Вы находитесь на странице: 1из 8

1.

The solution to the LP relaxation of a maximization integer linear program provides an upper bound for the value of the objective function.

Answer False 2 points

True

Question 2
1. If exactly 3 projects are to be selected from a set of 5 projects, this would be written as 3 separate constraints in an integer program.

Answer False 2 points

True

Question 3
1. In a mixed integer model, some solution values for decision variables are integer and others are only 0 or 1.

Answer False 2 points

True

Question 4
1. If we are solving a 0-1 integer programming problem with three decision variables, the constraint x1 + x2 1 is a mutually exclusive constraint.

Answer False 2 points

True

Question 5
1. Rounding non-integer solution values up to the nearest integer value will result in an infeasible solution to an integer linear programming problem.

Answer False 2 points

True

Question 6
1. If we are solving a 0-1 integer programming problem, the constraint x1 x2 is a conditional constraint.

Answer False 2 points

True

Question 7
1. If we are solving a 0-1 integer programming problem, the constraint x1 + x2 1 is a __________ constraint. Answer multiple choice mutually exclusive

conditional corequisite 2 points

Question 8
1. If the solution values of a linear program are rounded in order to obtain an integer solution, the solution is Answer always optimal and feasible sometimes optimal and feasible always optimal but not necessarily feasible never optimal and feasible 2 points

Question 9
1. Assume that we are using 0-1 integer programming model to solve a capital budgeting problem and xj = 1 if project j is selected and xj = 0, otherwise. The constraint (x1 + x2 + x3 + x4 2) means that __________ out of the 4 projects must be selected. Answer exactly 2 at least 2 at most 2 none of the above 2 points

Question 10

1. You have been asked to select at least 3 out of 7 possible sites for oil exploration. Designate each site as S1, S2, S3, S4, S5, S6, and S7. The restrictions are: Restriction 1. Evaluating sites S1 and S3 will prevent you from exploring site S7. Restriction 2. Evaluating sites S2 or S4 will prevent you from assessing site S5. Restriction 3. Of all the sites, at least 3 should be assessed. Assuming that Si is a binary variable, the constraint for the first restriction is Answer S1 + S3 + S7 1 S1 + S3 + S7 1 S1 + S3 + S7 = 2 S1 + S3 + S7 2 2 points

Question 11
1. In a __________ integer model, some solution values for decision variables are integers and others can be non-integer. Answer total 0-1 mixed all of the above 2 points

Question 12
1. Max Z = 5x1 + 6x2 Subject to: 17x1 + 8x2 136 3x1 + 4x2 36

x1, x2 0 and integer What is the optimal solution? Answer x1 = 6, x2 = 4, Z = 54 x1 = 3, x2 = 6, Z = 51 x1 = 2, x2 = 6, Z = 46 x1 = 4, x2 = 6, Z = 56 2 points

Question 13
1. In a capital budgeting problem, if either project 1 or project 2 is selected, then project 5 cannot be selected. Which of the alternatives listed below correctly models this situation? Answer x1 + x2 + x5 1 x1 + x2 + x5 1 x1 + x5 1, x2 + x5 1 x1 - x5 1, x2 - x5 1 2 points

Question 14
1. If we are solving a 0-1 integer programming problem, the constraint x1 + x2 = 1 is a __________ constraint. Answer multiple choice mutually exclusive conditional

corequisite 2 points

Question 15
1. Binary variables are Answer 0 or 1 only any integer value any continuous value any negative integer value 2 points

Question 16
1. You have been asked to select at least 3 out of 7 possible sites for oil exploration. Designate each site as S1, S2, S3, S4, S5, S6, and S7. The restrictions are: Restriction 1. Evaluating sites S1 and S3 will prevent you from exploring site S7. Restriction 2. Evaluating sites S2 or S4 will prevent you from assessing site S5. Restriction 3. Of all the sites, at least 3 should be assessed. Assuming that Si is a binary variable, write the constraint(s) for the second restriction Answer S2 +S5 1 S4 +S5 1 S2 +S5 + S4 +S5 2 S2 +S5 1, S4 +S5 1 2 points

Question 17

1. If we are solving a 0-1 integer programming problem, the constraint x1 = x2 is a __________ constraint. Answer multiple choice mutually exclusive conditional corequisite 2 points

Question 18
1. The Wiethoff Company has a contract to produce 10000 garden hoses for a customer. Wiethoff has 4 different machines that can produce this kind of hose. Because these machines are from different manufacturers and use differing technologies, their specifications are not the same.

Write a constraint to ensure that if machine 4 is used, machine 1 will not be used. Answer Y1 + Y4 0 Y1 + Y4 = 0 Y1 + Y4 1 Y1 + Y4 0 2 points

Question 19
1.

Consider the following integer linear programming problem Max Z = 3x1 + 2x2 Subject to: 3x1 + 5x2 30 4x1 + 2x2 28 x1 8 x1 , x2 0 and integer What is the optimal solution? Write your answer in the form : ( x1, x2, z). (For example, the expression (10, 20, 50) means that x1 = 10, x2 = 20, and z = 50).

Answer 2 points

Question 20
1. Consider the following integer linear programming problem Max Z = 3x1 + 2x2 Subject to: 3x1 + 5x2 30 5x1 + 2x2 28 x1 8 x1 ,x2 0 and integer What is the optimal solution? Write your answer in the form : ( x1, x2, z)

Вам также может понравиться