Production Rate From Planning Planet Content

No. Item Line No.

1 Architectural Builders Work and Finishes 2 Architectural Builders Work and Finishes 3 Architectural Builders Work and Finishes 4 Architectural Builders Work and Finishes 5 Architectural Builders Work and Finishes 6 Architectural Builders Work and Finishes 7 Architectural Builders Work and Finishes 8 Architectural Builders Work and Finishes 9 Architectural Builders Work and Finishes 10 Architectural Builders Work and Finishes 11 Architectural Builders Work and Finishes 12 Architectural Builders Work and Finishes 13 Architectural Builders Work and Finishes 14 Architectural Builders Work and Finishes 15 Architectural Builders Work and Finishes 16 Bridge Works - Decking 17 Bridge Works - Finishes 18 Bridge Works - Formwork 19 Bridge Works - Paintwork 20 Bridge Works - Structural Steelwork 21 Concrete Works - Concrete Finishing 22 Concrete Works - Concrete Mixing 23 Concrete Works - Concrete Placement 24 Concrete Works - Formwork 25 Concrete Works - Post Tensioning 26 Concrete Works - Pre-Cast Concrete 27 Concrete Works - Reinforcement 28 Concrete Works - Reinforcement Ratios 29 Construction Wet Trades - Blockwork 30 Construction Wet Trades - Brickwork 31 Construction Wet Trades - Plastering

Carpentry Carcassing Carpentry Final Fixing Ceiling Finishes Doors and Windows Fire Protection Floor Finishes Metal Wall Panels Metalwork Painting Partitioning Plasterboard Restoration Works Stonework Wall Finishes Wallpapering

1 12 23 27 33 37 48 51 55 66 77 83 89 100 111 116 118 120 122 124 127 138 149 160 170 173 176 187 194 205 216
1/24

Production Rate From Planning Planet Content


No. Item Line No.

32 Construction Wet Trades - Rendering 33 Construction Wet Trades - Screeding 34 Demolition and Breaking Out - Breaking Out 35 Demolition and Breaking Out - Cutting Back 36 Demolition and Breaking Out - Cutting Chases 37 Demolition and Breaking Out - Cutting Switchboxes 38 Demolition and Breaking Out - Demolition 39 Demolition and Breaking Out - Site Clearance 40 Design Works - Escalators 41 Electrical and Mechanical Installations - Commercial Kitchen 42 Electrical and Mechanical Installations - Electrical System 43 Electrical and Mechanical Installations - Environmental Control 44 Electrical and Mechanical Installations - Escalators 45 Electrical and Mechanical Installations - Fire Services System 46 Electrical and Mechanical Installations - Lift Installation 47 Electrical and Mechanical Installations - Plumbing and Drainage 48 Electrical and Mechanical Installations - Power Supply 49 Foundations and Excavation - Barrette Piles 50 Foundations and Excavation - Basement Excavation 51 Foundations and Excavation - Bell Ground Anchors 52 Foundations and Excavation - Bored Piling 53 Foundations and Excavation - Bulk Excavation 54 Foundations and Excavation - Contigous Piling 55 Foundations and Excavation - Dewatering 56 Foundations and Excavation - Diaphragm Walls 57 Foundations and Excavation - Driven Piles 58 Foundations and Excavation - Excavate and Remove 59 Foundations and Excavation - Ground Compaction 60 Foundations and Excavation - Ground Monitoring 61 Foundations and Excavation - Grouting 62 Foundations and Excavation - Hand Dug Caissons

227 233 241 252 263 274 283 294 304 307 313 324 328 337 341 347 358 369 376 387 391 402 413 415 420 431 435 446 453 455 457
2/24

Production Rate From Planning Planet Content


No. Item Line No.

63 Foundations and Excavation - Mini Piles 64 Foundations and Excavation - Removable Anchors 65 Foundations and Excavation - Secant Piling 66 Foundations and Excavation - Sheet Piling 67 Foundations and Excavation - Site Investigation 68 Foundations and Excavation - Slurry Mix Walls 69 Foundations and Excavation - Small or Deep Excavation 70 Foundations and Excavation - Soil Mix Walls 71 Foundations and Excavation - Spread and Level 72 Foundations and Excavation - Steel Strutting 73 Foundations and Excavation - Trench Excavation 74 Foundations and Excavation - Underpinning 75 Quick Reference - Rule of Thumb 76 Railway Works - Trackwork 77 Roads & External Works - Carpentry & Joinery 78 Roads & External Works - Drainage 79 Roads & External Works - Ducting 80 Roads & External Works - Fencing Works 81 Roads & External Works - Kerbs & Paving 82 Roads & External Works - Land Drains 83 Roads & External Works - Landscaping 84 Roads & External Works - Lighting 85 Roads & External Works - Manholes and Gulleys 86 Roads & External Works - Road Works 87 Roof Structures and Coverings - Curtain Walling 88 Roof Structures and Coverings - Flat and Layered Roofs 89 Roof Structures and Coverings - Metal Decking 90 Roof Structures and Coverings - Rainwater Works 91 Roof Structures and Coverings - Roof Insulation 92 Roof Structures and Coverings - Roof Lights 93 Roof Structures and Coverings - Sheeted Roofs

459 461 465 467 470 476 478 489 491 502 505 516 524 535 546 551 562 564 575 586 596 603 605 616 621 629 635 646 656 660 662
3/24

Production Rate From Planning Planet Content


No. Item Line No.

94 Roof Structures and Coverings - Slates and Tiling 95 Roof Structures and Coverings - Steel Frames 96 Roof Structures and Coverings - Timber Frames 97 Scaffolds and Crainage - Tower Cranes 98 Scaffolds and Crainage - Traffic Decking 99 Scaffolds and Crainage - Working Platforms 100 Structural Frames - Finishes 101 Tunneling - Cut and Cover 102 Tunneling - Medium Ground 103 Tunneling - NATM Tunnels 104 Tunneling - Rock Tunnels 105 Tunneling - Soft Ground 106 Water Engineering - Water Purification 107 Water Engineering - Watercourses 108 Water Engineering - Waterproofing

666 672 677 688 694 696 705 707 709 712 723 728 731 734 737

4/24

Production Rate From Planning Planet


No. Item Task / Description - Carpentry Carcassing Slow Ave Fast Units

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

1 Architectural Builders Work and Finishes

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Windows, Timber Frames for Bricklaying Windows, Drill, Screw & Plug extra over Door Frames, Softwood, 1.0-3.0m2 Door Frames, Softwood, 3.0-7.0m2 Door Frames, Softwood, 7.0-10.0m2 Door Frames, Hardwood, 1.0-3.0m2 Door Frames, Hardwood, 3.0-7.0m2 Door Frames, Hardwood, 7.0-10.0m2 Erect Water Tank Platform Fix Studding For Bath
- Carpentry Final Fixing

1.1 0.3 0.5 1.2 0.6 1.4 0.6 1.3 0.4 0.7 1.6 0.2 0.5 1.2 0.4 1.2
- Ceiling Finishes

0.5 0.1 0.2 0.4 0.8 0.3 0.3 1.0 2.3 0.1 0.4 0.9 0.3 0.5 1.2 0.3 0.4 0.8 0.3 0.6 2.6 0.7 1.2 9.5 2.0 1.3 2.0 1.3 5.0 1.2

0.1 0.3 0.6 0.4 0.7 0.3 0.5 0.2 0.5

hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no no/hr hrs/m hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/n

2 Architectural Builders Work and Finishes

Windows, Softwood, 3.0-7.0m2 Windows, Softwood, 7.0-10.0m2 Windows, Hardwood, 1.0-3.0m2 Windows, Hardwood, 3.0-7.0m2 Windows, Hardwood, 7.0-10.0m2 Windows, Aluminum, 1.0-3.0m2 Windows, Aluminum, 3.0-7.0m2 Windows, Aluminum, 7.0-10.0m2 Windows, Steel, 1.0-3.0m2 Windows, Steel, 3.0-7.0m2

3 Architectural Builders Work and Finishes

1 Suspended Ceilings, office situations 2 Suspended Ceilings, First Fix 3 Suspended Ceilings, Second Fix
4 Architectural Builders Work and Finishes - Doors and Windows

3.5 m2/hr - m2/hr - m2/hr m/hr m2/hr m2/hr m2/hr m2/hr

1 2 3 4 5

Mastic Pointing to Frames Fix Metal and Timber Windows After Wall Complete Window Glazing Window Glazing, Single Glazed Units Window Glazing, Double Glazed Units
- Fire Protection

5 Architectural Builders Work and Finishes

1 Spray Protection to Steelwork 2 Spray Protection to Steelwork

- m2/hr - Tonnes/hr
5/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

3 Sheet Protection
6 Architectural Builders Work and Finishes - Floor Finishes

2.9 - Metal Wall Panels

3.7 3.1 3.6 4.6 1.5 0.8 2.2 2.6 3.1 3.3 1.5 15.0 1.4 0.2 1.5 0.8 14.2 12.5 25.0 1.1 6.7 20.0 1.7 3.1 3.3 2.2 6.2 2.0 1.5 6.1

4.2 m2/hr 5.1 2.2 1.1 2.8 5.0 5.6 2.1 m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr

1 2 3 4 5 6 7 8 9 10

Granolithic Flooring Terrazzo Flooring, in-situ Terrazzo Flooring, pre-cast Mosaic Tiling, 0.045x0.045m Clay, quarry Tiles, small areas, much cutting Clay, quarry Tiles, large areas, little cutting Raised Floor System Linolium/Thermo-Plastic Flooring Thermo-Plastic Floor Tiles Wood Block Flooring, lay blocks

7 Architectural Builders Work and Finishes

1 Sub-Frame Installation, 1.5x0.5m panels 2 VE Panel Installation, 1.5x0.5m panels


8 Architectural Builders Work and Finishes - Metalwork

12.2 1.0 - Painting

17.5 m2/day 1.9 m2/day - no/hr - m/hr - no/day 2.1 3.8 6.8 2.5 2.1 6.7 m2/hr m2/hr m/hr m2/hr m2/hr m/hr m2/hr m2/hr m2/hr m2/hr m/hr m2/hr m2/hr m2/hr
6/26

1 Install Metal Door and Frame 2 Install Balustrade & Railings 3 Install Railings to Staircases
9 Architectural Builders Work and Finishes

1 2 3 4 5 6 7 8 9 10 1 2 3 4

Prepare Walls Prepare Doors Prepare Door Frames Burn Off / Heat Strip Paintwork Internal Timber, 1 coat primer before fixing, generally Internal Timber, 1 coat primer before fixing, timber lengths Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss Internal Timber, touchup primer, 1 undercoat, 1 coat gloss Internal Timber, polyurethane varnish, 2 coats Internal Timber, polyurethane varnish, 3 coats
- Partitioning

5.9 1.6 1.1 5.5

10 Architectural Builders Work and Finishes

Timber Studding Metalwork System (MF) Studding Tape, Joint Sand and Top Coat Plasterboard Skimming to Plasterboards

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105

5 6 7 8 9 10 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5

5mm Hardboard Paneling, excluding studding time 100mm Pine Paneling, excluding studding time Quality Hardwood Paneling, excluding studding time Fix 50mm Rocksil Insulation to cavities Fix Timber Studding and Paramount Partitions Fix Timber Studding and Demountable Partitions
- Plasterboard

0.8 0.3 2.6 0.8 3.6 4.0 -

3.2 1.1 0.5 17.8 3.0 1.1 4.0 5.0 12.5 16.5 0.1 25.0 9.0 12.0 6.5 20.0 7.0 9.0 8.7 1.8 8.0 2.3 4.0 10.4 1.3 1.1 1.1 55.5 1.5 27.1 1.0

3.6 1.4 0.6 20.2 3.4 1.6 5.5 6.7 7.8 10.1 9.7 9.2 3.2 12.2 1.5 32.0 1.2

m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr hrs/m m2/day m2/day m2/day m2/day m/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/hr m2/hr no/hr m/hr m2/hr no/hr m2/hr
7/26

11 Architectural Builders Work and Finishes

Boarding to Plaster dabs Boarding to Stud-work/Metal Lathes Boarding 12mm nailed to studding Boarding 19mm nailed to studding Tape, Jointing and Sanding
- Restoration Works

12 Architectural Builders Work and Finishes

Faade Cleaning, Water Jetting Faade Cleaning, Acid Etching Faade Cleaning, Grit Blasting Cladding Restoration, Brickwork Cladding Restoration, Stonework courses
- Stonework

5.6 7.2 6.9 6.9 6.9 20.4 0.9

13 Architectural Builders Work and Finishes

Fix 0.5m2 Stones to Metal Support Frame Fix 0.5-0.75m2 Stones to Metal Support Frame Fix 0.75-1.0m2 Stones to Metal Support Frame Fix Complex Stonework to Metal Support Frame Fix Curved Stone Cladding Fix Stone Edge Beams/Window Reveals Fix Stone Soffits Stone Floors Granite Wall Panels, First Fix Granite Wall Panels, Second Fix
- Wall Finishes

14 Architectural Builders Work and Finishes

Mosaic Tiling, 0.045x0.045m Clay, quarry Tiles, Window Cills, setout and level Clay, quarry Tiles, Window Cills, fix, grout and clean Ceramic Tiles 150x150mm, Ledges/Upstands Ceramic Tiles 150x150mm, Areas under 1.5m2 per room

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140

6 7 8 9 10 1 2 3 4

Ceramic Tiles 150x150mm, Areas of 1.5-2.5m2 per room Ceramic Tiles 150x150mm, Areas over 2.5m2 per room Ceramic Tiles 150x150mm, Extra Over for Cutting Ceramic Tiles 108x108mm, Ledges/Upstands Ceramic Tiles 108x108mm, Areas under 1.5m2 per room
- Wallpapering

1.4 1.5 1.0 9.2 11.7 13.9 55.8 28.8 65.0 15.0 -

1.6 1.7 41.6 62.5 1.3 5.0 5.0 4.2 4.0 7.1 17.0 300.0 6.9 1.2 3.3 13.9 17.2 20.8 90.1 48.5 95.0 25.0 5.5 2.8 2.8 2.4 8.3

1.9 2.1 1.5 -

m2/hr m2/hr no/hr no/hr m2/hr m2/hr m2/hr m2/hr m2/hr

15 Architectural Builders Work and Finishes

Strip Existing Wallpaper (3 layers) & Prepare Walls Fix Wallpaper and lining paper Fix Vinyl and Washable paper Fix Ceiling Lining Paper
- Decking

16 Bridge Works

1 Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover
17 Bridge Works - Finishes

- m/day - m/day 500.0 mm/hr - m/day - days/no - m/day 25.0 29.4 37.0 170.0 85.0 145.0 30.0 8.6 6.9 7.0 m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr

1 Simple Universal Beam Steel Bridge, bridge lighting, handrails etc


18 Bridge Works - Formwork

1 Shaft Slip Forming


19 Bridge Works - Paintwork

1 Simple Universal Beam Steel Bridge, paintwork to all steel


20 Bridge Works - Structural Steelwork

1 Simple Universal Beam Steel Bridge, erect support steel H frames 2 Simple Universal Beam Steel Bridge, erect 15m truss
21 Concrete Works - Concrete Finishing

1 2 3 4 5 6 7 8 9 10

Surface Finishing, Steel Float By Hand Surface Finishing, Wood Float By Hand Surface Finishing, Power Float Surface Finishing, Light Brush on Trowel Surface Finishing, Brush on Trowel Margin Surface Finishing, Sprayed By Pump, expose aggregate Surface Finishing, Wire Brush, expose aggregate Making Good Walls, prepare, shutter, pour Making Good Columns, prepare, shutter, pour Making Good Sides of Beams, prepare, shutter, pour
- Concrete Mixing

22 Concrete Works

1 Concrete Weight, 1m3 2 Readymix Lorry, Length

- Tonnes - m
8/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175

3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9

Readymix Lorry, Width Readymix Lorry, Height Readymix Lorry, Length Readymix Lorry, Turning Circle Readymix Lorry, Allowable Access Ramp Gradient Mixing Concrete, By Hand Mixing Concrete, Single Drum Paddle Mixer Mixing Concrete, Double Drum Paddle Mixer
- Concrete Placement

158.0 315.0 30.0 85.0 40.0 2.1 1.5 0.8 2.8 1.5 1.0 0.9 1.6 2.0 2.3 1.1 1.7 1.8 2.5 0.6 0.4 2.7

2.5 3.7 24.4 16.4 17.0 0.3 180.0 370.0 40.0 100.0 50.0 2.3 1.8 1.1 3.1 1.3 1.5 1.6 2.0 2.3 2.5 1.7 1.8 2.5 2.6 0.8 48.0 120.0 0.2 1.2

20.0 210.0 420.0 50.0 120.0 70.0 2.5 2.1 1.5 3.3 1.6 1.7 2.3 2.0 2.3 2.5 3.1 1.8 2.5 2.6 3.5 1.2

m m Tonnes m degrees m3/hr m3/hr m3/hr m3/hr m2/hr m2/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr

23 Concrete Works

Placing concrete, lorry based pump Hollorib Decking, concrete topping Hollorib Decking, concrete topping, incl PowerFloat Placing Concrete, By Wheelbarrow over 1-10m Placing Concrete, By Wheelbarrow over 10-20m Placing Concrete, By Wheelbarrow over 20-50m Placing Direct From Readymix Lorry, Mass Fill Placing Direct From Readymix Lorry, 50mm Blinding Placing Direct From Readymix Lorry, Ground Beams Placing Direct From Readymix Lorry, Pile Caps
- Formwork

24 Concrete Works

Pilecaps, < 0.7m2 Pilecaps, 0.7-2.5m2 Pilecaps, 2.5-3.0m2 Pilecaps, > 3.0m2 Ground Beams, < 0.7m2 Ground Beams, 0.7-1.5m2 Ground Beams, 1.5-3.0m2 Ground Beams, 3.0-5.0m2 Elevated Plain Slab Soffit
- Post Tensioning

25 Concrete Works

1 Lag for Initial Stress Tensioning after 1st bay cast 2 Lag for Final Stress Tensioning after Initial Stress
26 Concrete Works - Pre-Cast Concrete

- hrs - hrs 0.1 hrs/plank 0.9 hrs/1000no


9/26

1 Precast Plank and Block Flooring System, Plank Elements 2 Precast Plank and Block Flooring System, Block Elements

Production Rate From Planning Planet


No. Item 27 Concrete Works Task / Description - Reinforcement Slow Ave Fast Units

176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5

Slabs/Foundations, steelfixing, 6mm Slabs/Foundations, steelfixing, 8mm Slabs/Foundations, steelfixing, 10mm Slabs/Foundations, steelfixing, 12mm Slabs/Foundations, steelfixing, 16mm Slabs/Foundations, steelfixing, 20mm Slabs/Foundations, steelfixing, 25mm Slabs/Foundations, steelfixing, 32mm Slabs/Foundations, steelfixing, 40mm Slabs/Foundations, steelfixing, 50mm
- Reinforcement Ratios

40.3 28.2 22.5 16.9 12.0 9.2 6.9 5.7 5.3 5.2 15.8 14.7 1.8 1.4 1.2 1.5 1.4 1.2 1.4 1.2 1.1 0.7 0.6 0.4 0.3 0.8

38.4 26.9 20.6 16.3 11.5 8.6 6.7 5.5 5.1 4.9 14.8 13.2 20.6 15.6 18.7 15.0 2.5 1.9 1.6 2.2 1.9 1.6 2.1 1.6 1.4 71.4 0.8 0.8 0.5 0.4 0.9

36.5 25.8 20.1 15.4 10.9 8.2 6.5 5.2 4.9 4.6 14.1 25.6 28.7 3.2 2.5 2.1 2.9 2.1 2.0 2.9 2.1 1.8 1.1 0.9 0.6 0.5 1.2

hrs/tonne hrs/tonne hrs/tonne hrs/tonne hrs/tonne hrs/tonne hrs/tonne hrs/tonne hrs/tonne hrs/tonn % ratio % ratio % ratio % ratio % ratio % ratio m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr

28 Concrete Works

Pile Cap, Concrete m3 x Ratio = Rebar Tonnes Base Slab, Concrete m3 x Ratio = Rebar Tonnes Suspended Slab, Concrete m3 x Ratio = Rebar Tonnes Platform Slab, Concrete m3 x Ratio = Rebar Tonnes Columns, Concrete m3 x Ratio = Rebar Tonnes Walls, Concrete m3 x Ratio = Rebar Tonnes
- Blockwork

29 Construction Wet Trades

Thermalite Blockwork, under 100mm thick Thermalite Blockwork, under 100-150mm thick Thermalite Blockwork, over 150mm thick Lightweight Concrete Blockwork, under 100mm thick Lightweight Concrete Blockwork, under 100-150mm thick Lightweight Concrete Blockwork, over 150mm thick Heavyweight Concrete Blockwork, under 100mm thick Heavyweight Concrete Blockwork, under 100-150mm thick Heavyweight Concrete Blockwork, over 150mm thick Face Finish, Raked Out
- Brickwork

30 Construction Wet Trades

English Bond, 0.5 Brick thick English Bond, 1.0 Brick thick English Bond, 1.5 Brick thick English Bond, 2.0 Brick thick Flemish Bond, 0.5 Brick thick

10/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245

6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 1 2 3 4 5 6 7 1 2 3 4

Flemish Bond, 1.0 Brick thick Flemish Bond, 1.5 Brick thick Flemish Bond, 2.0 Brick thick Flemish Garden Wall Bond, 0.5 Brick thick English Garden Wall Bond, 0.5 Brick thick
- Plastering

0.6 0.3 0.3 0.8 0.8 2.2 2.1 9.9 5.2 3.3 6.1 5.5 12.6 7.7 3.2 2.0 3.2 5.5 5.2 9.1

0.7 0.8 0.4 1.2 1.0 2.8 2.6 10.0 5.4 3.6 5.0 6.7 6.1 13.8 8.3 2.2 1.5 1.2 1.5 1.4 4.8 4.6 4.2 3.8 3.3 3.0 10.0 4.1 6.2

0.9 1.0 0.5 1.4 1.3 3.1 2.8 10.1 6.4 3.9 7.3 6.7 15.4 9.8 2.7 1.7 1.4 1.7 5.7 5.5 5.3 5.2 3.9 3.6 1.9 3.7 3.9 4.7

m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m/hr hrs/m3 hrs/m3 hrs/m3 hrs/m3

31 Construction Wet Trades

Browning (undercoat), Internal Walls under 2.5m high Browning (undercoat), Internal Walls over 2.5m high Browning (undercoat), Reveals and Columns less than 100mm wide Browning (undercoat), Reveals and Columns 100-200mm wide Browning (undercoat), Reveals and Columns 200-300mm wide Covings Skimming (topcoat), Internal Walls under 2.5m high Skimming (topcoat), Internal Walls over 2.5m high Skimming (topcoat), Reveals and Columns less than 100mm wide Skimming (topcoat), Reveals and Columns 100-200mm wide
- Rendering

32 Construction Wet Trades

Large Wall Areas, applied in 2 coats Small Wall Areas, applied in 2 coats Narrow Widths, applied in 2 coats Columns and Beams, applied in 2 coats Staircase and Soffits, applied in 2 coats
- Screeding

33 Construction Wet Trades

Sand/Cement Floor Screed, 15-20mm thick Sand/Cement Floor Screed, 20-30mm thick Sand/Cement Floor Screed, 30-40mm thick Sand/Cement Floor Screed, 40-50mm thick Sand/Cement Floor Screed, 50-65mm thick Sand/Cement Floor Screed, 65-100mm thick Fix/Setout Screed Battens
- Breaking Out

34 Demolition and Breaking Out

Concrete Slabs, unreinforced 50-150mm Concrete Slabs, unreinforced 150-300mm Concrete Slabs, reinforced 50-150mm Concrete Slabs, reinforced 150-300mm

11/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280

5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6

Concrete Walls, unreinforced Concrete Walls, reinforced Concrete Foundations, unreinforced Concrete Foundations, reinforced Concrete Beams Concrete Columns
- Cutting Back

4.7 5.6 3.6 5.4 7.5 9.2 0.6 1.5 1.8 1.9 2.5 4.2 9.2 10.1 11.5 1.5 1.2 1.0 0.9 3.1 2.5 2.1 1.8 2.1 1.6 7.1 3.6 6.6 4.2 20.0 10.0

3.9 4.7 3.3 5.1 6.5 8.2 15.2 2.1 1.6 1.4 1.2 4.0 3.3 2.9 2.4 2.7 2.3 9.5 4.5 9.5 5.3 23.0 12.5

3.1 3.9 3.0 4.8 5.6 7.3 0.3 0.4 0.8 0.8 1.1 2.3 8.2 9.5 10.2 3.1 2.5 2.1 1.8 5.8 5.0 4.2 3.7 4.1 3.5 12.5 5.6 12.5 6.3 25.0 14.3

hrs/m3 hrs/m3 hrs/m3 hrs/m3 hrs/m3 hrs/m3 hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no hrs/no m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr no/hr no/hr no/hr no/hr no/hr no/hr

35 Demolition and Breaking Out

Concrete Pile Caps, 50-300mm deep and 0.6m dia Concrete Pile Caps, 300-750mm deep and 0.6m dia Concrete Pile Caps, > 750mm deep and 0.6m dia Concrete Pile Caps, 50-300mm deep and 1.1m dia Concrete Pile Caps, 300-750mm deep and 1.1m dia Concrete Pile Caps, > 750mm deep and 1.1m dia Concrete Pile Caps, 50-300mm deep and 2.5m dia Concrete Pile Caps, 300-750mm deep and 2.5m dia Concrete Pile Caps, > 750mm deep and 2.5m dia Concrete, Cutting Slabs, 5-25m deep
- Cutting Chases

36 Demolition and Breaking Out

Concrete, cutting by hand, < 25mm wide Concrete, cutting by hand, 25-50mm wide Concrete, cutting by hand, 50-75mm wide Concrete, cutting by hand, 75-100mm wide Concrete, cutting by machine, < 25mm wide Concrete, cutting by machine, 25-50mm wide Concrete, cutting by machine, 50-75mm wide Concrete, cutting by machine, 75-100mm wide Brickwork, cutting by hand, < 25mm wide Brickwork, cutting by hand, 25-50mm wide
- Cutting Switchboxes

37 Demolition and Breaking Out

Cutting in Concrete, small box Cutting in Concrete, large box Cutting in Brickwork, small box Cutting in Brickwork, large box Cutting in Lightweight Blockwork, small box Cutting in Lightweight Blockwork, large box

12/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315

7 Cutting in Heavyweight Blockwork, small box 8 Cutting in Heavyweight Blockwork, large box
38 Demolition and Breaking Out - Demolition

7.7 3.8 2.0 3.2 2.1 -

10.0 4.8 2.5 2.5 8.7 7.1 5.7 4.6 3.1 3.9 3.2 4.0 25.0 2.9 14.0 18.0 22.0 26.0 0.9 0.8 0.6 16.0 12.0 3.0 5.0 8.0 1.0 2.0 38.0 16.0

12.5 no/hr 5.9 no/hr 3.4 5.0 5.9 38.0 Tonnes/m3 m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr hrs/no hrs/no hrs/no m/hr m/hr m/hr

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9

Weight, Structural Steel Remove & Cart away, Ceramic Wall Tiles Remove & Cart away, Wallpaper, 1 layer Remove & Cart away, Wallpaper, 2 layers Remove & Cart away, Wallpaper, 3 layers Remove & Cart away, Lathe and Plaster Ceilings Remove & Cart away, Plaster to Walls Remove & Cart away, External Render Remove & Cart away, Floor Screed Remove & Cart away, Concrete Paving
- Site Clearance

39 Demolition and Breaking Out

Shrubs and Bushes, dig up and removal Turf, lifting and removal Trees, small sizes and shrubs Trees and Shrubs, 500mm - 900mm girth Trees and Shrubs, 900mm - 1200mm girth Trees and Shrubs, 1200mm - 1500mm girth Hedges and Roots, 0.5-1.0m high Hedges and Roots, 1.0-1.5m high Hedges and Roots, 1.5-2.0m high
- Escalators

40 Design Works

1 Truss type, develop concept design and gain client approval 2 Truss type, prepare preliminary design and gain approval
41 Electrical and Mechanical Installations - Commercial Kitchen

- wks - wks wks wks wks mandays mandays

1 2 3 4 5

Overall Installation for 100 persons or 50m2 Overall Installation for 500 persons or 150m2 Overall Installation for 1000 persons or 250m2 Install Ovens, friers and large mixers etc Install Sinks, bain maries and washers etc
- Electrical System

42 Electrical and Mechanical Installations

1 Railway Station 1st Fix 2 Railway Station 2nd Fix

- wks - wks
13/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350

3 4 5 6 7 8 9 10

Railway Station T&C Cable Installation, 1 cable laid in trench and protect Cable Installation, 2 cable laid in trench and protect Cable Installation, 5 cable laid in trench and protect Cable Installation, 7 cable laid in trench and protect Cable Installation, 8 cable laid in trench and protect Cable Installation, 2 cable laid in trench and protect, 100mm dia Cable Installation, 2 cable laid in trench and protect, 135mm dia
- Environmental Control

8.0 6.2 5.6 4.3 3.7 3.5 1.8 1.6 38.0 16.0 10.0 12.0 60.0 1.0 6.0 5.0 2.0 2.0 2.0 30.0 10.0 8.0 3.0 2.0 1.0 12.0 65.0 30.0 6.0 8.0

wks m/hr m/hr m/hr m/hr m/hr m/hr m/hr

43 Electrical and Mechanical Installations

1 Railway Station 1st Fix 2 Railway Station 2nd Fix 3 Railway Station T&C
44 Electrical and Mechanical Installations - Escalators

- wks - wks - wks 11.0 48.0 4.0 wks wks wks wks wks wks wks wks

1 2 3 4 5 6 7 8

Truss type, Overall Installation (excl arch finishes) Truss type, Manufacture, test and deliver Truss type, Phase A assemble truss , position/level Truss type, Stop-Work for surrounding finishes Truss type, Phase B decking and glazing etc Truss type, Phase C performance testing Truss type, Phase D full load testing Truss type, Phase E final test and inspection
- Fire Services System

14.0 8.0 -

45 Electrical and Mechanical Installations

1 Railway Station 1st Fix 2 Railway Station 2nd Fix 3 Railway Station T&C
46 Electrical and Mechanical Installations - Lift Installation

- wks - wks - wks 52.0 wks/floor wks/floor day/floor wks wks

1 2 3 4 5

Hydraulic Lift, Install 2 to 3 storeys Hydraulic Lift, Install 4 storeys and above Hydraulic Lift, Testing allow 2 wks plus Standard Lift, Manufacture, test and deliver Non-Standard Lift, Manufacture, test and deliver
- Plumbing and Drainage

75.0 -

47 Electrical and Mechanical Installations

1 Railway Station 1st Fix 2 Railway Station 2nd Fix 3 Railway Station T&C

- wks - wks - wks


14/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385

4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9

Cast Iron TimeSaver 100mm Pipes Cast Iron TimeSaver 100mm Bends Cast Iron TimeSaver 100mm Branches Cast Iron TimeSaver 100mm Double Branches Cast Iron Spigot Joint Pipes, 100mm Cast Iron Spigot Joint Pipes, 150mm Cast Iron Spigot Joint Pipes, 225mm
- Power Supply

11.0 12.0 12.0 12.0 2,100.0 0.5 40.0 4.0 6.4 5.5 5.2 4.7 12.6 11.7 10.9 9.7 18.2

1.2 1.3 2.2 2.5 1.1 0.8 0.5 12.0 12.0 5.0 6.0 5.0 1.0 10.0 9.0 6.0 1.1 4.0 50.0 2.4 3.5 0.7 8.0 6.9 6.5 5.9 15.4 14.3 13.3 11.8 20.0

1.2 55.0 2.0 9.4 8.1 7.9 8.2 18.9 16.7 15.6 14.0 23.0

m/hr hrs/no hrs/no hrs/no m/hr m/hr m/hr days days days days days days days days days m run/day hrs/no hrs/cage m3/hr days/no days/no days/no m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

48 Electrical and Mechanical Installations

AC Install 2 no Service transformers, 6 men AC Install 2 no Switchgear, 7 men AC Install Associated Trays and ladders, 3 men AC Cable Terminations in Tx and SWG Rooms, 3 men DC Install Insulated Flooring in DC Room, 1 men DC Install 1 set Rectifier Transformer and Rectifier, 7 men DC Install Switchgear, 7 men DC Primary Cable Terminations and Busduct, 18 men DC Secondary Cable Terminations and Connections, 9 men Trackside Cabling 33kV/Pilot Cables, 10 men
- Barrette Piles

49 Foundations and Excavation

Rule of Thumb, overall rate by Mill Fabricate reinforcement cages Concreting barrette panels Trimming top of barrette panels Concrete Testing, Coring Test Concrete Testing, Sonic Logging Test
- Basement Excavation

50 Foundations and Excavation

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works

15/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420

10 Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works


51 Foundations and Excavation - Bell Ground Anchors

16.5 8.0 10.0 25.0 45.0 60.0 30.0 10.0 -

18.1 2.0 1.0 2.2 4.0 8.0 10.0 25.0 45.0 2.0 3.5 2.1 2.5 0.5 15.0 33.0 40.0 45.0 60.0 2.5 2.4 1.9 1.8 48.0 20.0 8.0 21.0 2.5 3.5

20.0 m3/hr - no/day - no/day - no/day 4.0 20.0 59.0 days/no days/no days/no days/no days/no hrs m/hr m/hr m/hr m/hr % % % % % Tonnes/m3 Tonnes/m3 Tonnes/m3 Tonnes/m3 m3/hr

1 Uncased Anchors, 10m long 2 Top Cased Anchors, 15m long 3 Anchors stressing
52 Foundations and Excavation - Bored Piling

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

Cycle Time, 5-20m deep Cycle Time, 20-40m deep Cycle Time, 40-70m deep Cycle Time, 70-90m deep Cycle Time, 90-135m deep Move piling setup to next location Excave shaft by grab, general fill/uppr levels Excave shaft by grab, sand/minor rubble Excave shaft by grab, marinve/aluvium Excave shaft by grab/RCD, CDT
- Bulk Excavation

53 Foundations and Excavation

Excavation Bulking Factor, Sand/Soil Excavation Bulking Factor, Gravel Excavation Bulking Factor, Clay/Chalk Excavation Bulking Factor, Boulder Clay Excavation Bulking Factor, Rock Spoil Weight, Rock Spoil Weight, Concrete Spoil Weight, Landfill/CDG Spoil Weight, Sand Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle
- Contigous Piling

54 Foundations and Excavation

1 Extra Over time for bored pile build times


55 Foundations and Excavation - Dewatering

- % 6.0 days days days/pump days/pump

1 2 3 4

Setup small 2 hole system Setup large 15 hole system Calculate system times per pump Setup Recharge System
- Diaphragm Walls

56 Foundations and Excavation

16/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455

1 2 3 4 5 6 7 8 9 10

Guide Walls, construction Guide Walls, demolition Rule of Thumb, overall rate by Mill Rule of Thumb, overall rate by grab Excavation by grab, sand fill Excavation by grab, minor obstructions Excavation by grab/Mill, CDG < 50 Excavation by Mill, CDG 50-100 Excavation by Mill, CDG 100-200 Excavation by Mill, CDG > 200
- Driven Piles

0.3 0.1 0.8 0.2 4.2 0.5 5.8 6.0 5.5 5.5 75.0 80.0 200.0 14.5 15.2 12.3 11.2 25.4 25.6 22.5 18.9 330.0 28.5 -

0.5 0.3 1.2 0.5 6.0 2.0 6.0 6.5 6.0 6.0 100.0 120.0 350.0 20.0 20.4 18.5 16.9 30.3 31.3 27.8 24.4 8.0 6.5 380.0 31.2 58.8 55.6 38.4 57.8 3.0

0.8 0.6 1.9 1.1 5.5 3.5 7.0 8.0 6.5 6.5

m/hr m/hr m/hr m/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr

57 Foundations and Excavation

1 West Piling, pre-cast concrete shells 2 Balken Piling, pre-cast concrete piles 3 H Piles, driven steel H-beams
58 Foundations and Excavation - Excavate and Remove

120.0 m/day 135.0 m/day 500.0 m/day 25.6 25.6 23.2 21.3 35.7 37.0 33.3 30.3 465.0 45.2 m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr hrs hrs m3/hr m2/hr m2/hr m2/hr m2/hr m2/hr

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay Load Spoil to Barge, capacity 2,000m3 Load Spoil to Barge, capacity 1,500m3
- Ground Compaction

59 Foundations and Excavation

Deep Vibroflot, 3m centres Vibro-Roller, Sand Vibro-Roller, Soil Vibro-Roller, Clay Vibro-Roller, Hardcore Vibro-Roller, Ash
- Ground Monitoring

60 Foundations and Excavation

1 Drill and setup Instruments


61 Foundations and Excavation - Grouting

- days/no

17/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490

1 Grout curtain installation


62 Foundations and Excavation - Hand Dug Caissons

55.0 0.5 - Secant Piling

6.2 33.0 0.8 7.0 6.0 2.0 12.0 55.0 32.0 10.0 3.2 0.8 0.5 0.4 2.5 8.4 4.5 4.1 4.1 10.0 8.7 8.3 7.7 13.3 11.1 4.5

- hrs/m run 25.0 days/no 0.9 m/hr - hrs - hrs - hrs - wks 60.0 m/day 10.5 m/day 14.0 3.9 0.9 0.7 0.7 m/hr m/hr m/hr m/hr m/hr

1 Caisson Wall, 800mm dia, 26m deep


63 Foundations and Excavation - Mini Piles

1 Mini Piles, driven with concrete cap, 235mm dia, 35m deep
64 Foundations and Excavation - Removable Anchors

1 Drill 30m shaft 2 Install strands/setup anchor 3 Grout in strands


65 Foundations and Excavation

1 Construct 30m dia cofferdam, 255 piles/concrete base


66 Foundations and Excavation - Sheet Piling

3.5 8.0 2.5 0.4 0.2 0.1 1.8 6.7 3.2 3.3 3.3 8.2 7.1 6.5 6.3 12.2 10.2 3.8

1 Vibro/Drop Hammer, 10m deep Sand 2 Vibro/Drop Hammer, 35m deep Sand
67 Foundations and Excavation - Site Investigation

1 2 3 4 5

Pre Drilling, Rercussive or Rotary, soft deposits Pre Drilling, Wash Boring, grade V/IV rock Pre Drilling, Triple Tube Sampling, grade V/IV rock Pre Drilling, Rotary, grade III/II rock Pre Drilling, Triple Tube Sampling, grade III/II rock
- Slurry Mix Walls

68 Foundations and Excavation

1 Crane grab, cement/bentonite and sheet piles


69 Foundations and Excavation - Small or Deep Excavation

3.4 m/day 9.9 5.0 5.2 5.2 11.7 10.2 9.4 9.1 15.4 12.9 m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

1 2 3 4 5 6 7 8 9 10

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil Hydraulic Excavator, 0.3m3 bucket, Gravel Beds Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk Hydraulic Excavator, 0.3m3 bucket, Hard Ground Hydraulic Excavator, 0.4m3 bucket, Sand/Soil Hydraulic Excavator, 0.4m3 bucket, Gravel Beds Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk Hydraulic Excavator, 0.4m3 bucket, Hard Ground Hydraulic Excavator, 0.5m3 bucket, Sand/Soil Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
- Soil Mix Walls

70 Foundations and Excavation

1 Three Auger Drill, cement and cure

6.4 m/day
18/26

Production Rate From Planning Planet


No. Item 71 Foundations and Excavation Task / Description - Spread and Level Slow Ave Fast Units

491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525

1 2 3 4 5 6 7 8 9 10

Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile Crawler Shovel, 0.8m3 bucket, Gravel, pushed 5-50m to stockpile Crawler Shovel, 0.8m3 bucket, Gravel, pushed 50-120m to stockpile Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 5-50m to stockpile Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 50-120m to stockpile Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 5-50m to stockpile Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 50-120m to stockpile Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 5-50m to stockpile Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 50-120m to stockpile
- Steel Strutting

13.9 7.6 14.2 7.6 12.7 6.9 11.6 6.3 23.8 16.7 5.6 4.8 4.8 9.7 20.5 18.2 18.2 17.0 26.0 26.3 0.1 5.0

20.4 9.5 20.4 10.2 18.4 8.9 16.9 8.2 28.5 18.5 2.0 6.0 7.1 6.1 6.1 5.4 25.0 22.2 22.2 20.0 28.6 28.6 1.2 0.4 0.3 0.2 0.8 0.7 0.5 4.0

25.0 12.6 25.6 12.8 23.2 11.6 21.3 10.4 35.7 20.4

m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

72 Foundations and Excavation

1 Horizontal heavy duty strutting 2 Diagonal heavy duty strutting


73 Foundations and Excavation - Trench Excavation

- days/no - days/no 8.2 7.3 7.1 6.4 29.2 26.0 26.0 23.4 33.1 33.2 2.2 0.7 m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m/day m2/hr m2/hr m2/hr m/hr m/hr m/hr

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil Hydraulic Excavator, 0.3m3 bucket, Gravel Beds Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk Hydraulic Excavator, 0.3m3 bucket, Hard Ground Hydraulic Excavator, 0.4m3 bucket, Sand/Soil Hydraulic Excavator, 0.4m3 bucket, Gravel Beds Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk Hydraulic Excavator, 0.4m3 bucket, Hard Ground Hydraulic Excavator, 0.5m3 bucket, Sand/Soil Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
- Underpinning

74 Foundations and Excavation

Concrete Pinning, 4th or 5th pin cycles Brickwork Pinning, 1.0 brick thick Brickwork Pinning, 1.5 brick thick Brickwork Pinning, 2.0 brick thick Wedge and Pin Method, 102mm wall Wedge and Pin Method, 215mm wall Wedge and Pin Method, 317mm wall
- Rule of Thumb

75 Quick Reference

1 Site Investigation Pre Drilling

3.0 days/no
19/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560

2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 1 2 3 4 5 6 7 8 9

Ground Excavation, Hydraulic Backhoe Bored Piling, 25-70m deep Formwork Fixing Reinforcement Fixing Concrete Placement Scaffold Erection, Steel Falsework Blockwork Laying Plastering and Rendering Blockwork Laying
- Trackwork

10.0 7.0 9.6 10.2 10.6 17.1 3.6 11.2 -

50.0 8.0 12.0 0.7 16.0 140.0 7.0 12.0 12.0 41.0 35.0 35.0 20.0 34.0 29.0 4.6 1.8 14.2 7.7 6.2 5.7 8.1 9.5 12.2 15.2 18.2 22.2 27.7 33.3

6.0 17.5 5.7 20.2 -

m3/day days/no m2/day Tonnes/day m3/day m3/day m2/day m2/day m2/day m/day m/day m/day m/day m/day m/day m/day m/day m/day m/day m2/hr m2/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr

76 Railway Works

FST Floating Track Slab, side restraints FST Floating Track Slab, resin pads FST Floating Track Slab, slab units PCBT - Pre-cast Concrete Block Track, in Bored Tunnels PCBT - Pre-cast Concrete Block Track, in Cut and Cover Tunnels PCBT - Pre-cast Concrete Block Track, in Station Tunnels IST - Isolated Slab Track, in Bored Tunnels IST - Isolated Slab Track, in Cut and Cover Tunnels IST - Isolated Slab Track, in Station FST - Floating Slab Track, in Station
- Carpentry & Joinery

77 Roads & External Works

Formwork to Soffit of Manhole Formwork to Walls of Manhole Formwork to Road Edges, straight Formwork to Road Edges, curves
- Drainage

78 Roads & External Works

PVC Drainage, 1m pipes, 100-150mm dia, 0-5m run PVC Drainage, 1m pipes, 100-150mm dia, 5-30m run PVC Drainage, 1m pipes, 100-150mm dia, over 30m run PVC Drainage, 3m pipes, 100-150mm dia, 0-5m run PVC Drainage, 3m pipes, 100-150mm dia, 5-30m run PVC Drainage, 3m pipes, 100-150mm dia, over 30m run PVC Drainage, 6m pipes, 100-150mm dia, 0-5m run PVC Drainage, 6m pipes, 100-150mm dia, 5-30m run PVC Drainage, 6m pipes, 100-150mm dia, over 30m run

20/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595

10 PVC Drainage, 3m pipes, 150-200mm dia, 5-30m run


79 Roads & External Works - Ducting

1.0 3.3 3.2 2.7 2.3 1.5 1.1 1.7 1.6 0.9 -

10.6 11.9 1.2 4.5 4.0 4.2 4.4 5.5 23.8 33.3 41.6 71.4 0.3 0.2 2.5 1.3 11.6 14.1 18.8 8.4 10.2 11.9 5.4 6.5 7.9

- m/hr - m/hr 4.2 2.7 2.3 1.5 2.8 1.9 1.9 m/hr no/hr no/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr m/hr
21/26

1 Lay PVC Cable Ducting, 89mm dia


80 Roads & External Works - Fencing Works

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9

Site Hoarding, timber posts, plywood nailed to horizontal rails Post Erection, Timber / Metal, dig, erect, fix Post Erection, Concrete, dig, erect, fix Fence Erection, Chainlink, posts at 1.5m Fence Erection, Chainlink, posts at 2.0m Fence Erection, Chainlink, posts at 3.0m Fence Erection, Chestnut Pailings, posts at 1.5m Fence Erection, Chestnut Pailings, posts at 2.0m Fence Erection, Chestnut Pailings, posts at 3.0m Fence Erection, Barbed Wire, posts at 1.5m
- Kerbs & Paving

81 Roads & External Works

Concrete Slabs, laid on bedding, to slight falls Concrete Slabs, laid on bedding, to steep falls Concrete Slabs, laid in mortar, to slight falls Concrete Slabs, laid in mortar, to steep falls Concrete Slabs, laid on sand, to slight falls Concrete Slabs, laid on sand, to steep falls Cobble Stones, laid in mortar, no patterns Cobble Stones, laid in mortar, with patterns Artificial Stone, laid on sand, with patterns Brick Paviors, in mortar, straight joints
- Land Drains

82 Roads & External Works

Land Drains, Concrete, butt jointed, under 150mm dia, 0-5m run Land Drains, Concrete, butt jointed, under 150mm dia, 5-30m run Land Drains, Concrete, butt jointed, under 150mm dia, over 30m run Land Drains, Concrete, butt jointed, 150-225mm dia, 0-5m run Land Drains, Concrete, butt jointed, 150-225mm dia, 5-30m run Land Drains, Concrete, butt jointed, 150-225mm dia, over 30m run Land Drains, Concrete, butt jointed, 225-300mm dia, 0-5m run Land Drains, Concrete, butt jointed, 225-300mm dia, 5-30m run Land Drains, Concrete, butt jointed, 225-300mm dia, over 30m run

Production Rate From Planning Planet


No. Item 83 Roads & External Works Task / Description - Landscaping Slow Ave Fast Units

596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630

1 2 3 4 5 6

Top Soil, spread, level and prepare for turf or seeding Top Soil, rake in fertilizer for seeding Planting, Shrubs and Hedges, under 750mm high Planting, Shrubs and Hedges, over 750mm high Planting, Saplings, under 3.0m high Turfing, including for minor preparations
- Lighting

2.5 25.0 4.0 1.5 1.7 16.8 6.2 1.2 1.6 0.3 0.2 0.2 0.9 1.2 1.8 0.1 0.2 0.4 12.5 7.7 6.7 14.5 70.0 28.0 35.0 1.2 1.1 25.0 45.0

m2/hr m2/hr no/hr no/hr no/hr m2/hr

84 Roads & External Works

1 Lay Street Lighting Cables and connect


85 Roads & External Works - Manholes and Gulleys

- m/hr hrs/no hrs/no m2/hr m2/hr m2/hr hrs/no hrs/no hrs/no hrs/no hrs/no m3/hr m2/hr m2/hr m2/hr m2/day m2/day m2/day m2/day m2/hr m2/hr m2/day

1 2 3 4 5 6 7 8 9 10 1 2 3 4 1 2 3 4 5 6 7

Concrete Pre-Cast Manhole Units, 610 x 455 x 51 mm Concrete Pre-Cast Manhole Units, 990 x 610 x 64 mm Brickwork Manhole, 1.0 brick engineering Brickwork Manhole, 1.5 brick engineering Brickwork Manhole, 2.0 brick engineering Benching to Manhole, under 0.5m2 Benching to Manhole, 0.5-0.75m2 Benching to Manhole, 0.75-1.0m2 Brickwork Manhole, build in pipes, under 150mm dia Brickwork Manhole, build in pipes, 150-225mm dia
- Road Works

86 Roads & External Works

Concrete Road surfacing, Kerbs or Side Haunches Concrete Road surfacing, 150mm thick Concrete Road surfacing, 200mm thick Concrete Road surfacing, 300mm thick
- Curtain Walling

87 Roof Structures and Coverings

Vertical Glazed Lights, 6m x 2.5m Vertical Glazed Walls, large scale Clerestory Frame/Glazing, 3m x 4m Oriel Window Frame/Glazing, 4m x 2m Glazed Curtain Wall, First Fix Glazed Curtain Wall, Second Fix High Quality Glazed Curtain Walling
- Flat and Layered Roofs

88 Roof Structures and Coverings

1 Asphalt Roof in layers

- m2/day
22/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665

2 3 4 5 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9

Asbestos Sheets in layers Felt Roofs, large areas Felt Roofs, small or complicated Felt Roofs, Gravel roof chippings
- Metal Decking

- Roof Insulation

39.0 52.0 35.0 1.4 70.0 28.0 9.5 3.0 2.7 2.4 2.1 2.8 1.9 2.5 3.3 3.1 3.1 2.1 2.5 2.2 2.5 2.9 1.9 8.5 12.0 19.0 1.1 50.0 40.0 54.0

m2/day m2/day m2/day Tons/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m2/day m/hr m/hr no/hr m/hr m/hr no/hr m/hr m/hr no/hr

89 Roof Structures and Coverings

Metal Decking, large areas Metal Decking, small or complicated Titanium Sheeted Roofs Copper Roofs, flat work Copper Roofs, sloping work Zinc Roofs, flat work Zinc Roofs, sloping work Aluminium Roofs, flat work Aluminium Roofs, sloping work Lead Roofs, flat work
- Rainwater Works

90 Roof Structures and Coverings

UPVC Downpipes, 75mm UPVC Guttering, 75mm UPVC RWP Fittings, 75mm Cast Iron Downpipes, 75mm Cast Iron Guttering, 75mm Cast Iron RWP Fittings, 75mm Aluminium Downpipes, 72mm Aluminium Guttering, 72mm Aluminium RWP Fittings, 72mm

91 Roof Structures and Coverings

1 Polystyrene Boards 2 Glass Fibre, low pitch 3 Glass Fibre, steep pitch
92 Roof Structures and Coverings - Roof Lights

- Sheeted Roofs

- m2/hr - m2/hr - m2/hr - no/day - m2/day - m2/day - m2/day


23/26

1 Large Lights on Tiled Roof


93 Roof Structures and Coverings

1 PVC Sheeted Roofs, large areas 2 PVC Sheeted Roofs, small areas 3 Plastic Profiled Sheet Systems

Production Rate From Planning Planet


No. Item Task / Description - Slates and Tiling Slow Ave Fast Units

666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700

94 Roof Structures and Coverings

1 2 3 4 5 1 2 3 4 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5

Slate Roofs, Welsh Slate 3-5mm Slate Roofs, Cumbrian Slate 8-11mm Slate Roofs, Asbestos Slates Tiled Roofs, Concrete Tiles Tiled Roofs, Clay Pan Tiles
- Steel Frames

3.4 18.2 13.3 14.1 18.8 10.4 5.1 11.1 9.1 2.8 3.2

18.0 8.5 36.0 52.0 26.0 1.6 5.2 0.3 1.3 2.7 1.2 32.1 20.0 16.6 15.6 20.1 16.1 5.4 11.0 10.0 3.2 0.5 3.3 1.6 11.9 10.0 3.2 3.7

4.6 21.7 18.2 16.1 21.7 16.6 5.8 7.5 -

m2/day m2/day m2/day m2/day m2/day Tons/day Tons/day Tons/day Tons/day no/hr m/hr m/hr m/hr no/hr no/hr no/hr no/hr no/hr no/hr days days mins/lift mins/15m seconds/m

95 Roof Structures and Coverings

Steel Frame and Roof Members Wall Frame, Bow String Truss and Frame Roof Frame, Curved Truss and Frame Wall Frame, Glazed Frame and Atrium
- Timber Frames

96 Roof Structures and Coverings

Roof Trusses Wall Plates Roof Rafters Ceiling Joists Roof Carcass, Common Rafters, under 3m Roof Carcass, Common Rafters, 3-6mm Roof Carcass, Common Rafters, over 6m Roof Carcass, Jack Rafters, under 3m Roof Carcass, Jack Rafters, 3-6mm Roof Carcass, Purlins, under 3m
- Tower Cranes

97 Scaffolds and Crainage

Erect and Setup 50m gib Dismantle 50m gib Lifting, Reinforcement Bins and Cages, 1st 15m lift Lifting, Reinforcement Bins and Cages, above 1st 15m lift Lifting, Crane Tracking Time
- Traffic Decking

98 Scaffolds and Crainage

1 Install Heavy duty truss and concrete panel deck


99 Scaffolds and Crainage - Working Platforms

- m2/hr 12.5 10.5 3.8 4.6 m run/hr m run/hr m run/hr m run/hr

1 2 3 4

Metal KwikStage, 5 Boards with 2m lifts Metal KwikStage, 5 Boards with 3m lifts Metal KwikStage, House Scaffold with 3 lifts Metal Tube and Fittings, 5-6 Boards wide

24/26

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735

5 6 7 8

Tube and Fitting Platforms, 50-250m3 Tube and Fitting Platforms, 250-1000m3 Tube and Fitting Platforms, over 1000m3 Tube and Fitting Platforms, striking
- Finishes

10.6 18.5 24.5 60.0 13.0 0.4 0.7 2.5 1.5 1.0 1.5 8.0 0.3 2.0 1.2 -

12.5 22.5 30.0 200.0 80.0 15.6 0.7 1.0 7.0 10.0 10.0 10.0 2.9 2.0 1.3 1.8 1.5 1.0 6.0 0.9 2.6 1.4 3.0 1.5 45.0 500.0 38.0

18.5 24.5 33.5 -

m3/hr m3/hr m3/hr % x erect

100 Structural Frames

1 Grit Blasting to structural steel frames, standard to SA2.5


101 Tunneling - Cut and Cover

100.0 m2/12hours 17.5 m2/hr 1.0 m/day 1.6 m/day 3.2 2.5 1.5 2.0 1.5 5.5 1.2 2.9 1.8 m m m m m/day m/day m/day m/day m/day m/day mins m3/cycle m3/cycle m3/cycle

1 Formwork Tunnel Forms, Wall and Slab poured as one


102 Tunneling - Medium Ground

1 Excavate vertical access shaft, 6m diameter 2 Excavate vertical access shaft, 10m diameter
103 Tunneling - NATM Tunnels

1 2 3 4 5 6 7 8 9 10 1 2 3 4

Standard Advance Method, used on tunnels with max diameter Half Face Advance Method, used on tunnels with max diameter Double side Drift Advance Method, used on tunnels with diameter over Double side Drift Advance Method, used on tunnels with diameter over Excavation, London Clay, internal diameter under 7.0m Excavation, London Clay, internal diameter 7.0-10.0m Excavation, London Clay, internal diameter over 10.0m Excavation, Woolwich/Reading Beds, internal diameter 2.0-7.0m Excavation, Woolwich/Reading Beds, internal diameter 7.0-10.0m Excavation, Woolwich/Reading Beds, internal diameter over 10.0m
- Rock Tunnels

104 Tunneling

Excavation, non explosive chemical method, cycle time Excavation, non explosive chemical method, Class I Granite Excavation, non explosive chemical method, Class II Granite Excavation, non explosive chemical method, Class III Granite
- Soft Ground

105 Tunneling

1 Excavate vertical access shaft, 6m diameter 2 Excavate vertical access shaft, 10m diameter
106 Water Engineering - Water Purification

5.0 m/day 2.5 m/day 70.0 litres/day 700.0 per m2 32.0 wks
25/26

1 Biological Marine Water Filtration, Zebra Mussels 2 Biological Marine Water Filtration, Zebra Mussels, placement density in 1000s
107 Water Engineering - Watercourses

1 Rebuild elevated canal bridge, 75m x 12.5m

Production Rate From Planning Planet


No. Item Task / Description Slow Ave Fast Units

736 737 738 739 740 741 742 743 744 745 746 747

2 Construct new watercourse/canal locks


108 Water Engineering - Waterproofing

3.5 1.2 4.8 3.3 3.8 3.3 18.7 11.2 -

29.0 4.2 1.7 5.0 3.5 4.0 3.5 20.0 25.0 15.0 75.0

25.0 wks 5.8 2.2 6.3 4.4 4.8 4.2 31.3 17.3 m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr

1 2 3 4 5 6 7 8 9 10

Asphalt coatings, horizontal surfaces Asphalt coatings, vertical surfaces Bituminous Brushed application, 2 coats Bituminous Brushed application, 3 coats Bituminous Sheets, horizontal surfaces Bituminous Sheets, vertical surfaces Polythene Sheets, horizontal surfaces Bentonite Sheets, horizontal surfaces Bentonite Sheets, vertical surfaces Epoxy Based application, 1 coat