Академический Документы
Профессиональный Документы
Культура Документы
WELL CONTROL - Surface BOPs - Wait & Weight Pump Output, bbl/stroke? = MD of Well, ft? = TVD of Well, ft? = Bit or Hole Size, in? = Depth Casing Set, ft? = ... Casing ID, in? = Length of Drill Pipe, ft? = ... Drill Pipe OD, in? = ... Drill Pipe ID, in? = Length of HWDP, ft? = ... HWDP OD, in? = ... HWDP ID, in? = ... Drill Collars OD, in? = ... Drill Collars ID, in? = Current Mud Weight, ppg? = Slow Pump Pressure? = Shut-in Drill Pipe Pressure, (SIDPP)? = Shut-in Casing Pressure, (SICP)? = Pit Gain, bbls? =
KILL CALCULATIONS
Drilling Application
ASSORTMENT of MINI APPS ASSORTMENT of MINI-APPLICATIONS
FIND THE LENGTH FOR A BALANCE PLUG
0.0615 11,131 11,020 6.5 10,405 6.853 9,675 4 3.34 1,457 3.5 2.25 4.75 2.25 12.3 320 50 70 1 12.4 370 323 1,821 5,476 7,298 34 0.98 342
Hole Size, in? = DP OD, in? = DP ID, in? = Sacks of Cement to Use? = Yield/Sx, ft? = Depth Bottom of Plug, ft? =
SOLUTION
Plug Height or Length Depth to Top of Plug Water Ratio Barrels to Displace or Balance Plug
Air Gap (RKB to Water), ft? = Water Depth, ft? = TVD of Hole, ft? = Current Mud Weight, ppg? = Weight of Sea Water, ppg? = Mud Weight For Required BHP
FIND A NEW TVD
Mud Weight to Kill Initial Circulating Pressure Final Circulating Pressure STKS - Kill Mud Surface to Bit STKS - Kill Mud Bit to Surface STKS - Full Circulation Estimated Length of Kick, ft Estimated Density of Kick Material, ppg Estimated Max Casing Pressure for a Gas Kick
DIFFERENTIAL TEST LINER TOP
Angle Last Survey? = MD Last Survey? = TVD Last Survey? = MD For New TVD? = Result New TVD
FIND A NEW MD
TVD
MD
Top of Liner, TVD? = Mud Weight, ppg? = Differential Test Pressure, psi? = Drill Pipe ID, in? = TVD Length of Mud in Drill Pipe, ft Volume Mud to Fill Drill Pipe, bbls Differential Test PSI in EMW, ppg
Angle Last Survey? = TVD Last Survey? = MD Last Survey? = TVD For New MD? = Result New MD
MD
TVD
Formation Pressure, psi? = Amount of Underbalance PSI to Perforate, psi Density of Fluid For Cushion, ppg Tubing or Workstring Capacity, bbl/ft? = Water Cushion, bbls
REQUIREMENTS TO MIX KCL
Amount of Underbalance, psi? = Amount of Nitrogen Cushion, psi? = Weight of Fluid in Hole, ppg? = BHP or Formation Pressure of Zone, ppg? = TVD of Zone, ft? = *TVD length of fluid column to displace with N2
AVERAGE HOLE SIZE
Total Volume to Build, bbls? = Weight of Base Fluid, ppg? = % KCl Required, (1-10)? = Pounds of KCL in One Sack? = Sacks of KCl Required
BUOYANCY EFFECT ON BHA
Volume of interval from Caliper Log, ft3? = Length of Interval, ft? = Average Hole Size, in
TEMPERATURE CONVERSION
Mud Weight in Use, ppg? = Weight of BHA in Air, Lbs? = Weight of BHA in Mud*,lbs Max Available Weight to Run on Bit*,lbs
100 32 212 0
Bit Size, in? = OD of Casing Coupling, in? = Minimum Drill Collar Size*,in
CAPACITY OF RECTANGULAR MUD PIT
1. Support 20K to 35K string weight. 2. Shouldn't pump off with the string weight it supports. 3. Have a drill-off rate between 1' and 5' per minute.
Length of Pit, ft? = Width of Pit, ft? = Barrel per Inch of Depth of Fluid
12 15 2.7
References: Halliburton Cementing Handbook, Baker Oil Tools Handbook, *DRILCO Drilling Assembly Handbook and WCS Well Control School Manual
THE END