GTECH Beijing Office Relocation Project Tender Summary

Project: GTech Beijing Office Project Submitted by: Bidders Name No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Date: Totals RMB

Categories

Design Fee (including Interior, M&E Design & coordination design for IT, Security, AV) Preliminaries Ceiling Finishes Floor Finishes Partition & Assoc Wall Finishes Fixtures and Joinery Doors Electrical Services UPS, 24h air-con, and necessary Power Upgrading for IT Rooms HVAC System (as per Landlord nominated contractor & unified rate) Fire Services (as per Landlord nominated contractor & unified rate) Plumbing and Drainage System Data and Structural Cabling Security & AV system Others, not listed in above items, but necessary to completed the project (Contractor should list detail items below, and indicate location.) Note: Bidders shall quote carefully, and ensure each quantity and price are reasonable and independent. Client shall be able to remove or add in some items as per actual scope changes without other preconditions.

Sub-Total: Taxes: TOTAL Design & Build Lump Sum:

Schedule of Rates for GTech Beijing Office Project


Submitted by: Bidders Name Date:
Code Description QTY Unit rate (RMB) Amount RMB

A
A1.00

FIT OUT
Design Fee (including Interior, M&E Design & coordination design for IT, Security, AV ) (,,IT,Security,AV) Detail design scope to be filled by the contractor sum sum sub total for item A1.00:

A1.01 A1.02

A2.00 A2.01 A2.02

Preliminaries Contractors all risk insurance, third party & general liability cover Main contractors allowance for clearance & cleaning of site inclusive of cleaning of all other contractors debris Payments to Building Management for debris removal Main contractor preparation for construction Main contractor costs to Building Management & local authority a) Fit-out deposits (refundable) a) () b) Vetting & approval fees to fire, construction & quality assurance Bureau. b) c) Temporary power charges c) d) Workers permits d) f) Vetting & approval fee to Building Management sum sum sum sum

A2.03 A2.04 A2.05

M2 sum

sum sum sum sum Point M2 sum

,
e) Cleaning fee e) A2.06 A2.07 A2.08 Environment testing fee (please insert point qty) () FS inspection fee and FS equipment inspection fee Allowances by main contractor for secured access hoarding & doors during fit-out period Main contractor protectable work (protect installed materials from damage (ex. carpet, casework, etc) until final acceptance by PM/Owner & handed over. Client will not pay to replace items damaged by other trades.) (, ) Main contractor co-ordinating fee for all Client / LL nominated contractor / Demolition works (Please list detail in below, if any) () a) b)

A2.09

sum

A2.10

sum

A2.11

sum

Page 2 of 7

Schedule of Rates for GTech Beijing Office Project


Submitted by: Bidders Name Date:
Code Description
c) d) Other necessary items: (Detail to be filled by the contractor) :()

QTY

Unit rate (RMB)

Amount RMB

A2.13

sub total for item A2.00: A3.00 A3.01 CEILINGS Supply & Install 600x600 ceiling grid & ceiling tiles, including edge trims 600x600 Supply and install gypsum board ceiling with emulsion paint for meeting room Other necessary items: (Detail to be filled by the contractor) :() M2

A3.02

M2

A3.03

sub total for item A3.00: A4.00 A4.01 FLOORING Foor chasing & making good by main contractor to facilitate electrical works Floor preparation works by main contractor for installation of carpet tiles & vinyl. Main contractor to ensure acceptable floor leveling and finish prior to installation Supply & install ____ Brand Carpet Floor. _____ Supply & install marble Floor Supply & install __x__mm ___ brand vinyl floor in ______ area _____ Supply & install __x__mm ___ brand Anti-static raised floor Other necessary items: (Detail to be filled by the contractor) :() sum

A4.02

M2

A4.03 A4.04 A4.05 A4.06 A4.07

sub total for item A4.00: A5.00 A5.01 Partition & Assoc Full height double side single layer gypsum board partitions (slab to slab) with sound insulation Full height 1hour fire-rate gypsum board partitions (slab to slab) with sound insulation as per FSB code for IT rooms etc. 1 M2

A5.02

M2

Page 3 of 7

Schedule of Rates for GTech Beijing Office Project


Submitted by: Bidders Name Date:
Code
A5.03 A5.04 A5.05

Description
Supply and install ___ mm thk straight glass glazing ___ mm Supply and install ____ skirting ____ Other necessary items: (Detail to be filled by the contractor) :()

QTY
M2 lm

Unit rate (RMB)

Amount RMB

sub total for item A5.00: A6.00 A6.01 A6.02 A6.03 Wall Finishes Supply & install back board for Logo LOGO Supply & install Logo LOGO Supply & install ___ brand emulsion wall paint finishes, including plaster & sanding ___ ,, Supply & Install ____ brand wallpaper in ____ area _____,_____ Supply & installation of ____ (vertical / roller) blinds ____() Supply & install pelmet for blinds. Supply & install glass white board Supply and install ___" manual / motor projection screen with box ____ / Other necessary items: (Detail to be filled by the contractor) :() M2 sum M2

A6.03 A6.05 A6.06 A6.07 A6.08 A6.09

M2 M2 lm sets sets

sub total for item A6.00: A7.00 A7.01 A7.02 A7.03 A7.04 A7.05 Fixtures and Joinery Full height coat closet with PL finish Low level cabinet with PL finish Hanging cabinet with plastic PL finish Full height cabinet for conference room Other necessary items: (Detail to be filled by the contractor) :() lm lm lm lm

sub total for item A7.00:

Page 4 of 7

Schedule of Rates for GTech Beijing Office Project


Submitted by: Bidders Name Date:
Code
A8.00 A8.01 A8.02 A8.03

Description
Doors Open the door hole for existing wall Close over the door hole for existing wall Supply and install double leaf glass door with s/s door frame, locksets & all associated fittings , Supply and install single leaf glass door with s/s door frame, locksets & all associated fittings Supply and install single fire rared door locksets & all associated fittings for door Supply and install double leaf timber solid core doors with frame Supply and install double leaf timber solid core doors with frame Supply and install ____ brand handle & locksets & all associated fittings for single & double wooden door , Other necessary items: (Detail to be filled by the contractor) :()

QTY
set set Pair

Unit rate (RMB)

Amount RMB

A8.04

Leaf

A8.05

set

A8.06 A8.07 A8.08

Pair Leaf set

A8.09

sub total for item A8.00: A9.00 A9.01 Electrical Services Supply & install metal trucking . a) ____ x ____mm for power b) ____ x ____mm for power c) ____ x ____mm for IT d) ____ x ____mm for IT A9.02 Supply and install main incoming cable from landlord switch room to the new office Supply and install new MCB board a) b) c) Supply & install power sockets, wall or cubicle with G.I. Conduits and wiring Supply & install power sockets, on ground with G.I. Conduits and wiring Voice and data conduit & boxes, on wall, floor, panel /, set set set set lm lm lm lm sum

A9.03

A9.04

A9.05

set

A9.06

nos

Page 5 of 7

Schedule of Rates for GTech Beijing Office Project


Submitted by: Bidders Name Date:
Code
A9.07 A9.08 A9.09 A9.10 A9.11 A9.12 A9.13 A9.14 A9.15 A9.16 A9.17

Description
Access control & CCTV points G.I. Conduits CCTV Supply & install light box Power points for light boxes with G.I. Conduits and wiring Spot light / downlight / Exit sign Power points for spot / down light with G.I. Conduits and wiring Supply and install lighting trough with light tube & circuit , Light switch Battery kit for emergency light Earthing circuit for IT equipment IT Other necessary items: (Detail to be filled by the contractor) :()

QTY
nos nos nos nos nos nos lm nos nos sum

Unit rate (RMB)

Amount RMB

sub total for item A9.00: A10.00 UPS, 24h air-con, and necessary Power Upgrading for IT Rooms UPS24 A10.01 Detail to be proposed & filled by the contractor

sub total for item A10.00 : A11.00 HVAC System (strictly follows LL's regulations) A11.01 HVAC System for normal office area: Detail to be filled by the contractor ,

sub total for item A11.00 : A12.00 Fire Services (strictly follows LL's regulations)

Page 6 of 7

Schedule of Rates for GTech Beijing Office Project


Submitted by: Bidders Name Date:
Code Description QTY
sum

Unit rate (RMB)

Amount RMB

A12.01 Fire Services for normal office area Detail to be filled by the contractor ,

sub total for item A12.00 : A13.00 Plumbing and Drainage System A13.01 Plumbing and Drainage SystemDetail to be filled by the contractor

sub total for item A13.00 : A14.00 Data and Structural Cabling A14.01 Data and Structural CablingDetail to be filled by the contractor IT sub total for item A14.00 : A15.00 Security & AV system A15.01 Security & AV SystemDetail to be filled by the contractor AV 0.00

0.00 0.00

sub total for item A15.00 : A16.00 Others, not listed in above items, but necessary to completed the project (Contractor should list detail items below, and indicate location.) Special Note: Contractor shall list any items not included in above works, but is necessary for this project, and may become Variation / Change Order in later stages. And the items assumed to be procured by Client directly. VO due to design / quotation ignorance shall be covered by contractor own cost. M2

0.00

sub total for item A16.00 :

Page 7 of 7