Вы находитесь на странице: 1из 6

PT CERIA GITA UTAMA

MENARA PALMA LANTAI 12 JL. HR RASUNA SAID BLOK X2 KAV 6 JAKARTA 12950, INDONESIA KRESNA YASHA kresna.yasha@cgu.co.id Phone: +62-21-36363100 FAX: +62-21-36363200 ECS Series - KID3.03 UL: EX4674 Project: PERTAGAS - Mundu File Name: FM200_CalcFlow_Mundu_R01.FLC

Consolidated Report Customer Information


Company Name Address Phone Contact Title : PERTAMINA GAS : Area Jawa Bagian Barat : 0899 9232730 : M. RIZQI m.rizqi@pertamina.com : PML AREA JBB

Project Data
Project Name: PERTAGAS - Mundu Designer: Ariosa Number: Account: Location: Description: Controll Room (Room Area)

Page: 1 of 6 Calculation Date/Time: Wednesday, July 10, 2013, 1:36:03 PM


Copyright (c) Hughes Associates, Inc. Licensed to: Kidde-Fenwal

Consolidated Report Enclosure Information


Elevation: Atmospheric Correction Factor: Enclosure Number: Name: Enclosure Temperature... Minimum: Maximum: Maximum Concentration: Design Concentration... Adjusted: Minimum: Minimum Agent Required: Width: Length: Height: Volume: Non-permeable: Total Volume: Adjusted Agent Required: Number of Nozzles: 0 m (relative to sea level) 1 1 Room Area 20.0 C 20.0 C 6.270 % 6.270 % 6.250 % 82.8 kg 6.74 m 9.00 m 2.80 m 169.85 cubic m 0.00 cubic m 169.85 cubic m 83.0 kg 1

Page: 2 of 6 Calculation Date/Time: Wednesday, July 10, 2013, 1:36:03 PM


Copyright (c) Hughes Associates, Inc. Licensed to: Kidde-Fenwal

Consolidated Report Agent Information

Agent: FM-200 / Propellant N2 (FM-200 is a Trademark of Great Lakes Chemical Corp.) Adjusted Agent Required: Container Name: Container Part Number: Number of Main Containers: Number of Reserve Containers: Manifold: Pipe Take Off Direction: Agent Per Container: Fill Density: Container Empty Weight: Weight, All Containers + Agent: Floor Area Per Container: Floor Loading Per Container: 83.0 kg 142 L Cylinder 90-100350-001 1 0 No Manifold Horizontal 83.0 kg 0.586 kg / l 91.0 kg 174.0 kg 0.13 square m 1338 kg /square m

Pipe Network Part 1 - Pipe


Description Main Cyl. X 1 Flex Hose Pipe Pipe Pipe Pipe/E1-N1 Start 0 1 2 3 4 5 End 1 2 3 4 5 6 40T 40T 40T 40T Type Diameter 50 mm 50 mm 40 mm 40 mm 40 mm 40 mm Pipe Length 1.30 m 0.79 m 1.17 m 4.40 m 1.50 m 0.20 m Elevation 1.30 m 0.48 m 1.17 m 0.00 m 0.00 m -0.20 m

Part 2 - Equivalent Length


Start 0 1 End 1 2 90 0 1 45 0 0 Thru 0 0 Side Union Other 0 0 0 0 50mm Flx 90 Added 0.00 m 0.00 m Total 15.24 m 4.57 m

Page: 3 of 6 Calculation Date/Time: Wednesday, July 10, 2013, 1:36:03 PM


Copyright (c) Hughes Associates, Inc. Licensed to: Kidde-Fenwal

Consolidated Report Part 2 - Equivalent Length


Start 2 3 4 5 End 3 4 5 6 90 0 1 1 1 45 0 0 0 0 Thru 0 0 0 0 Side Union Other 0 0 0 0 0 0 0 0 Added 0.00 m 0.00 m 0.00 m 0.00 m Total 1.16 m 5.70 m 2.80 m 1.52 m

Part 3 - Nozzles
Start 0 1 2 3 4 5 End 1 2 3 4 5 6 Flow 83.0 kg 83.0 kg 83.0 kg 83.0 kg 83.0 kg 83.0 kg E1-N1 40 mm 360 519.55 square mm Name Size Type Nozzle Area

Parts Information

Total Agent Required: 83.0 kg Container Name: 142 L Cylinder (Part: 90-100350-001) Number Of Containers: 1 Nozzle E1-N1 Pipe: Type 360 Type 40T Nozzle Area 519.55 square mm Diameter 40 mm Part Number 90-194027-358 Length 7.27 m

'Other' Items: 1 - 50mm Flex Hose - 90 Bend (Part: 283899) List of 90 degree elbows: 3 - 40 mm

System Acceptance

Page: 4 of 6 Calculation Date/Time: Wednesday, July 10, 2013, 1:36:03 PM


Copyright (c) Hughes Associates, Inc. Licensed to: Kidde-Fenwal

Consolidated Report
System Discharge Time: 8.9 seconds Percent Agent In Pipe: 23.8% Percent Agent Before First Tee: 0.0% Enclosure Number: 1 Enclosure Name: Room Area Minimum Design Concentration: Adjusted Design Concentration: Predicted Concentration: Maximum Expected Agent Concentration: Minimum Agent Required 82.8 kg 6.250% 6.270% 6.270% 6.270% (At 20.0 C) Predicted Agent Delivered 83.0 kg Nozzle Pressure (Average) 13.714 bar

Nozzle E1-N1

Adjusted Agent Required 83.0 kg

Standard Isometric View

Page: 5 of 6 Calculation Date/Time: Wednesday, July 10, 2013, 1:36:03 PM


Copyright (c) Hughes Associates, Inc. Licensed to: Kidde-Fenwal

Consolidated Report
Standard Plan View

Standard Elevation View

Page: 6 of 6 Calculation Date/Time: Wednesday, July 10, 2013, 1:36:03 PM


Copyright (c) Hughes Associates, Inc. Licensed to: Kidde-Fenwal

Вам также может понравиться