuss with Local authority/Ministry and report to the Client investigate site conditions and constraints and carry out required field Surveys Advice Client regarding specialized Consultant for the soil investigation and obtain soil investigatin report as permitted by the Client Preliminery Architectural Drawings Ministry/LA Approvals for Preliminery Architectural Drgs. Preliminery Structural Design Preliminery Electrical/Services Design Preliminery Bills of Quantities Submission of Preliminery Designs, Priliminery Project Estimates (PPE) and BoQs for approvals from 'Ministry/LA' Approvals from 'Ministry/LA' for Designs, PPE and Boq Design Development Phase Prepare and submit detailed Architectural, Structral, Electrical and Services drawings and other documents to Client Prepare Total Cost Estimates (TCE) including contingencies and price escalations Client's approvals for Detal design and TCE Construction Document phase Finalize Contract Strategy and paper advertise for the Invitation of Bids Prepare working drawings for Architectural, Structural and services drawings Prepare BoQs, specifications and preambles. Prepare Draft Tender Documents and approvals from client Prepare Firm Total Cost Estimate ( FTCE) and obtain client's approvals Submit Priced and sealed Boq to the Client Bidding and Negotiation Phase Assist Client to issuing Tender documents Conduct pre bid meetings Assist Client for Tender Opening Evaluation of Bids and recommend responsive and evaluated Tenderers. Prepare Construction Contract documents and issue to the selected Contractor Signing of Contracts and issuing of Order to Commence letter End of Pre Contract Period #$ Duration 0 days 1 day 25 days 2 days 3 days 9 days 11 days 2 days 13 days 8 days 3 days 0 days 1 day 2 days 1 day 1 day 0 days 18 days 14 days 3 days 3 days 3 days 2 days 2 days 13 days 5 days 1 day 0 days 3 days 3 days 0 days 0 days 1 #$ 7/26 7/29 7/15 7/19 7/21 7/19 7/23 7/28 8/2 8/ 8/ 6/25 7/12 7/12 7/12 7/15 7/14 7/14 7/14 7/14 7/16 7/19 7/20 7/8 7/9 7/8 7/9 7/9 7/7 6/18 6/25 7/2 6/3 6/4 6/7 6/7 6/8 6/23 6/9 6/17 6/22 6/24 7/6 7/6 7/6 7/6 7/7 29 6/2 June 2010 1 4 7 6/2 6/2 10 13 16 19 22 25 28 July 2010 1 4 7 10 13 16 19 22 25 28 August 31 3

Project: LIBRARY_INGIRIYA PS Date: 08/03/2010]

ARCHITREND CONSULTANTS

Вам также может понравиться