Ship Stability: Mid-Term Revision 1 (Solutions)
Draft Survey:
1.

You are a Chief Officer on board MV Del Monte, charted to load wheat in bulk at
Santos, Brazil.
The following was observed during the draft surveys conducted before and after
loading.
Drafts observation before loading operation:
Drafts (m)
Forward
Midships
Aft

Port
4.35
5.90
7.22

Starboard
4,39
6.10
7.56

Water density 1.016

During cargo operation


1.
2.
3.
4.
5.
6.

Received 1200 tonne fuel oil


Received 140 tonne of diesel oil
Received 25 tonne of stores and spares
Consumed 7 tonne diesel oil
Consumed 16 tonne fresh water
Deballast 2500 tonne

Drafts observations after loading operation


Drafts (m)
Forward
Midships
Aft

Port
12.98
12.98
12.98

Starboard
12.98
13.02
13.02

Required:
Calculate the amount of cargo that was loaded at Santos, Brazil.

Capt Osman.2012

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)
Solutions No.1
Before loading operation.
Drafts (m)
Forward
Midships
Aft

Port
4.35
5.90
7.22

Starboard
4,39
6.10
7.56

Mean
4.37
6.00
7.39

Trim = 3.02 m

Aft
7.3900
0.0
7.3900

Midships
6.0000
0.0098 +
6.0098

Trim = 3.0452

X = 1.8 x 3.02/216 = 0.0252 (-)


Y=0
Z = 0.7 x 3.02/216 = 0.0098 (+)
Draft (m)
x/y/x corrections
Corrected drafts

Ford
4.3700
0.0252 4.3448

Mean = 4.3448 + 7.3900 + 6(6.0098)


8
= 5.9742 m
1st Trim Correction

= 6.85 x 3.0452/216 = 0.0966 m (-)

True Mean Draft

= 5.9742 0.0966 = 5.8776

CF = 6.85 (F)

= 33085.60
MCTC2 6.3776 = 790.6
MCTC1 5.3776 = 774.4

Displacement corrected for density = 33085.60 x 1.016/1.025


= 32795.09
2nd Trim Correction
Correction for list

= 50 x 3.04522 x (790.6 774.4) / 216 = 34.77 tonne


= 6(59.5 59.4) (6.10 5.90) = 0.12 tonne

Displacement corrected for density


Correction for list
2nd trim correction
Final corrected displacement

Capt Osman.2012

= 32795.09
=
0.12 (+)
=
34.77 (+)
= 32829.98 tonne

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)
After completion of loading
Drafts (m)
Forward
Midships
Aft

Port
12.98
12.98
12.98

Starboard
12.98
13.02
13.02

Mean
12.98
13.00
13.00

Trim = 0.02 m

Aft
13.0000
0.0000
13.0000

Midships
13.0000
0.0001 (+)
13.0001

Trim = 0.02 m

X = 1.8 x 0.02/216 = 0.0002 (-)


Y=0
Z = 0.7 x 0.02/216 = 0.0001 (+)
Drafts (m)
x/y/z corrections
Corrected Drafts

Ford
12.9800
0.0002 12.9798

Mean Draft = 12.9798 + 13.0000 + 6(13.0001)


8
= 12.9976
1st Trim Correction

= 0.45 x 0.02/216 = 0.00004 (+)

True mean Draft

= 12.9976 + 0.00004 = 12.99764

CF = 0.45 (A)

= 77021.896
MCTC 13.4976 = 998.0
MCTC 12.4976 = 969.6

Displacement corrected for density = 77021.896 x 1.016/1.025 = 76345.6062


2nd Trim Correction
Correction for list

= 50 x 0.022 x (998.0 969.6)/216 = 0.0026 tonne


= 6(64.4 64.3) (13.02 12.98) = 0.024 tonne

Displacement corrected for density


Correction for list
2nd trim correction
Final corrected displacement (dep)
Final corrected displacement (arr)

= 76345.6062
=
0.0240(+)
=
0.0026 (+)
= 76345.6328 tonne
= 32829.9800 tonne
= 43515.6528 tonne
Weights loaded onboard
= 1365.0000 (-)
Weights discharged
= 2523.0000 (+)
Amount of cargo loaded onboard = 44673.6528 tonne

Capt Osman.2012

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)
Cross Curves, Statical Stability & FSE:
2. MV Del Monte sailed for Singapore with a displacement of 64,600 tonne and KG
10.6.
2.1

It was anticipated that during the passage, 600 tonne of fuel KG 2.1 would be
consumed from a rectangular double bottom tank, 15m in length and 28m
wide, subdivided equally by a longitudinal watertight bulkhead. Using the
cross curves provided, draw the curve of statical stability for the anticipated
arrival condition.

2.2

MV Del Monte approach Singapore Pilot Station with a starboard list. Upon
inspection, it was confirmed that the list was due to shift of 900 tonne of cargo
through a distance of 12 m to the starboard and 2 m vertically downwards.
2.2.1 Draw the curve of statical stability for the arrival condition.
2.2.2 From the curve obtained, determine the following.
i.
Angle of list
ii.
Maximum GZ and angle at which it occurs
iii.
Angle of vanishing stability

Capt Osman.2012

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)
Solution No.2.1
G1 Gv

= (i / W) x dt x 1 / (n + 1)2
= ( lb3 / 12W) x 0.98 x
= {15 x 28 x 28 x 28 / (12 x 64000)} x 0.98 x
= 0.105

Weights
64600
600
64000
FSE
Fluid KG

KG
10.6
2.1
10.680
0.105
10.785

Heel ()
0
5
10
12
15
20
25
30
35
40
50
60
75
90

Moments
684760
1260
683500

KG Sin
0.00
0.94
1.87
2.24
2.79
3.69
4.56
5.39
6.19
6.93
8.26
9.34
10.42
10.78

KN
0.00
1.15
2.27
2.75
3.50
4.75
5.90
7.10
8.12
8.90
10.06
10.65
10.60
9.78

GZ
0.00
0.21
0.40
0.51
0.71
1.06
1.34
1.71
1.93
1.97
1.80
1.31
0.18
-1.00

GZ
2.50
2.00
1.50
1.00
GZ

0.50
0.00
0.50 0

20

40

60

80

100

1.00
1.50
Capt Osman.2012

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)

Solution No.2.2
GG1

= (w x d) / W
= 900 x 2 / 64000
= 0.0281 m

GG2

= (w x d) / W
= 900 x 12 / 64000
= 0.1688 m

Heel(
0
5
10
12
15
20
25
30
35
40
50
60
75
90

Capt Osman.2012

KN
0.00
1.15
2.27
2.75
3.50
4.75
5.90
7.10
8.12
8.90
10.06
10.65
10.60
9.78

Angle of list = 4 to starboard


Max GZ = 1.87m at 37 heel
Vanishing stability = 76.5

KGSin
0.00
0.94
1.87
2.24
2.79
3.69
4.56
5.39
6.19
6.93
8.26
9.34
10.42
10.78

GZ
0.00
0.21
0.40
0.51
0.71
1.06
1.34
1.71
1.93
1.97
1.80
1.31
0.18
1.00

GG1(+)
0.0281

GG2()
0.1688

GG1Sin
0.0000
0.0024
0.0049
0.0058
0.0073
0.0096
0.0119
0.0140
0.0161
0.0181
0.0215
0.0243
0.0271
0.0281

GG2Cos
0.1688
0.1682
0.1662
0.1651
0.1630
0.1586
0.1530
0.1462
0.1383
0.1293
0.1085
0.0844
0.0437
0.0000

FinalGZ
0.1688
0.0444
0.2360
0.3486
0.5531
0.9126
1.2013
1.5757
1.8122
1.8567
1.7117
1.2503
0.1662
0.9769

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)

FinalGZ
2.50
2.00
1.50
1.00
FinalGZ

0.50
0.00
0.50

20

40

60

80

100

1.00
1.50

Capt Osman.2012

Singapore Maritime Academy


Class2&1 (Deck) Certificate of Competency
MA2025: Ship Stability & Ship Construction
Ship Stability: Mid-Term Revision 1 (Solutions)
Free Surface Effect:
3.

M.V. Del Monte is floating at a mean draught of 10.28m with a KG of 11.2m. A


double-bottom tank 15m in length, 12m wide and 1.8m deep is filled with sea water.
The double-bottom tank is sub-divided equally by a longitudinal watertight bulkhead.
One third () of the water is discharged from one side of the double-bottom tank.
Calculate the resultant list and final GM after allowing for free surface of liquid.

Solution No.3
Amount of ballast discharged = 15 x 6 x 0.6 x 1.025 = 55.35 tonne
or = 15 x 12 x 1.8 x 1.025 x 1/6 = 55.35 tonne
From table:

Draft 10.28 m,
= 59920 tonne

Weight
59920
55.35
59864.65

KG
11.20
1.50
11.21

Moment
671104.00
83.025
671020.975

G1Gv = (i/W) x dt
= 15 x 6 x 6 x 1.025
12 x 59864.65
= 0.0046 m
KG1
G1 Gv
KGv
KM
Gv M

= 11.2100 m
= 0.0046 m
= 11.2146 m
= 13.4600 m
= 2.2454 m

Horizontal shift of G, GvG2 = 55.35 x 3


59864.65
= 0.0028 m
Tan List

= GvG2 / GvM
= 0.0028 / 2.2454
= 0.001247

List