Академический Документы
Профессиональный Документы
Культура Документы
The National Road Fund Agency (NRFA) is a Private-Public Partnership that manages and administers the Road Fund on commercial basis in accordance with National Road Fund Act No 13 2002 The main source local
revenue for the Road Fund at the moment is Fuel Levy. Given below is a disbursement schedule for projects being funded by NRFA through the Road Fund together with GRZ project specific funding for the period 1st January
to 31st March, 2009 as well as the total funds disbursed from commencement of each project for the information all road users, key players and stake-holders. Disbursements for road projects funded by other sources are
advertised separately.
Road Fund and GRZ funded Road Projects and Activities - Disbursements made to on-going and new road maintenance and
road related contracts Up to March 2009
Director
National Road Fund Agency
33 Fairley Road
Box 50695
LUSAKA
NRFA for sustainable financing of the road network as a catalyst for prosperity and economic growth.
NATIONAL ROAD FUND AGENCY
The National Road Fund Agency (NRFA) is a Private-Public Partnership that manages and administers the Road Fund on commercial basis in accordance with the Road Fund Act No. 13 of 2002. The main source
of local revenue for the Road Fund at the moment is Fuel Levy. The NRFA receives government allocation and coordinates the Road Sector Investment Programme (ROADSIP Phase II). Other sources of funding
are Cooperating Partners e.g. World Bank, European Union (EU), Danish International Development Agency (DANIDA), Norwegian Agency for International Development (NORAD), Nordic Development Fund
(NDF), Germany, Japan, OPEC Fund for International Development (OFID) and others. As part of our uncompromising transparency and accountability, we give below a disbursement schedule for projects being
funded by our good Cooperating Partners from 1st January to 31st March, 2009.
EU Funded Road Projects and Activities - Disbursements made to on-going and new road maintenance and road related contracts Up to March 2009
Rehabilitation of Lusaka - Kabwe Road: Chisamba to Mukoboto Junction Raubex Zambia Limited Central 41.9 28,763,696,520 28,523,003,983 1,734,365,910 30,257,369,893
Performance based maintenance of Mulobezi Road D787 for 4 Years: Package 7 Road Contractors Company Southern 95.6 7,579,290,344 7,412,560,655 481,390,314 7,893,950,969
Periodic maintenance of road D301: Lalafuta Bridge - Kasempa Raubex Zambia Limited North Western 143.0 16,903,048,099 3,602,029,680 1,415,918,945 5,017,948,625
Rehabilitation of feeder road U12 (Lot 4) in Kapiri Mposhi District A. Argente and Company Central 44.6 8,822,280,649 228,031,778 193,248,000 421,279,778
Periodic maintenance of road D181: Lunga Pontoon - Lubungu Pontoon Raubex Zambia Limited Central 88.0 13,799,561,724 866,311,200 1,860,838,128 2,727,149,328
Rehabilitation of feeder road R134b in Chibombo District Libean Construction Ltd Central 23.4 2,743,064,445 221,058,000 157,602,600 378,660,600
Consultancy services for the rehabilitation of Kazungula weigh bridge Zulu Burrow Consulting Engineers Southern n/a 242,324,000 0 96,987,600 96,987,600
Construction of Kazungula Weigh bridge Fair Face Enterprises Limited Southern n/a 681,049,746 0 681,049,746 681,049,746
Periodic maintenance of Main and District roads: Chitoshi - Zacharia Road Sable Transport Ltd Northern 112 23,920,068,260 2,179,089,000 2,512,161,093 4,691,250,093
Performance based road contract for unpaved rural and district roads in Lundazi Jiangxi Zhongmei Engineering Construction
District Eastern 309 38,755,853,690 0 4,646,686,268 4,646,686,268
Limited
Performance based road contract for unpaved rural and district roads in Chongwe
District Huachang Infrastructure Engineering Limited Lusaka 185 13,712,616,103 0 2,466,139,386 2,466,139,386
Total 597 186,399,139,929 56,868,940,168 21,568,365,384 78,437,305,552
DANIDA Funded Projects and Activities - Disbursements made to on-going and new road maintenance and road related contracts up to March, 2009
Rehabilitation of Road M10: Mongu - Senanga China Henan International Group Co. Ltd Western 103.0 46,000,000,000 36,566,509,001 3,230,797,846.8 39,797,306,848
Design and Supervision of Rehabilitation of Road M10: Mongu - Senanga Ng'andu / UWP Western n/a 1,922,032,500 1,326,832,500 430,792,000.0 1,757,624,500
World Bank (IDA Credit) Funded Projects and Activities - Disbursements made to on-going road maintenance and road related contracts up to March, 2009
Purchase of four (4) Motor vehicles for RTSA-80% down payment RTSA All n/a $109,825 $0 $91,520 $91,520
Payment of salary and operational costs for RAMP Activities RAMP Coordination Lusaka n/a $239,000 $40,431 $6,000 ZMK 46,431
Supervision of Reconstrcution of Selected Priority River Crossings in Region Eastern, Northern &
GRONTMIJ / CARL BRO AS n/a EUR 584,300 EUR 346,977 EUR 62,100 EUR 409,077
I:Eastern, Northern and Luapula Provinces Luapula
Reconstruction of Selected Priority River Crossings in Luapula Province Sable Transport Luapula n/a ZMK 9,178,490,103 ZMK 5,825,209,520 ZMK 817,311,302 ZMK 6,642,520,822
Reconstruction of Selected Priority River Crossings in Northern Province Sable Transport Northern n/a ZMK 12,662,414,675 ZMK 9,468,719,015 ZMK 362,165,686 ZMK 9,830,884,701
Consultancy for CTI Baseline Study for Community infrastructure improvement and Lusaka, Southern ZMK 69,618,000 ZMK 69,618,000 ZMK 69,618,000
IT Transport n/a
ownership and Western GBP 121,460 GBP 49,987 GBP 25,990 GBP 75,977
Total Zambia Kwacha n/a ZMK 34,128,477,841 ZMK 19,956,923,044 ZMK 1,548,033,319 ZMK 21,504,956,363
Total GBP n/a GBP 201,420 GBP 73,975 GBP 41,982 GBP 115,957
Total Euro n/a EUR 584,300 EUR 346,977 EUR 62,100 EUR 409,077
Total US Dollars 34.7 $36,215,524 $16,364,528 $2,779,864 EUR 19,144,393
We would like to thank all key players and stakeholders for their guidance and support since beginning of the year 2009. Your invaluable contribution is greatly appreciated. We shall call upon you once again as we struggle to bridge the financial gap so that we could
restore our damaged road network/ bridges and culverts countrywide in order to accelerate mobility of goods and services and generate employment opportunities. We all know the importance of a road infrastructure and consequences for not maintaining them.
Together, we shall succeed.
Director
National Road Fund Agency
33 Fairley Road
Box 50695
LUSAKA
NRFA for sustainable financing of the road network as a catalyst for prosperity and economic growth.