Вы находитесь на странице: 1из 6

Title Of The Project: Enterprise Security Services

Domain: COURSE: MCA-VI SEM.(PROJECT WORK) ROLL NO: NAME: AREA AND APPLICATION LANGUAGE USING INTERNAL GUIDE MAIL_ID MOBILE NO:(STUDENT)

.NET

Abstract
Verification and Validation is a part of S/W Quality Assurance. Verification refers to the set of activities that ensure correctly implements a specific function. Validation refers to a different set of activities that ensure that the software that has been built is traceable to customer requirements.

Verification: Are we building the product right Validation: Are we building the right product The project entitled Independent Project Metrics is an effort, to develop a tool to manage the Verification and Validation process. The specific purpose of the Independent Verification and Validation Process o f Project Metrics Tool is to bring out the various Verification and validation tasks to be performed. The scope of the Project Metrics is to cover the developed for system. The goals of the V&V effort is to ensure that the software and the documents are developed are of high quality as expected from any mission critical software. This project

generates the plan for Verification and validation process. This project maintain the document names, source code module names, version number, released date, receiving date size of document and source code modules of receiving projects for Verification and validation. Using this application we assign the tasks/activities to different persons and also calculate the expected efforts and actual efforts. The V&V co-coordinator does this work. This application is used Relational Software Project Solutions. The Project Metrics project contains the 5 modules. 1. Plan 2. Planner 3. Configure 4. Efforts Estimation 5. Reports

Objective:
This document contains a description for Enterprise Security Services enhancement. This document will contain the functional requirements of the project and how the developers will enhance the project to achieve all the objectives. The SRS will serve as a guide for the client and the developers. Section 2 is concentrated more on
the

Verification and Validation is a part of S/W Quality Assurance. Verification refers to the set of activities that ensure correctly implements a specific function. Validation refers to a different set of activities that ensure that the software that has been built is traceable

to customer requirements. Verification: Are we building the product right Validation: Are we building the right product The project entitled Independent Project Metrics is an effort, to develop a tool to manage the Verification and Validation process. The specific purpose of the Independent Verification and Validation Process o f Project Metrics Tool is to bring out the various Verification and validation tasks to be performed. The scope of the Project Metrics is to cover the developed for system. The goals of the V&V effort is to ensure that the software and the documents are developed are of high quality as expected from any mission critical software. This project generates the plan for Verification and validation process. This project maintain the document names, source code module names, version number, released date, receiving date size of document and source code modules of receiving projects for Verification and validation. Using this application we assign the tasks/activities to different persons and also calculate the expected efforts and actual efforts. The V&V co-coordinator does this work. This application is used Relational Software Project Solutions. Now a days all companies automate their operation. Thats why this system has been developed to reduce to manual work. To reduce the work involved at categorizing the information an generating reports. This project has been developed. This package stores information effectively and efficiently reports as when needed.This is able to achieve to speed up the all operations of the organization.

Existing System:

Present system is manual. The Project Metrics has to enter all the details of project, documents, and tasks. It also maintenance the team information and also efforts estimation. For this purpose the organization maintain the size of the document, source code and update the information about team members details system 1. It is time consuming 2. It leads to error prone results 3. It consumes lot of manpower to better results 4. It lacks of data security 5. Retrieval of data takes lot of time 6. Percentage of accuracy is less 7. Reports take time to produce Hence Computerization of the existing system is proposed. The new system completely removes all manual burdens and provide efficient on the entry system. manually. Which is much of time consuming process and more importantly it is error prone. Limitations Of the Manual

Proposed System:

Objectives Of the Proposed System 1. To generate the quick reports 2. To make accuracy and efficient calculations 3. To provide proper information briefly 4. To provide data security 5. To provide huge maintenance of records 6. Flexibility of transactions can be completed in time

After understanding the existing system and understanding the need for developing a new system different people involved in the related activities have been consulted. The data needed for the study has been collected from company records. The computerization of this system would avoid the wrong

interpretation and bad calculation of data .The system help the user to see any documents, source code, tasks, activities, team information with details at the click of a button. The record data is maintained and backed up such a way that data is not loss. The speed of the system could also increased.

Action Plan:

Literature Survey Analysis/Design Coding Review of lit/coding Documentation Total

2 Days 3 Days 6 Days 2 Days 2 Days 2 Weeks

System Requirements:
OPERATING PLATFORM : RDBMS SOFTWARE FRONT END TOOL : : : WINDOWS 2000/NT/XP SQLSERVER 2000 VS.NET 2003 ASP.NET

Hardware Requirements:
Intel P4 1.5GHz or above 512MB RAM 80GB HDD Minimum

Вам также может понравиться