Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 1 of 10

Plant area: BOILER PROCEDURE FOR BEARING AND JACK OIL INTIAL CIRCULATION SLNO 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 PLANT DETAILS OBJECTIVE PROPOSAL SERVICES REQUIRED SAFETY PERECAUTIONS EMERGENCY PROCEDURE STAE OF THE PLANT TEST METHOD COMPLETION CRITERIA APPENDICES a. APPENDICES

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 2 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 1.0 1.1 1.1.1 1.1.2 1.1.3 1.1.4 PLANT DETAILS: a) BEARING OIL: AOP 2 Nos. and EOP one No. Oil Tank to hold the oil. Coolers 2 Nos to cool the oil, one working and the other standby. Duplex filter in the oil line to thrust bearing, one for service and the other is standby. Throttle to regulate the oil pressure in Lub oil header. Throttles at the entry to each bearing, to regulate the oil flow to the bearings. Connected oil lines from pump to bearings and back to oil tank. Required instrumentation. b) JACK OIL: Jack oil pumps AC 2 Nos. Jack oil pumps DC 1 No Relief valves. Pressure regulating valve NRVS in lines going to the bearings, with isolating valves. Required instrumentation.

1.1.5 1.1.6

1.1.7 1.1.8 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 3 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 2.0 2.1 OBJECTIVE: To circulate the Lub oil and Jack Oil in the systems after the completion of oil system flushing and adjusting the pressure and flow in the Circuits. PROPOSAL: To establish oil flow in lub oil & Jack Oil system at requires pressure and flow. SERVICES REQUIRED: Man power with required tools for attending to any leak, cleaning the oil filter and to adjust throttles. Operating personnel to co-ordinate the activities. Power supply for the pumps. Lighting arrangement for oil tank and other operating floors. Portable fire fighting equipments in all the floors. Centrifuge for clearing the oil. SAFETY PRECAUTIONS: Display of Board No cutting / welding at all floors and near Oil Tank, Oil Coolers etc. Debris in all the floors shall be removed.

3.0 3.1

4.0 4.1

4.2 4.3 4.4 4.5 4.6 5.0 5.1

5.2

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 4 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 6.0 6.1 6.2 EMERGENCY PROCEDURE: First Aid kit shall be made available. The operating personnel shall know well about the procedure of pump and the system. They shall be in a postion to intimate to shift incharge incase they are unable to tackle any eventuvality.

6.3

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 5 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 STATE OF THE PLANT: All pumps (Aops & Jops) shall be available. Oil in the tank is filled to the required level Power supply for the pumps is available Centrifuge shall be in working condition. One cooler is valved in on oil side and cooling water side. Cooling water shall be available. All bearing are Boxed up. Any Dummy and temporary line placed during oil flushing are removed and system normalised. Filters shall be cleaned. All indicating instruments local and remote shall be available. All temporary filters used at the inlet to bearings shall be removed and the throttles shall be installed.

7.9 7.10 7.11

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 6 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 8.0 8.1 8.1.1 METHOD: a) LUB OIL: Start DC EOP and fill up the system. While doing this if any leak is noticed, stop the pump and attend to the same. Once system gets filled up, stop DC EOP and start any one of AOPs. Adjust the throttle in the line to maintain the lub oil header pressure to the required value. Ensure the flow through the return lines from all the bearings. Adjust the throttles installed in the lines to individual bearings to maintain the flow as per the curve. Put the oil temperature controller on Auto. Watch the oil level in the tank, if required makeup the level. Ensure that all local and remote instruments are indicating the correct Readings. b) JACK OIL: Keep all the isolating valves open near the bearings. Release the relief valves at the discharge of the pumps. Release the pressure regulating valve in the header.

8.1.2

8.1.3

8.1.4 8.1.5

8.1.6 8.1.7 8.1.8

8.2 8.2.1 8.2.2 8.2.3

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 7 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 8.2.4 8.2.5 Valve in the pressure gauges in the entire system. Start one Jop and adjust the relief valve at its discharge to develop the required pressure. Adjust the pressure regulating valve to maintain the required header pressure. Stop this pump and start the other pump and adjust its discharge pressure as done before. Stop the above pump and run DC Jop and set its discharge pressure and stop the same. Keep dial indicators on the shaft adjusant to all the bearings to check the lift. Start any one of jop and by adjusting the isolating valves provided at the bearing end create the lift of the bearings. The lift shall be between 0.02 to 0.1 mm depending up on weight of the rotor.

8.2.6

8.2.7

8.2.8

8.2.9

8.2.10

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-101 NTPC Ref no SIM/ 1/TS/2/101

Sheet 8 of 10

Plant area: BOILER PROCEDURE FOR BEARRING AND JACK OIL INTIAL CIRCULATION SLNO STATUS 9.0 COMPLETION CRITERIA: i) Oil initial circulation through the bearing is established at the required temperature and pressure. The lift of all bearings established by running the Jops.

ii)

Signatures NTPC BHEL

SHEET 9 OF 10

10.0

APPENDICES: LOG SHEET - 1

STATION : UNIT NO : SYSTEM : TURBINE LUB-OIL SYSTEM

DATE/ TIME

AOP DIS. PR.Kg/cm2

LUB OIL HEADER PR Kg/cm2

LUB OIL TEMP C

OIL TANK LEVEL

REMARKS

Signatures NTPC BHEL

SHEET 10 OF 10

10.0

APPENDICES: LOG SHEET - 2

STATION : UNIT NO : SYSTEM : TURBINE JACK OIL SYSTEM

DATE/ TIME

JOP DIS. PR KG/CM2

JOP HEADER PR. KG/CM2

JOB PR. AT BEARINGS REMARKS Brg.1 Brg 2 Brg 3 Brg 4 Brg 5 Brg 6

Signatures NTPC BHEL

PROCEDURE FOR BEARING AND JACK OIL INTIAL CIRCULATION