CONSTRUCTION

MANAGEMENT
SERVICES

DFD ENTERPRISES, INC


Dan LaManno, Vice President
bldrdan@hotmail.com
DFD ENTERPRISES, INC
DFD ENTERPRISES, INC. can provide
senior level professional construction Our team leads by example! We go the
personnel in all aspects of project and extra mile. Our energy is contagious.
construction management. We are a Let us show you how professionals are
corporation with a network of licensed ready to meet our clients needs. We're
Architects, Engineers and Contractors. ready!

EXPERIENCE !!! PARTNERS ! !!

The principal resume along with a list of We believe in partnering! We develop a


references provides evidence that our win/win process for everyone. Clear
personnel have successfully carried out expectations, target dates, quick fair
on-site responsibilities and have resolutions and follow-up, follow-up,
expertise in design, plan review, plan follow-up. We communicate effectively,
evaluation, constructability reviews, are familiar with our role and are
value engineering, scheduling, cost sensitive to the important roles of other
benefit analysis, claims avoidance, team members. You'll win with DFD
construction administration and ENTERPRISES, INC.
management.
THE DFD ENTERPRISES, INC.
SCHEDULE MANAGEMENT !!! Winning Formula !!!

We have extensive experience in Our objective is to provide quality


specifying schedules and coordinating professional services to our clients at
contractors for compliance. We use an affordable price. Many
weekly meetings and two week rolling firms market quality of services: We
schedules to confirm that the overall provide it. Our goal is to have repeat
Critical Path Schedule, for the project, clients who feel compelled to
is accurate. Recovery plans are recommend our firm based on our
formulated as work proceeds, not in the performance.
last days when it is too late.
RESULTS ! RESULTS ! RESULTS !
GOVERNMENT AGENCY
EXPERTISE !!! We will assemble a Construction
Management team that is results
Our team has successfully executed oriented. We have proven to numerous
funding applications, accounting and owners that the best teams produce the
project management services on best results. This is accomplished by
numerous projects. We have developed organizing an experienced senior staff
a professional rapport with the building of professionals, and giving them the
and Safety departments both county l support and leadership they need to
and locally, Fire Marshall, local utility ensure a successful project.
companies and we assist public
agencies willingly. We maximize your
level of funding with creative solutions
and professional tenacity!
TEAM BUILDING
ENTHUSIASM!
People build projects, so first we
develop a common mission to meet the Several factors impact cost, and our
Client's goals. As the professional team helps owner's determine their
leader of the construction team, DFD expectations of the building and budget
ENTERPRISES' objective is to early. The design team often starts in
assimilate the members of the team into one direction, and needs to make
a cohesive unit whose major objective several course corrections as it
is completion of the owner's project on develops an understanding of the
time and on budget. owner's complex criteria to meet user's
needs. Historical cost and building
To accomplish this, we stress partnering configuration data is used to avoid
techniques whereby all the parties are going too far down a certain building
in a win/win situation. Our role is a system design to find that it is too
non-adversarial one. We respect and costly. We document field verification
treat all parties to the contract in a facilitating site tours by each design
professional manner. discipline and Client technical staff.

DESIGN PHASE PROCEDURES Our staff is also experienced in serving


as liaison with local zoning plan review
DFD ENTERPRISES will draft and agencies and walk the tight rope to
facilitate a process for the members of involve and generate ownership and
the owner's staff and design team to cooperation while holding firm on issues
confirm procedures for communication not under local jurisdictions.
and documentation of project
information. Clear understandings of We follow the California Environmental
chain of command as well as confirming Quality Act (CEQA) check lists assisting
Client personnel and local agency Clients in filing Notices of
contacts are addressed. A responsibility Determinations, Exemptions, or select
matrix is reviewed to confirm roles of firms to develop Negative Declarations
the team. DFD ENTERPRISES issues or Environmental Impact Documents.
a design procedures brief to collect the Once the written program is issued,
teams goals and objectives for future formal approval is facilitated so design
reference. does not begin without all issues
resolved to address the project's goals.
BUDGET REVIEW
SCHEMATIC DESIGN
Our estimating staff gathers actual bid
data on projects we work on, as well as Our team attends meetings with the
projects of similar use in other Clients. design firm and owner's design advisory
This historical data is used to guide the committee. Minutes are issued
Client in establishing realistic budgets documenting all design decisions. Value
that include construction labor and engineering, or the process of
material costs as well as project support maximizing function for the least cost, is
costs such as site acquisition, financial implemented early and is an on going
consulting, design fees, plan reviews, "process". It is not an "event." The
general conditions, equipment and start design team must avoid utilizing
up costs. These items are managed systems that are known historically to
with monthly adjustments to scope and malfunction or exceed cost
cost reported. requirements.

PROGRAMMING PHASE
Procedures for assembling the building provide "Value Engineering" (VE)
or "constructability" are also reviewed analysis of systems and products.
continuously. Costs are reviewed with
all contingencies and escalations The VE process is most effective when
identified. When scope and cost issues applied throughout the design process;
are resolved, formal approval is not just when it appears cost may
received and the team moves on to exceed the budget. The most effective
further design efforts. time to beneficially affect the cost of a
project is while it is still in the early
DESIGN DEVELOPMENT stages on the drawing board!

Assumption of cost and scope is "CONSTRUCTABILITY" AND


confirmed with further engineering and "BIDDABILITY"
better layouts. This refinement is
reflected in cost containment. Our experienced field staff will review
the bid documents, as they are
SERVICES DURING THE developing, to determine if the methods
PREPARATION OF WORKING and details of construction are suitable
DRAWINGS, SPECIFICATIONS AND for the circumstances, taking into
OTHER CONTRACT DOCUMENTS. account access to the site, staging
areas, availability of specialized
Our in-house professionals and tradesmen, equipment or materials,
consultants (a part of the technical feasible hoisting methods, soil
review team), have provided technical conditions, soil disposal areas, borrow
and/or design services on numerous pits, anticipated weather cycles,
projects. They know local design existing adjacent structures, available
criteria, local codes and practices. services, and a myriad of other
considerations.
It still takes thoroughness,
professionalism and experience to Our estimating staff will review the bid
generate a quality set of contract documents prior to the bidding process
documents, even using state-of-the-art to ensure that the scope of work is
CAD generated drawings. The goal adequately defined, ambiguities are
through teamwork, is to work toward an eliminated, and the bid form is
ideal set of documents. To facilitate that uncomplicated.
objective, we review the plans and
specifications for completeness and In order to obtain the most competitive
accuracy, and provide a written report bids, the bidders need to focus all their
on our findings and recommendations attention on assembling the lowest
for changes and improvements. complete price. They should not be
concerned about extraneous
COST ESTIMATES AND VALUE breakdowns and unit prices which can
ENGINEERING be provided after the bid deadline.

Our experienced estimating staff will COMMUNICATING


review the design consultant's cost RECOMMENDATIONS MADE DURING
estimates at each level of submission THE PRE-CONSTRUCTION PROCESS
provided for in the design consultant's
agreement, checking quantities and unit The comments and recommendations
prices. Independent estimates may be of our review team will be compiled into
provided as needed. Additionally we will formal reports.
Additionally, comments or requirements active in the various areas of the State
from the user group, can be of California, which will assist to ensure
incorporated into the reports. adequate interest in bidding the work.

Experience indicates the most effective PRE-BID MEETINGS


way of insuring that the comments and
recommendations are taken into Pre-bid meetings, in addition to allowing
account is to: the bidders to visit the site and to ask
questions, should also be an
1. Transmit a copy to the design team opportunity to provide a positive
for review and assimilation. impression of the Construction
Manger's {CM} role in the process. We
2. Convene a team meeting (Owner, will be represented by knowledgeable
User, Design Team and CM) to people provided with well thought out
address each item. presentations, illustrating security
issues, phasing diagrams, etc., suitable
3. Document the disposition of each for each bid package.
review comment or
recommendation (agreed to and Every effort will be made to ensure that
incorporated, or rejected). the bidders are confident that the
management of the project will be
Our technical review team members will handled by experienced and fair people
be present when these team meetings who will make timely, unbiased and
are held to expand upon their written reasonable decisions.
comments on any issues as needed.
We will seek the most cost effective The competitiveness of the bids will, in
and workable solutions to the questions part, be based on this perception.
raised in the review process, acting in
the client's best interest. REVIEW & ISSUANCE OF ADDENDA

CONSULTANT SELECTION The key to successful addenda


management is to plan ahead what
Our people help you select specialists kinds of addenda will be needed and to
when needed. Our registered schedule their production and issuance
professionals, having had prior realistically. We will review addenda
responsibility for producing contracts, prepared by the consultants to help
plans and project start-up are familiar ensure their timeliness, responsiveness,
with the effort and cost involved. We clarity and relevance.
can assist the owner in selecting the
teams, negotiating their agreement and Addenda are frequently prepared under
coordinate their services. duress because of time pressures
resulting from the setting of a bid date.
Unless they are well prepared, they
ADVERTISING FOR BIDS may simply generate more confusion,
and raise more questions; thus resulting
One of our roles would be to contact in less competitive bids or future claims.
local prime contractors, subcontractors,
vendors and suppliers to solicit their EVALUATION OF BIDS
bids. The members of our firm have,
over the years, developed an extensive Our estimating staff will evaluate the
list of contractors and subcontractors bids to help identify those which may be
significantly under priced, portending a and to carefully coordinate the
contractor failure or lack of contractors to ensure progress against
performance, or overpriced, affecting that baseline.
the owner's budget.
The baseline schedule, before we
We will evaluate any anomalies or accept it, will be scrutinized closely,
qualifications, and make a written looking for excessive duration’s (which
recommendation to the owner regarding allow less float to accommodate
a contract award. problems) and for faulty logic.
Developing our own baseline schedule
FIELD COORDINATION OF for comparison, and to determine if the
CONSTRUCTION contractor’s schedule is realistic will do
this.
The key to field coordination is
communication. Coordinating the PROFESSIONAL CONSTRUCTION
activities of several prime contractors MANAGEMENT
and their subs, suppliers of owner
furnished equipment, utility companies Implementation
and their communications with the
design consultants can leave no room From the contractor's submittals, we
for surprises. Weekly construction will know when key materials, products
meetings and their widely distributed and equipment are required on site, the
meeting minutes are a good way to scheduled start and duration of each
maintain that communication. major activity of the work and the
staffing requirements needed to
Settled issues will be recorded, complete the activities as scheduled.
unsettled issues noted, (with the party
responsible for taking action shown), We will also know from our project
and carried forward to successive records the status of the
minutes until resolved. submission/review/approval process for
materials, products and equipment, the
We will prepare two week look ahead actual starts of activities and the actual
excerpts from the overall schedule to manpower commitments made by the
distribute at the weekly construction contractors.
meeting to facilitate planning of
activities manpower needs. Our first hand observation and
evaluation of project events will provide
Our experienced field staff will have a the information needed to compare
thorough knowledge of the Contract actual and projected progress against
Documents and the interface and scope scheduled progress.
of the separate bid packages. As construction managers, we will use
SCHEDULE DEVELOPMENT, this information to identify trends or
IMPLEMENTATION AND outright examples of non-performance
MODIFICATION that, if unchecked, could lead to slipped
schedules. It will be our policy to advise
Development the owner of every potential schedule
slippage, with ideas for correction, as
One of the keys to success for quickly as we know it.
completing a project on time is to obtain
a baseline schedule from the Modification
contractors very early on in the process,
Slipped schedules are sometime available time to doing what they can
unavoidable, and the early identification do best, administer the contract and
of problems allows for recovery plans to manage construction.
be developed to regain lost time. The
key is to detect potential slips early and Shop Drawing Processing
to make frequent but minor adjustments
through the course of the work. There will be thousands of transactions
associated with the submission, review
If more drastic recovery plans are ever and approval of shop drawings ( and
needed, we work with contractors and other required submissions). To help
their subcontractors to explore the ensure that submittals are processed in
options available; more labor and/or a timely manner, we will require that
equipment, better supervision, submittals be incorporated into the
overtime, revised logic, etc. Sometimes contractor's overall schedule.
even the contractor's learning curve can
be counted on to produce shorter Factors to be taken into account are the
duration’s for repetitive activities. needed-on-site dates of manufacturing,
procurement lead-time. When a realistic
The recovery plan chosen will depend and achievable submittals schedule has
on the severity of the slip and the been agreed upon, the CM must
urgency of the completion date. monitor the progress of each
submission through the process.
As the owner's representative, we
would explore the options, and their It is one thing to advise the contractor
impact on cost, and submit our that he is two weeks late in making a
recommendations for approval. certain submission and quite another to
advise him ahead of time to make his
DFD ENTERPRISES has the forms for submission by the given date. The
Pay Applications, Submittals, Proposed management of shop drawings is a time
Change Orders (PCO's) Processing, consuming but not difficult assignment.
Field Instructions, etc. These, coupled Our logs record the required information
with the owner's special forms, provide and our Management Information Team
us, the CM, with what we need to produces the required management
deliver administration services. reports and documents.

We recognized the importance of the


facet of the work and propose to
formulate a Management Information
team that will be responsible for
processing and delivering the Status Reporting
necessary information in a timely
manner. We recognize the importance of the
owner being informed of accurate
The technical staff manages this work project costs and construction progress.
but their contributions are technical To this end, we have established
only; they are not burdened with the state-of-the-art Management
day to day data collection, processing Information System (MIS). Information
and distribution. Our objective is to can be assembled in an infinite number
provide the technical staff with this of ways and submitted at any
administrative support in order that they frequency.
may direct the greatest part of their
What must be determined, however, is 2. Concurrent with #1, work with
who needs what, and when do they Contractors, and Suppliers to see if
need it. delivery can be expedited (overtime,
partial shipments, dedicated truck,
Summary Schedules air freight, etc.). Establish time and
cost implications and report to the
Independently provided Summary owner.
Schedules are useful in providing an
overview of a Bid Package or the entire 3. Look for interim solutions that will
project. Quickly produced on the project keep the job going until the specified
computers, we can show actual vs. item arrives. Temporary windows,
scheduled progress, as well as recovery rented generators, trucked water,
plan options. The Summary Schedules etc., are the kinds of stopgap
do not replace Master Project measures that can sometimes work.
Schedules but serve as a convenient
format for reporting current status and If the material cannot be expedited and
studying alternatives. a delay occurs because of its late
delivery, we would then work with the
Summary Reports GO and Sub to develop a recovery
plan, if possible, to regain lost time.
Summary Reports present the schedule
and cost status of the entire project, Throughout this process, careful
including bid package projections, in a attention will be paid to liability for delay
quick to read, graphic format. and any costs associated with
Relationship of schedule, progress and acceleration or recovery plans will be
cost bars to each other illustrate the assessed to the responsible parties.
activity of each Bid Package. Numerical
data provides specifics for each Bid FINANCIAL
Package as well as overall project. FORECASTING/REPORTING

Material Expediting Reporting

Our management systems provide The owner may incur financial


constant oversight of material status. obligations from a number of different
There are times when a supplier is directions: construction contracts,
unable to meet its delivery obligations procurement, the Architect, Project
for a material, product or item of Manager (PM), Architect, Engineer (AK)
equipment. This can happen in spite of and Construction Management (CM)
well thought out procurement schedules fees, special consultants, security
and close monitoring by the CM. services, institutional guarding, utility
companies, etc.
When faced with material delays, we
will take the following steps. While this information is collected and
reported on, we would provide the
1. Work with Contractors, and the overall financial summary of the project
Architect to determine if an alternate with one report.
source is available. Establish time
and cost implications and report to The CM's report can be further
the owner. expanded to cover the payment
histories of the AE and CM, similar to
the way this information is tracked for
the construction contracts. With this as a comprehensive record of events
more comprehensive base of financial leading to changes or claims.
data in hand, we are now in a position
to more accurately forecast overall 2. Within the Log is a Contingency
project costs. Report showing the contingency
balance. The difference between the
Forecasting contingency balance and the pricing
column total is printed out as the
Accurate forecasting relies upon timely projected contingency balance.
accumulation of accurate cost and
progress data as well as the CM's 3. The log itself contains all the
judgment to take into account such information needed in the Monthly
factors as weather, quality of contract Report and via the computer can be
documents, contractor's strategies, transferred to the proper page. If a
project complexity, and other factors separate Claims Log is needed, we
when projecting final costs. will print that column, etc. If a
Contingency Report for all projects
EVALUATION, PROCESSING AND by bid pack is needed, we will also
RESOLUTION OF CHANGES, print that.
REQUEST FOR CHANGE ORDERS,
CLARIFICATIONS, DISPUTES AND 4. Of importance is the fact that
CLAIMS. every change has an impact; some
in dollars; some in time; and some in
We have had significant experience in both.
the management and resolution of
changes and claims and have managed PROJECT MANAGEMENT SYSTEMS
this process before.
On-site construction management has
Changes can be initiated by the owner, the responsibility to maintain quality of
the architect or by the contractor. We as the, on time, on budget, with the latest
the CM will evaluate the time and technology available. (Gant
money impact, advise the owner of the Chart/Critical Line Construction)
potential change and then
simultaneously request a proposal from DFD ENTERPRISES is familiar with
the contractor for time and dollars. the reporting system required such as:
· Procurement
We estimate the change as the CM so · Project Cost Accounting
that when the two are compared, · Cost Status Reports
serious negotiations can take place. · Tracking Reports
Normally these changes are agreed to · Change Orders
after negotiation. Should there be Time and Dollars
disputes or claims, we clearly and
objectively define the issues and make Cost Control
a recommendation to the owner.
DFD ENTERPRISES is using
1. Any change, by anybody, is customized Excel software which is
monitored through the system until it used to track costs on a real time basis.
becomes a Proposed Change The data base is kept current by our
Order/Change Order (PCO/CO) or chief estimator.
Claim. We suggest this tracking log
Value Engineering
then issued to all attendees for
If we see a better more efficient way to acknowledgment.
do something, we will, with good
judgment and sound analysis bring it to DFD ENTERPRISES utilizes current
the owner's attention. The years of updated versions of all software for
senior level experience within DFD communications, accounting and
ENTERPRISES provides an extensive forecasting the project.
base of knowledge.
PROJECT MANUAL FOR LARGE
Value Engineering will be an ongoing CONSTRUCTION PROJECTS
effort to be effectively utilized to
produce a quality facility for least cost A Project Manual can be written
and time. specifically for each project. We
propose that it be compiled into two
Estimates: parts.

DFD ENTERPRISES will provide The first will cover the procedures to be
quality estimates at the same time they used when members of the project
are presented to the contractor. In this team (Owner, PM, AK, CM and SubC's)
way meaningful negotiations can take interface with each other.
place to arrive at the best price for the
scope of work involved. E.g. when contractors interface with the
AK, what specific procedures they must
Most claims in today's construction employ when submitting shop drawings.
market are about "time." It is the most This part of the manual will be
elusive element in the field, which must distributed to the project team.
be defined at the time delays occur.
Every effort must be made to resolve The second part of the manual is
change orders for time and money. intended for CM in-house use only. It
will cover the internal policies and
Schedules must be current and tracked procedures associated with the work at
with every construction impact. We are the project site and supplements part
keenly aware of how "time" later one. We see these manuals as working
becomes cost dollars. tools, which expand, and change.

Project Reports: The written portions of each manual


will cover anything not addressed by
Daily Site Reports - provided by field the examples. Neither manual will be
managers and engineers written until the contents of the
Agreements between the Owner and
Meetings - All recorded and transcribed the balance of the project team have
as soon as the meeting has concluded,
been established