CUENT: PRIVATE
TENDER DATE: 20., 4. 1992
p r o ~ DeWI8 and Si .. Condition.: 3 storey R. C. frames Contract PAMIISM FORM (WITH QUANTITIES)
constructlonwilh sub-basamenl Metal deck roofing Met brickwaII
construction. located on lat ground. Accessible via main road.
MaJkat Conditions; Competitive
Contract P8rIIcuW8: Competitive Tender wt
e Type of ContIact: PAMIISM FORM (wfth Quantities)
ofTendar
[II
QpanlSelected
of Quantllies Competition
BiBs of Appr. Quant.
0
Negoliatad
Schad. of Ratesl
0
Spec. & Drawings Serial
Contract Period Stip. by CIent: 24 month
Contract Period 0ffanId by Builders: 24 monlh
Number of Tenders Issued: 15
. NumberofTendera Received: 15
rn
0
0
Cost Flucluation: No
Govemment 0
Private Ii]
Provisional Sum $ 320,000.00
Prime Cost Sum $17,010,000.00
PralimNries $ 1,126,000.00
Continganciea $ 1,500,000.00
Contract Sum $46,017,545.26
ANALYSIS OF SINGLE BUILDING ,
$
1. 50,914,475.23
2. 47,931,799.71 .
3. 47,798,247.07
4. 47,353,071.62
5. 46,972,931.75
6. 46,017,545.26
Int (Jv)ll
JV
L
JV
L
L
L
3-storey building plus 1 laval sub-basement carpark with gross Boor area or 31564 ..... It houses
Accommoddon and Dealgn Fealures: mockup Hall, DIning Hal, Auditorium. Lecture Theatre. Amphitheatre, Atrium, Foyers, Ubrary,
Trainee Pool, classrooms, medical room, admInisIraIion ofIices, conference room and other facilillea.
GroundRoor
GroundAoor
UpperFJoor
GROSS FLOOR AREA
UsablaAraa
CiR:Ulation Araa
Ancillary AI8a
'ntamal Division
GROSS FLOOR AREA
8895m2
872Om"
13949mt
31564m
2
13363m
2
5339m"
11623 m"
1239m"
31564m"
Floor Space NOT Enclosed: 2085 m"
Roof Area: 8183 ....
(Structural & Plant Rooms)
$46,017,545.26
$ 320,000.00
. $17,010,000.00
Contract Sum
Provisional Sum
Prime Cost Sum
Preliminaries
Contingencies
$ 1,126,000.00 being 2.59 %
$ 1,500,000.00 being 3.37 %
Contract Sum Ius Contingencies $44,517,545.26
Functional
.y!!!!: 13363 m"{usable area)
External WaR Araa 7807
=--
Gross Floor Araa 31564
Storey HeIghts:
Av. Below. Grd. Floor
At GId. Floor
Above GId. Floor
,. 0.247
3.80 m
4.SOm
4.oom
Percentage of Gross Floor
Araa:
(a) Below GId. Floor -
(b) Single-storey -
(c) 2-storey -
(d)3-saey -
(e) -storey -
Brief Cost Information Functional Unit Costs
of remainder
Contract Sum
excluding ex1arnal works: (Tender $3,193.291 per rn? .
I ____ .r-________________________________________________________________________________ __
,." ,
I OF SURVEYORS, MALAYSIA
""'"'1 BUI .... Q COST INFORMATION CENtRE
,
ee.aENTAL COST ANALYSIS - Fonn 2
7...J:m
.

A-3-31564
SUMMARY OF ELEIENT COSTS
GRClSS FlOOR AREA: 31564 ", TENDER DATE: 20. 4. 1992
PrellmIn.rt. Shown s.p.rateIy
Total Coat Coat,., ... E ........ tUnit Element Unit EI .... ent ReInforce- Fonnwark
Ofe-....t GFA QuantIty Rate Ra1Io ConcreIII ment m
a
$ $ $ ,., ... GFA ... kg
1 SubsIrucIure
1A PiIng 1.490,0'11.30 4721 30594m 48.70 0.969
- -
-
18 Work I3!:!IDw Lowast Aoor 3.176.728.50 100.64 8895 ", 357.14 0282 4678 618<t92 14024
F"..-
GrouP 4,666.745.80 147.85 4678 618<t92 14024
2

2A Fmme 3,835.628.00 121.52 31564mt 121.52 1.000 4015 1199941 44611
?:
2B Upper Floors 1,955.075.30 61.94 22669mt 8624 0.118 3IYl7 480165 19289

Rod 2,913,C102.0I3 92.29 8614 .... 338.17 0273 894 100105 5398
Stais 666,223.35 21.11
- -
- 296 61178 1860
2E ExtemaI Wah 214.733.90 8.70 6168mt 40.59 0214 20 3425 480
2F Windows & ExIemaI Doors 542,921.60 1720 1039mt 522.54 0.033 - - -
2G IntemaI Wah & Partlions 647111320 20.53 19215mt 33.12 O.lJ09 32 1105 916
2H Internal Doors
5&!i ?lIS_70
17.91 1175mt 411.05 0.037
- -
-
Group Element Total Q8 361.20 8284 1852525 72534
3 F"m/shes
3A InIemaI Wall Finishes 950.282.65 30.11 36828mt 25.80 1.161
38 Internal FIaor finishes 3.098.052.85 98.15 29382mt 1OS.44 0.931
3C Intemal Celing FIfIishes 621.701.90 19.70 29219nt 2128 0.926
3D External FInishes

60.63
-
-
_.
Group Element Total G -'Il'.l 17' fin 208.58
..-
4 FiIIing$ and Furnishings 1.172,900.00 37.16
- - -
5 Setvic:es p.e.SUM lENDERED
SA Sanlary AppIiaras 191,311.58 6.06 644 NO 297.08 0.020
SUM

Plumbing InstaIIaIion 1.114.239.35 35.30 -
-
-
Refuse Disposal
- - -
- -
";
Air-Conclliontlg & 3,900.000.00 123.56 857181M3 45.50 2.116 3,900.000.00 5.361,440.00
venllialion System
EfeCDicallrIstaIfation 4,950.000.00 156.82 - - - 4.900,000.00 4.765.000.00
Are PmtecIion Instalation 1.450.000.00 45.94 - - - 1.450.000.00 1.296.000.00
5G lit & Conveyor Instalallon 570.000.00 18.06
- - - 570.000.00 258.000.00
5H Communication InstaIaJion 1,200.000.00 38.02 - - - 1,200.000.00 1.198,200.00
5.J Spec:IaIlnsI8IIaIion 3.990.000.00 126.41 - - - 3,990.000.00 4.0131,500.00
51(
Blilder's Pnft & 321,200.00 10.18 - - - 321.200.00 338,202.80
Allendanc:a on S8IVices
5L 35,000.00 1.11 - - -
Connac:Iicin WiIh Services
Group Element Total 17.721.756.93 561.45
Sub-tolaI &XC. External WOIb
41,545._.41 1.31824
Preliminaries & CcningencIes
6 ExtemaI Works
6A SileWork 998.715.74 31.64
6B Drainage 454.290.76 14.39
6C ExIemaI Services 279.600.88 8.86
60 AncllaIY Buildings 113.089.47 3.58
6E Reaeational Facililes - -
Group Element Total 1.845.676.85 58.47
"".
....
1.1'.H1nnnm 35.67
...
TOTAL (less
1.410.39
Cod
" I 0; OF SURVEYORS. MALAYSIA
,1IILD1NG COST INFORMAnON CENTRE
EI-EMENTAL COST ANALYSIS - Form 3
.
D\iI:J'l' ... '" RI.a nlNn-CI:
A-3-31564
BRIEF SPEClFlCA110N
GROSS A.OOR AREA: 31564 III' TENDER DATE: 20. 4. 1992
ELEMENT SPECIFICATION
1 SubslJUcture
1A PilIng Precast relnforc:ed concrete piles
18 Work Below lowest Floor Reinfon:ed c:oncrelB piIec:aps. ground beam, ground Ioor slab.
Finish
2 Superstructure
2A Frame concrelB frames.
2B Upper Floors Reinforced c:oncreIB suspended stabs.
2C Roof ReinforCed concrelB slab wiSh metal clacking covering on staal roof 1rUSSeS, PVC rainwater downpipes.
20 Stairs Reinforced concrelB stairs finish wi1h tiling. Powder ClO8ted steel handrails and balusters.
2E ExlBmaJ Walls Generally brickwaII.

2F Windows & EDmaI Doors Glazed powder coated aJuminium casement WIndows, frameIess glass entrance doors.
2G htemaI WaRs & Partitions Generally brickwal and gypsum board partitiOns.
2H IR1amaI Doors Generally solid timber doors, glazed panel doors with standard ironmongery. Fire doors to
c:omparImenlaised areas.
3 Finishes
3A In1emaI Wal Finishes GetteraIIy pIasIBr and paint, plastered and acrylic spray coaling. Fu8 high ceramic wall Illes to toilet and
kitchen. Granite slab ID 1ft lobby.
38 Internal Floor FInishes Floor hardener ID carpark. granIe slab to aIrium and layer area. carpet 10 classrooms, audloriurn. offices
etc. Hcmogeneous tiles to lIDiIeIs and other areas.
3C Illtemal Calling Finishes minerai fibre board, fibrous plaster ceiling, asbesIDS free cemenl board and off form wilb
pain1ingfD basement area.
3D EnmtaI Finishes GeheIaIIY shanghai plaster, aIuminiurn perraratad strip ceiling and homoganeous Ioor tiles.
4 and Furnishings Shelves to store and 950 Nos IMta1rea8 sealS, writing board to c:IassnJoms.
5 ServIces
SA Sanitary AppIiIInces local cototWed fitIings and 8CCeS5OIies.
58 PIIImbing lnstaIIaIon Cold and hot water plumbing and sanitary plumbing.
5C Refuse DIsposal
-
50 AIr-Concllionlng & AtI condiIionIng and mechanical ventilation system.
Ventlalon System
Elec:tricallnstallation EIec!ricaI insIaIIalion (l V) & (HV), essential supply generaDr system. Au1Dma1ic sprinkler system, dry riser
system, fire aIam sysIBm. fire extinguisher, fireman intercom system.
SF FIre Protac:llon Installation AUlDmaIic sprinkler systam, dry riser system, tire alarm system. lire extinguisher Iiraman intercom system
5G Lilt & Conveyor Inslallallon 2 Nos. passenger Jill
5H Communication Installation Tetephone installation, PA and fireman inlDrcom.
SJ Spec:ial1nsfaIIaIion Building automation, security system. Kitchen equipment. swimming pool filtration and Audio visual
(eg. kitchen equipment, laundry, speciallighling.
bldg aulDmation, securi\y sys.,
gas Inst.)
SK Builder's Profit & Profit and atIBndance on M & E services.
AtIendenc:e on Services
Sl Builder's Work In R. C. pllnlls to Pot & E rooms. holes and opening for services.
Connection With Services
6 Ex\emaI Works
6A SiteWodc; Site clearance, premix roads and carpark/ng, decorative fencing and mild steel entrance gate hard and
sofIlandscaping.
6B Drainage 300 mm ciamelBr half round sail glazed drain channel on concrete bed wiIh one brickWall as enln
brick sump, culvert, sewer pipes line and manholes.
6C ExIBmaI Services Water rec1icuIallon, electrical and telephone cabling and manholes, lire hydrant. compound /lghUfIIJ,
supply and sewerage pipes connection to main.
.'.
60 Ancillary Buildings Guard house and fire lighlng house.
6E Recreational Facilities
-
'.