S. C. Natu, Sr. Vice President, Green Power Division, MITCON Consultancy Services Ltd., Pune, India 1. Introduction
Indian sugar mills, both in the private and co-operative / joint sectors, have acknowledged importance of implementing high efficiency grid connected cogen power plants for generating exportable surplus. In fact, additional revenue stream by sale of exportable power to State Electricity Boards (or third party customers), has become the only way for achieving long term sustainability, given the fiercely competitive domestic and international sugar markets.
2. Potential
The potential from about 575 operating sugar mills spread over 9 major States has been identified at 3,500 MW of surplus power by using bagasse as the renewable source of energy. The project involves employment of extra high-pressure boiler configurations of 67 kg/cm2 or 87 kg/cm2 or 105 kg/cm2 (against the conventional 32 kg/cm2 or 42 kg/cm2 pressure boilers used in the sugar mills). Sugar mills conventionally cogenerate their own requirements of steam and power during the season operation of 150-200 days by using bagasse, the residue of sugarcane generated after crushing. They, however, use a number of low-pressure inefficient boilers for the purpose and consume/waste the entire bagasse during their season operations. Over the years, due to the expansion and diversification of sugar mills, their energy needs, both during season and off-season, have multiplied. They often require high-cost grid power and additional fuels both during season and off-season. The high-efficiency cogeneration design not only uses the available bagasse efficiently, but also yields substantial quantities of power for exporting to the grid, over and above their enhanced energy needs. Improved energy efficiency of sugar mill operations to a maximum possible extent is a pre-requisite for building high-efficiency grid-connected cogeneration power plants. Reduced captive steam and power consumptions enhance bagasse availability for extra power generation and for extending their period of operation beyond the crushing season. The potential of 3,500 MW can be easily increased to over 5,000 MW by employing equipment and systems for reduction of steam and power in sugar processes (from present 50-52% steam on cane and 22 units of electricity per tonne of cane crushed to 42-45% steam on cane and 16 units of electricity per tonne of cane crushed), as well as for the manufacture of by-products. The following table gives the state-wise potential for existing conventional and energy-efficient sugar mills in India: Sr. no. State Potential for Exportable Surplus, MW Conventional EnergySugar Mills efficient Sugar Mills
1. 2. 3.
4. 5. 6. 7. 8. 9.
Karnataka Andhra Pradesh Bihar Gujarat Punjab Haryana & others Total
Source : MNES Annual Report 2003 & Estimates from MITCON Cane trash and other agri / forest waste based biomass resources or even conventional fuels to some extent, help sugar mills operate their cogeneration plants for over 300 days, thereby improving their commercial viability.
3. Achievements
Against this potential, the achievements as of December, 2004 cumulate to 432.53 MW from 56 projects. Additional capacity of about 322.97 MW from 36 projects in various stages of construction. Thus, a total of 92 projects, commissioned or under construction, have demonstrated techno-commercial viability. These projects vary in size from 5 MW to 40 MW and mainly use bagasse as fuel with biomass and conventional fuels like coal. On account of substantial efforts by MNES, bilateral agencies, financial institutions and others, the achievement of 8% of the potential has actually been realized, with another 7% under construction. The barriers for accelerated development of this sector include lack of a sustainable and conducive policy and regulatory framework, innovative financing mechanisms, high risks of fuel linkage, and inadequate capacity.
Partnership Initiative for promotion across the country, guidelines for States for purchase of exportable surplus, promotional efforts for conducive policy/regulatory framework development, capacity building and awareness, and fiscal support for SNAs, industry associations, consultants, etc. (Refer Appendix I for details).
All the above initiatives were updated/revised every year, to suit the market requirements and status of commercialization. The Ministry is likely to announce a back-ended capital subsidy scheme for these projects for the new financial year 2005-06, with lower/reducing levels of capital grants. United States Agency for Industrial Development (USAID), through its innovative capital grant scheme for nine select bagasse cogeneration projects in the private sector during 1997-2002, as well as through specific technical assistance and capacity building programs in this sector, has also contributed significantly. United Nations Development Program (UNDP), along with the Government of India, has recently cleared an innovative project in this sector named Removal of Barriers to Biomass Power Generation in India. This project is expected to get operationalized in this year. Successful implementation of various activities under this project are expected to accelerate the growth. Under this project, one bagasse cogen project on IPP mode at co-operative sugar mill will be supported. State Nodal Agencies, particularly with predominant sugar mills and biomass resources, have also contributed to the development of this sector in their States, through specific programs and activities using available incentives from MNES. A host of other fiscal and promotional incentives from the Government of India and many States include accelerated depreciation, income tax holidays, concessions and exemption on customs/excise duties, direct/indirect taxes, sales tax, etc. The Electricity Bill 2003 duly enacted by the Indian Parliament and its conducive provisions for renewable energy thereof, will provide further impetus to harness maximum potential from this sector.
5. Financing
The Indian Renewable Energy Development Agency Ltd. (IREDA), a Government of India enterprise and the lending arm of MNES, has provided promotional/development finance for harnessing biomass energy in India over the last 10-12 years. IREDA has made a major contribution in the development and commercialization of bagasse cogen projects at sugar mills and other biomass power plants in India (refer IREDA web site http://iredaltd.com for the prevailing lending norms for bagasse cogen and biomass power projects). Of late, a number of other financial institutions such as Housing & Urban Development Corporation Ltd. (HUDCO), Rural Electrification Corporation of India Ltd. (REC), Power Finance Corporation Ltd. (PFC), Industrial Credit & Investment Corporation of India Ltd. (ICICI) at the Central level, and nationalized banks at decentralized locations, have come forward to provide term loan finance to this sector, at attractive lending terms.
Decentralized power from renewable sources, thereby reducing huge transmission and distribution losses Optimum resource utilization and reduction of oil imports Socio-economic benefits to rural populace Significant benefits with improved quality, reliability of power in rural areas Emission reduction and subsequent environmental benefits Low gestation period and capital cost (respectively 16-24 months from financial closure and Rs 30-40 million/MW of installed capacity)
With the above key benefits, these projects provide truly win-win situation for all the stakeholders, the producers, utilities and consumers. Awareness amongst utilities and consumers regarding the benefits is still limited.
7. Key Barriers
For accelerated growth of the bagasse cogen sector in India, the following key barriers have come to fore: Non-availability of a level-playing field and sustainable policy and regulatory framework regime across different sugar producing States. Inadequate capacity building of sugar mills, project promoters, financial institutions, SEBs, regulators and other stakeholders. Inadequate information dissemination Lack of business, commercial and institutional mechanisms at decentralized locations
policy and regulatory framework across the country. Appendix II provides the policy framework of various States as of March 2005, indicating major variations. It is hoped that policy makers and regulators will take a quick and fair view and come out with a long-term and conducive tariff regime for this sector.
Ownership structure Project location Year of commissioning Installed capacity, MW No. of days of operation per year, no. Captive MW Season consumption,
: : : : :
: : Off-season Exportable surplus capacity, MW (million kWh) : Season : Off-season : Total No. of units exported since commissioning, million kWh Types of biomass utilized : :
5.66 2.10
12.34 (48.87) 21.20 (61.05) 15.88 (109.92) 103.50 Mill bagasse, procured bagasse, cane trash, groundnut shells and imported coal
Technology configuration
Rankine cycle, multi-fuel fired boiler with 87 kg/cm2 pressure & 515C temperature and matching extractioncum-condensing TG set Total 60 (15 engineering and 45 skilled labourers) 768.00
: :
Case Study II Company address name & : M/s. SCM Sugars Limited 3-5-821, Flat No. 104 1st Floor, Doshi Ford Building Hyderguda, Hyderabad 560 029 Andhra Pradesh Private limited company S C M Sugars Ltd. Koppa Village 571 425 Tehsil Maddur, Dist. Mandya Karnataka State June, 2004 26.00 330 (200 season days & 130 offseason days)
: :
Year of commissioning Installed capacity, MW No. of days of operation per year, no. Captive consumption, MW Season
: : :
: : Off-season Exportable surplus capacity, MW (Million Kwh) : Season : Off season : Total No. of units exported since commissioning, million kWh Types of biomass utilized : :
6.25 2.30
14.40 (66.53) 20.70 (64.58) 16.88 (131.11) 85.40 Mill bagasse, procured bagasse, wood chips, cane trash and imported coal
Technology configuration
Rankine cycle, multi-fuel fired boiler with 87 kg/cm2 pressure & 515C temperature and matching extractioncum-condensing TG set Total 60 (15 engineering and 45 skilled labourers) 832.00
: :
Case Study III Company address name & : Shree Doodhganga Krishna Sahakari Sakkare Karkhane Niyamit Chikodi-591247 Dist Belgaum, Karnataka Co-operative society Same as above March, 2004 20.00 320 (180 season days & 140 offseason days)
Ownership structure Project location Year of commissioning Installed capacity, MW No. of days of operation per year, no. Captive MW Season consumption,
: : : : :
: : Off season Exportable surplus capacity, MW (million kWh) : Season : Off-season : Total No. of units exported since commissioning, million Kwh Types of biomass utilized Technology configuration : : :
5.60 2.00
10.40 (41.18) 18.00 (60.48) 13.73 (101.66) 75.00 Mill bagasse, procured bagasse and cane trash Rankine cycle, multi-fuel fired boiler with 67 kg/cm2 pressure & 495C temperature and matching extractioncum-condensing TG set
: :
13. Conclusions
Bagasse based cogeneration of power in India has come to a take-off stage. The lessons learned during the last decade have been extremely useful for achieving accelerated growth in the near future. The enactment of the Electricity Bill 2003 and its early adoption by different States will ensure a desired level-playing field and sustainable policy regime. The upcoming initiatives from the Government of India, and innovative financial mechanisms, including trade of emission reductions from these projects under the Clean Development Mechanism (CDM) of the Kyoto Protocol, are expected to remove the barriers for accelerated growth of this sector in India. Internationally, financing, technology transfer and project development opportunities, as well as trade of emission reductions will have immense business potential. Due to inadequacy of capital with the Indian promoters, particularly in the cooperative sugar mill sector, excellent potential for international independent power producers, investors and promoters exists for investing in these projects in India. Apart from setting up high efficiency cogen power plants adjacent to the sugar mills, the promoters can also invest in modernization of the sugar mills. The CERs from such projects can be sourced by international emission reduction buyers for meeting their targets under the Kyoto Protocol during 2008-12 period.
energy, biomass/cogeneration power plants, captive power plants and emission reduction trade under CDM of the Kyoto Protocol. He is a mechanical engineer and cost accountant by profession, is 45 years of age, and has been working with MITCON since 1984. He also acts as Member Secretary, Cogeneration Association of India, and Vice Chairman, World Alliance for Decentralized Energy (WADE), UK. MITCON Consultancy Services Ltd. is an ISO 9001 and dividend paying company promoted by Indias major financial institutions, public commercial banks and State Corporations of Maharashtra. MITCON works in diverse areas of consultancy services in energy and environment or green power, agri business, market research, entrepreneurship development, IT education & training. Visit MITCONs web site at www.mitconindia.com for details. The Green Power Division of MITCON headed by the author provides a diverse range of consultancy services both at the micro and macro levels, ranging from energy audits, renewable energy, biomass / cogeneration / captive power, to environment and climate change. The micro level consultancy services for biomass / bagasse cogeneration includes concept to commissioning services and MITCON has provided these services to various plants equivalent to 200 MW for commissioned projects and 1,000 MW equivalent projects under construction. The unit level services include preinvestment consultancy, pre-contract engineering consultancy and postcontract project management services. MITCON also works hand-in-hand with MNES as their Program Partner for promotion & development of these projects as well as with financial institutions like IREDA, HUDCO, REC, PFC and bilateral agencies like USAID and UNDP. MITCON bagged the Business Leadership Award for Cogeneration in 2004, awarded by the Solar Energy Society of India, and has been selected as the local implementing agency for the MNES-UNDP-GEF project Removal of Barriers to Biomass Power Generation in India. Appendix I Bagasse/Biomass Based Cogeneration Program Sr. No. 1. Particulars Projects by cooperative/public/ joint sector sugar mills Pressure configuration 40 bar & above 60 bar & above 80 bar & above 100 bar & above 60 bar & above Interest subsidy 3% 4% 5% 6% 2%
2.
Projects in Independent Power Producer (IPP) mode in cooperative/public/joint sector sugar mills
3.
80 bar & above 100 bar & above 60 bar & above 80 bar & above 100 bar & above
3% 4% 1% 2% 3%
(for bagasse cogeneration by cooperative/public sector sugar mills, the floor rates of interest shall not be lower than 6%, otherwise 8% for general category of projects) Source : MNES, New Delhi
Chattisgar h
Pvt.
~~ 4% of energy
~~ Allowed 12 months
Haryana**
Pvt.
6-12% of energy
Karnataka **
Pvt.
6-12% of energy
Kerala
Pvt.
Rs 2.80 per unit, # escalated at 2% on base Allowed at Rs 2.80 2% per unit, charge on # monthly escalated basis @ at 2% on base tariff @ Rs 2.80 Not per unit, allowed escalated at 5% for five years (2000-01)
50% cost of power evacuatio n line to be borne by Karnataka Power Corporatio n Ltd. (KPTCL)
7% of Allowed energy
MP
Pvt.
Punjab
Pvt.
Rs Allowed per
As to other industry
5 years (01-02)
Rajastha n
Pvt.
Tamil Nadu
Pvt.
2% - 10%
UP**
Pvt.
12.5%* Allowed
@ Rs 2.25 per unit, escalated at 5% (94-95) Allowed @ Rs at 2% 2.73 per charge unit, *** escalated at 5% for 9 years (200001) 24 2.25 per months unit, @ Rs escalated at 5% (99-00)
Allowed
Not allowed
Allowed
(*not allowed for cogen, ** SERC policy announced, *** Rs. 2.48 per unit at 5% escalation for 9 years (2000-01) for off season power generation using coal / lignite (subject to ceiling of 90% of HT tariff, # Govt. order dated June, 03 for biomass only, ## Govt. resolution no. REP-102000-502-B dated Sept. 27, 01, ~~not allowed for cogen. For biomass only., ~notification dated Apr 8, 02) Source : MNES, New Delhi