Enterprise Structure Tables MRP Controller Production Schedular profile Schdeule Margin key Work Center Person Responsible Factory Callender

Control Keys

A control key uses the following keys and indicators to determine how an operation or a sub-operation is to be processed in a ta

Scheduling :If you set this indicator, the system carries out scheduling for an operation or it determines the earliest or latest dat

Capacity planning: If you set this indicator, the system creates capacity requirement records for the operation or sub-operation

The system only creates capacity requirements if you have set the capacity planning indicator and maintained the correspond
Costing indicator: Use this indicator to specify whether the operation or the sub-operation should be costed. Confirmation: Use this indicator to specify whether and how the operation or sub-operation should be confirmed. Time tickets: Use this indicator to specify that time tickets are printed for the operation or sub-operation. Print operation: Use this indicator to specify that shop papers are printed for the operation or sub-operation.

External processing: Use this indicator to specify that the operation or sub-operation is to be performed by a third party. In this The control key is defined in Customizing for the Work center or for the Routing .

Control Key

Definition

A user-defined key that determines how an operation, phase, or secondary resource is handled in order processing and in produ

Use
You define control keys in Customizing for Master Recipes or Process Orders .

Whenever you create an operation, phase, or secondary resource in the master recipe or process order, you assign a control ke

Structure

The table below describes which settings are included in a control key, and whether these settings are relevant for operations, p For more detailed information on the individual settings in the recipe or order, call up the input help (F4 ) for the control key and Control key: Objects affected by control key settings

Settings for

Operation

Phase

Schedulin g Capacity requireme nts planning Costing Automatic goods receipt Inspection X characteri stics Confirmati on printing X Time ticket printing X Printing (general) External processin g Confirmati on

X X

Secondar y resource X X

X X

X X

X X

eration is to be processed in a task list. Examples of such keys and indictors are:

ermines the earliest or latest dates for a sub-operation. If you do not set this indicator, the system does not schedule the operation or sub-op

r the operation or sub-operation. If you set this indicator for a control key, you must also set the scheduling indicator.

and maintained the corresponding formulas.

uld be costed.

uld be confirmed.

ub-operation.

erformed by a third party. In this case, a purchase requisition is generated during order creation.

in order processing and in product costing.

ss order, you assign a control key to it.

gs are relevant for operations, phases, or secondary resources.

elp ( F4 ) for the control key and then in the Detailed information section choose field help (F1 ) for the relevant indicator.

t schedule the operation or sub-operation, the system automatically sets the duration to zero.

vant indicator.