Академический Документы
Профессиональный Документы
Культура Документы
5411
04788'11
KHS
2 THE PEOPLE OF THE STATE OF MICHIGAN ENACT: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SEC. 10FF. (1) THE COMMISSION SHALL DO ALL OF THE FOLLOWING: (A) REQUIRE AN ELECTRIC UTILITY TO ALLOW A CUSTOMER TO DECLINE THE INSTALLATION OR USE OF AN ADVANCED METER. (B) REQUIRE AN ELECTRIC UTILITY, AT A CUSTOMER'S REQUEST, TO UNINSTALL ANY ADVANCED METER. (C) REQUIRE THAT AN ELECTRIC UTILITY DOES NOT GIVE ANY METER USE DATA FROM AN ADVANCED METER TO ANY PERSON OTHER THAN THE ELECTRIC UTILITY. (D) PROHIBIT AN ELECTRIC UTILITY FROM SHUTTING OFF SERVICE TO A CUSTOMER BASED ON ANY OF THE FOLLOWING REASONS: (i) THE AMOUNT OF ELECTRICITY THE CUSTOMER USES. (ii) THE CUSTOMER DECLINING THE INSTALLATION OR USE OF AN ADVANCED METER. (E) PROHIBIT AN ELECTRIC UTILITY FROM IMPOSING ANY DISINCENTIVE ON A CUSTOMER FOR NOT ACCEPTING THE INSTALLATION OR USE OF AN ADVANCED METER. (F) PROHIBIT AN ELECTRIC UTILITY FROM OBTAINING DATA FROM AN ADVANCED METER MORE THAN ONCE PER MONTH, UNLESS REQUESTED BY A CUSTOMER. (G) REQUIRE AN ELECTRIC UTILITY, 30 DAYS BEFORE INSTALLING AN ADVANCED METER, TO SEND A NOTICE TO THAT CUSTOMER INFORMING THE CUSTOMER OF THE RIGHT TO DECLINE THE INSTALLATION OR USE OF AN ADVANCED METER. (H) ISSUE A REPORT EACH YEAR TO THE HOUSE AND SENATE STANDING COMMITTEES WITH OVERSIGHT OF PUBLIC UTILITIES ISSUES OUTLINING ELECTRIC UTILITIES' COMPLIANCE WITH THIS SECTION.
04788'11
KHS
3 1 2 3 4 (2) AS USED IN THIS SECTION, "ADVANCED METER" MEANS A METER THAT IS CAPABLE OF MEASURING, RECORDING, STORING, AND REPORTING USAGE ACCORDING TO PREDETERMINED TIME CRITERIA AND THAT ALLOWS 2WAY COMMUNICATIONS SUITED FOR DEMAND-RESPONSE PROGRAMS.
04788'11
Final Page
KHS