Вы находитесь на странице: 1из 3

SmartWell Completion System Installation Halliburton WellDynamics SmartWell completion systems offer oil and gas producers a systems

s approach for completing a well to provide active management of the reservoir. Through continuous readout data acquisition and remote control, the operator has the ability to monitor and control flow from or injection into multiple zones within real time. Producers can reconfigure a well s architecture at will and acquire real-time data without well intervention. Recent Technical Papers on Completion Technology Number Description WHOC 2009-386 Method of Minimizing Liner Expansion Issues in Horizontal Thermal Applicati ons, Travis Cavender, Halliburton OTC 21057-MS Upper Completion Advanced Designs: Sp acing-Out Production Tubing in Subsea Wells, Marshall N. Smith, Troy Bergeron, and Tom Roane, Halliburton TPRB 01-01156-AUC09 Design of an Expandable Base Pipe Using a Genetic Algori thm-Based Multi-Objective Optimization Method, A. Zhong, J. Gano, D. Chen IC-AI 2008 Backpropagation Through Time For General Dynamic Networks, Orlando De Jesus and Ma rtin T. Hagan TPRB 01-01085 Fluid Structure Interaction in Flow-Induced Sealing in Wellhead Iso lation Tool, Allan Zhong TPRB 01-01084 Low Temp Sealability of O-Rings for Oil and Gas Production: Part 1 of 2, Buc Slay, Kent Farrow SPE 125788 Openhole ICD Completion with Fracture Isolation in a Horizontal Slimhole Well: Ca se Study, Dustin Young, Mohammed Al-Muraidhef, and Peter E. Smith, Halliburton, and Mohammad Zaki Awang, Saudi Aramco SPE 124396 New Liner-Hanger Technology Improves Safety and Reduc es Non-Productive Time in Deviated High-Temperature Wells in South Central Venezuela, Cesar Jimenez, Simon Soto, and Andrehny Leon, Petroleos de Venezuela, S.A. (PDVSA), and Pedro Marval, and Martin Schoener-Scott, Halliburton SPE 124394 Swellable Packers Provide a Brownfield Water Management Solution in Open and Case d Hole Case Histories Including Straddles, Plugs, Slimhole Sidetracks and Testing In Corroded Casing, Khaled M.M. Al Douseri, SPE, ADCO, and Chris Barnes, SPE, Dustin Young, SPE, and Peter E. Smith, SPE, Hallibu rton SPE 124391 Expandable Liner Hanger Drillin Capability Provides Reliable Solution for North Sea Case History, Carlos Mario Montanez and Soren Lundgren Jensen, M?rsk Olie og Gas AS (Maersk Oil), and Daniel De Clute-Melancon,

Halliburton SPE 124389 Critical Data Needs for Design of Frac-Pack Completions in Today's Oilfield Envir onment, Bernardo Moreno and Garner Haydell, Halliburton, and Leigh Landry, Murphy Exploration and Production SPE 124385 Swellable Packers in Unique Horizontal Completions Solve Dif ficult Challenges in Offshore India Vasai East Field, Tejas Kalyani, Halliburton, and Ram Avtar, A.K. Srivastava, Ram Suresh Singh, an d D.Z. Badwaik, Oil and Natural Gas Corporation, Ltd. SPE 122765 World's First Reverse-Port Uphill Openhole Gravel Pack with Swellable Packers, Rene Jansen, Bengi Koksaloglu, Philip Holweg, and Riehdwan Hamedi, Brunei Shell Petroleum Co. Sdn. Bhd., and Ma rk Dawson, Bryan Chay, David Mok, and Razien Ali, Halliburton SPE 121741 Case History: Unique Method Using Hy draulic Work Over Unit for Snubbing Operations Successfully Deploys Expandable Liner Hangers into Gas Storage Wells, Nicolas Gregoire, Fluxys; Yves R icaud, Geostock; and Wim Bossewinkel, Dan De Clute-Melancon, Bert De Vries, and Marc Van Wonderen, Hallib urton SPE 118387 Case Histories Implementation of New Liner Hanger Technology in South Central Venezuela Significantly Improves Operations in Complex Wells, Cesar Jimenez, Simon Soto, and Andrehny Leon, Petroleos de Venezuela, S.A. (PDVSA), Marcelo Batocchio, Pedro Marval, and Martin Schoener-Scott, Hallib urton SPE 117765 Cooperative Optimization-Based Dimensionality Reduction fo r Advanced Data Mining and Visualization, D. Chen, S. Hamid, M. Dix, J.A. Quirein, L.A. Jacobson, M.T. Hollingsworth, Halliburton SPE 117049 Expandable Liner Hanger System Enhances Liner Installa tions By Providing Viable Solutions That Overcome Deployment And Installation Issues In Low-Pressure Re servoirs, Ajmal Wardak, James Williford, and Mohammed Al-Madlouh, Halliburton SPE 117043 Ensuring Success on an Extended Reach Well: Expandable Liner Hangers and the Use of Advanced Software Modeling, Ajmal Wardak, James Williford, Angus Walker, Halliburton; and Faisal Nughaimish, Ogacheko Atanu, and Hatem Al-Saggaf, Saudi Aramco SPE 116913 A Case Study in the Successful Design and Implementation of Frac-Pack Treatments in a Challenging Workover Environment in Malaysia, M. Mohamad Bakri and S. Shamsuddin, ExxonMobil E&P Malay sia Inc.; I. Pathamanthan, J. Lim and V. Selvi, Halliburton Energy Services SPE 116261 Development of an Expandable Liner Hanger with Increa sed Annular Flow Area, Tance Jackson, Brock Watson, Halliburton; Larry Moran, Conoco Phillips Company SPE 116256 Design Methodology for Swellable Elastomer Packers in Fr

acturing Operations, Rutger Evers, Dustin Young, Greg Vargus, and Kristian Solhaug, Halliburton SPE 116245 Evolution of Single-Trip Multiple-Zone Completion Technology: How State-of-the-Ar t New Developments Can Meet Today's Ultra Deepwater Needs, Brad Clarkson, Tommy Grigsby, Colby Ross, Emile Se vadjian, and Bruce Techentien, Halliburton SPE 116221 Extended-Stroke Downhole Power Unit Successfully Pulls Subsea Wellhead Plugs in the Gulf of Mexico, Dennis McDaniel, SPE, and John Cromb, SPE, Anadarko Petroleum Corporation; Jim Walton, HTK Consultants, Inc.; and Jack Clemens, Darrell Moore, and Jeff Huggins, Halliburton SPE 116210 Corroded Casing: Testing of Sealing Capability and Retr ievability of a Swellable Elastomer Packer, Emmanuel Pradie, SPE, Total E&P Qatar; M. Rushdan Jaafar, Qatar Petroleum; and Chris Barn es, SPE, Geir Gjelstad, and

Вам также может понравиться