Академический Документы
Профессиональный Документы
Культура Документы
Date : Sheet # 1 of 6
A. General data & Information: SERIAL NUMBER: Make Phase Sr.No. Ratio Class Type Rct Burden Vkp Imag Application : A B C CUBICLE NAME: -UNIT TYPE:
B. Mechanical Check and Visual Inspection: Sl.No. 1 2 3 4 5 Checks to be performed Inspect for physical damage/defects Check for Name plate correctness Check for Tightness of all bolted connections Check for correct polarity markings Check for all groundings are securely corrected Criteria of acceptance No damage As per approved drg. Satisfactory As per approved drg. As per approved drg. Result
SEC-EOA
:
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 2 of 6
Make:
Sl.No.:
CT Ref. Core 1
Make:
WITNESSED BY NAME SIGNATURE : :
SEC-EOA
:
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 3 of 6
Model/Sl.No.:
Applied Voltage:5000V DC for Primary Secondary / Earth :1000V DC for Secondary / Earth
Criteria : More than 1000 M Ohms for Primary Secondary / Earth More than 10 M Ohms for Secondary - Earth and between secondaries.
Result
NCC
WITNESSED BY NAME
SEC-EOA
:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 4 of 6
Model/Sl.No.: Phase A:
75 C
% Error
Remarks
75 C
% Error
Remarks
75 C
% Error
Remarks
Where, R 75
TESTED BY NAME SIGNATURE : : : NCC
Resistance at 75 C
WITNESSED BY NAME SIGNATURE : :
SEC-EOA
:
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 5 of 6
4 RATIO TEST : Instrument: 1. Primary Injection Kit 2. Tong Tester. Phase A: Terminal 1S1 1S2 Ratio Applied Primary Current (A) Measured Secondary Current (mA) Expected Secondary Current (mA) % age Error Make: Make: Model/Sl.No.: Model/Sl.No.:
Ratio
% age Error
Ratio
% age Error
SEC-EOA
:
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 6 of 6
5. Magnetisation Curve Measurement: Instrument: 1. Multimeter 2. Magnus 3. Tong Tester Make: Make: Make: Sl.No.: Sl.No.: Sl.No.:
Criteria: The %age error for Magnetising current shall be within +/- 5% of the factory Test Report. Note: All CT cores shall be demagnetized after the tests are carriedout. Current in mA Sl.No. Voltage (V) Phase A Phase B Phase C 1 2 3 4 5 6 7 8 9 10 11 12
NCC
WITNESSED BY NAME
SEC-EOA
:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA