BILL NO.

2 SITE DEVELOPMENT

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS EXCAVATION AND EARTHWORK Filling over site in making up levels generally including hauling from stockpile or the like, compaction, embankments, special contouring, clearing of deleterious materials as shown on drawings and specification 01 Selected fill from excavations or imported fill material (as per Engineer's approved) in building up levels to formation subgrade of beds, pavements, landscaping and the like Work on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere. PAVING AND SURFACING 02 Precast concrete pavers size 400 x400x60 mm (type Aand B) gray and light gray color shotblasted on slab inclduing light weight concrete water proof membrane and cement mortar bed as per detail 2 on drawing XL-03and specifications Precast concrete pavers size 400 x400x60 mm (typ E Aand D) beige and light beige color shotblasted on slab inclduing light weight concrete water proof membrane and cement mortar bed as per detail 3 on drawing XL-03and specifications Granite band tiles pavers size 400 x400x30 mm black absolute flamed on slab inclduing light weight concrete water proof membrane and cement mortar bed as per detail 3 on drawing XL-03and specifications 400 x400 mm pavers tiles 19 mm thick single pane tempered safety clear glass on stainless steel including finishing and( led light measured elsewhere) as per detail 1 on drawing XL-03

2865

Note

1890

03

1385

04

310

05

194

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 1 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS CURBS AND EDGING 01 Precast concrete mowing edge 250x200 mm as per detail 9 on drawing XL-03 and specification Ditto, but to suit roof garden LITTER BINS 03 Litter bins fiberglass colored as per detail 8 on drawing XL-03 and specifications CONCRETE SEATS AS PER DRAWING XL-03 04 600mm wide cast in plase concrete bench with local sand stone, including rolled edge finishing and( led iluminated recessed light measured elsewhere) as per detail 7 on drawing XL-03 SITE FITTINGS OUT DOOR HANDRAIL 05 Out door handrail as per detail shown on drawing WALL FENCE (CMU) 06 200mm CMU fence wall to suit required locations including , columns, masonry, stone cladding to suit fence wall, finishing as per detail on drawing XL-01 PLANTERS ABOVE CEILING 07 Planters above ceiling comprising precast concrete edging size 300x200 mm including finishing, water proofing membrane, aqua drain drainage composites 25 mm, geo textile filter fabric and all associated works as per detail 10 shown on drawing XL-03

390

02

387

No.

No.

21

135

40

M2

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 2 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS CONCRETE RAISED PLANTERS Brick wall raised planters with stone faced including footings , finishing, masonry, stone cladding, copping, water proof membrane and all associated works as per detail 6 shown on drawing XL-03 01 02 Brick wall raised planters with stone faced type A Brick wall raised planters with stone faced type B SUNDRIES Fountain including Concrete wall and base glazed tiles finish inside, , cement mortar setting bed, 40mm thick coping, water proofing and mositure barrier, fountain kit, supply and drainage pipework, fountain pump, electrical power and lighting, installation, metal grille and all associated works including builder's work and service installation as per details on draiwng of LS and PG no. XL-03, XP-03 03 To suit fountain draiwng XL-03, XP-03 Exhaust/intake air shaft Exhaust/intake air shaft including metal louvers as per detail 5 on drawing XL-03 04 05 Metal louvers case (A) Metal louvers case (B)

78 1057

M M

No.

3 1

No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 3 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS LANDSCAPING Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule on drawings as per specification GROUND COVER 01 02 03 G/Zp G/Sc G/Gr SUCCULENTS 04 Sc/Ac Lawn planting including soil planting, mix, filter membrane, drainage layer and waterproofing membrane where required as per details and planting schedule on drawing and specification 05 L/Cd

168 150 1084

No. No. No.

131

No.

2116

M2

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 4 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS DRAINAGE INSTALLATIONS Supply and install and test pipework, UPVC schedule 40, including trench work, fittings and supports as required as shown on drawings and as per specifications section 02730 01 02 03 50 mm dia. 100 mm dia. 150 mm dia. Supply and install and test discharge drainage pipe work UPVC schedule 80, including trench work, fittings and supports as required as shown on drawings and as per specifications section 02730 04 50 mm dia. Soakaway pit including excavation in unclassified ground and filling with 100mm thick graded and base layer 300mm thick gravel course and300 mm thick earth fill topping and all required to complete the work as per drawings, specifications and code of practice 05 Soakaway pit, 300 mm dia.,700 mm deep., ref. (SOK) POTABLE WATER SYSTEM Supply and install and test potable pipework, UPVC schedule 80 including, fittings and supports hot water pipes insulation , excavtion and backfilling as required shown on drawings as per specification section 02668 06 75 mm dia. Accessories 07 Supply & install, 75 mm dia valve chamber Ref. ( VC )

20 25 35

M M M

30

No.

30

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 5 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS FIRE WATER SYSTEM Supply and install and test pipework UPVC schedule 80 including fitting and support, excavation and backfilling as required as shown on drawings and as per specificatons section 15300 01 100 mm dia. ACCESSORIES 02 Fire department connection, 2 way fire department inlet connection type, with gate and check valve, 150 mm dia. Supply and install back flow preventer assembly (BFPA) 150 mm dia., IRRIGATION SYSTEM Supply and install and test irrigation line pipework, UPVC schedule 80, including trenching, backfill, fittings and supports as required as shown on drawings and as per specifications section 02810 04 05 06 07 08 50 mm dia 40 mm dia 32 mm dia 25 mm dia 15 mm dia

10

No.

03

No.

55 75 215 20 25

M M M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 6 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS ACCESSORIES 01 Supply and installation irrigation controller as detailed on drwings and as per specifications section 02810 Supply and installation bubbler for shrubs, ground cover and succulents Supply and installation spray lawn sprinkler Supply & install, 40 mm dia valve chamber Ref. ( VC ) Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 05 06 Ref. RCVS-01, 02 , 03 Ref. RCV-04,05 ,06 ,07

No.

02

481

No.

03 04

9 1

No. No.

3 4

No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 7 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS ELECTRICAL UTILITIES Generally The building contractor shall coordinate with infrastrcuture contractor for connecting ,operating and testing all electrical works for different internal or external connections between the main buildings and the utility building in the site and all associated works as required to complete works and complete operation for electrical systems in high efficiency as shown on drawings and as described in specifications. Price includes all required cables, wires and all accessoreis as per standards and manufacturer requirements OUTDOOR MAIN AND SUB MAIN POWER Main circuits: 600/1000V XLPE multicore copper cable in conduit or cabe tray or buried in cable trench ( cable tray and trench are measured elsewhere), including tapes, conductors, junction boxes, connection for feeders and various power loads as shown on the single line diagram and cable schedule on drawings and as described in specifications. 01 02 (4C-10mm2-CU/PVC/PVC)+10mm2G/CABLE TRAY (4C-16mm2-CU/XLPE/PVC)+16mm2G/IN GROUND Supply and install lighting and power panel boards including circuit breakers , groundings, fixings and all assocciated works as required and as shown on drawing and as described in specifications Site 03 Ref. SLP (IP-54 ) Pump Rooms 04 Ref. PPF (IP-54 ) To Collection 1 No SR 1 No 5 85 M M

Note

Note

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 8 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS ELECTRICAL UTILITIES OUTDOOR MAIN AND SUB MAIN POWER Supply and install power and lighting accessories including all necessary boxes, plates, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, tapes, connections and associated trenching and backfilling as required to suit the locations shown on drawings required and shown on drawings and as described in specifications Pump Rooms 01 Disconnect switch, non-fused, weatherproof and with pilot light, 20A, 1P, 220V for F.P&S.P Single socket outlet, weatherproof , 15A, 220V, grounding type Single pole one-way switch, weatherproof , (13A)

3 2 1

No No No

02 03

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 9 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS ELECTRICAL UTILITIES OUTDOOR POWER AND LIGHTING Supply, installation, testing and commissioning of outdoor lighting fixtures complete including poles, cables/wires and conduits, trenching work, foundations and all accessories as shown on drawings and as described in specifications section 16050 Site 01 02 03 04 05 06 07 Type (D) Type (OL) Type (W) Type (LC) Type (FB) Type (CC) Outdoor lighting outlet for landscap decortive lighting (glass led light) as per detial 1 on drawing XL-03 Outdoor lighting outlet for landscap decortive lighting (concrete seats led light) as per detial 7 on drawing XL-03 Pump Rooms 09 Type (F2)

14 70 19 12

No. No. No. No.


Item Item Item

1 1 1 1

08

Item

No.

To Collection Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 10 / 13

SR

Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS ELECTRICAL UTILITIES OUTDOOR COMMUNICATION SYSTEMS All outdoor communication systems include pull boxes, connectors, extensions of cables in conduits and all associated works as required and shown on drawings and as described in specifications (system in side each building is measured separately) OUTDOOR DATA AND VOICE SYSTEM 01 Supply and install an outdoor data and voice system system to suit external feeder network OUTDOOR VOICE EVACUATION SYSTEM 02 Supply and install an outdoor evacuation system to suit external feeder network OUTDOOR INTEGRATED SECURITY SYSTEM 03 Supply and install an outdoor integrated security system to suit external feeder

Note

Item

Item

Item

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 11 / 13 Date: MAY 2011


MVMO,EZAM,KHM,GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)- (ISSUED FOR CONSTRUCTION)

Bill. No. 02 SITE DEVELOPMENT

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE WORKS Collection Sheet B1-01 Sheet B1-02 Sheet B1-03 Sheet B1-04 Sheet B1-05 Sheet B1-06 Sheet B1-07 Sheet B1-08 Sheet B1-09 Sheet B1-10 Sheet B1-11

To TENDER SUMMERY Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP B2 - 12 / 13

SR

Date: MAY 2011


MVMO,EZAM,KHM,GMG