PROJECT
4 - Advanced Component Development and Prototypes 0603619A - Landmine Warfare and Barrier - Adv Dev
COST (In Thousands) 606 CNTRMN/BARRIER ADV DEV FY 2008 Estimate 24580 FY 2009 Estimate 29234 FY 2010 Estimate 18873 FY 2011 Estimate 19077 FY 2012 Estimate 19666 FY 2013 Estimate 20172
606
Cost to Complete Continuing Total Cost Continuing
A. Mission Description and Budget Item Justification: This project provides for component development of new countermine systems for neutralizing, clearing, breaching and detection concepts that will enhance the effectiveness of the Future Force to maintain freedom of maneuver. The program includes the Ground Standoff Mine Detection System (GSTAMIDS) and the Autonomous Mine Detector (AMD). The GSTAMIDS forward looking effort will transition advanced technologies from the Army's S&T program into development to further enhance vehicle mounted mine detection capabilities for FCS. Autonomous Mine Detection System (AMDS) consist of three payloads for a robotic platform. The payloads are for remote mine detection and marking, Unexploded Ordanance (UXO) detection and marking, and neutralization. AMDS provides stand off detection for the dismounted soldier. Next Generation Mine Detection and Neutralization (FY11-13) will lever technologies currently in the Tech Base. The Next Generation Standoff Detection Systems (NGSOS) is a suite of advanced forward looking sensors designed to detect and confirm mines and Improvised Explosive Devices (IED) at far greater stand off distances than are achieved today. NGSOS will be designed as a payload on several vehicle platforms and robotic systems. Accomplishments/Planned Program:
Initiate GSTAMIDS GPR sensor block upgrade to Husky mine detection vehicle Complete prototype and test of new GPR for route clearance vehicles Initiate Autonomous Mine Detection Sensors (AMDS) program Build and test AMDS Brassboards (2) Small Business Innovative Research/Small Business Technology Transfer Program Total 1022 688 24580 29234 1022 14172 29234
FY 2007
FY 2008
9720
FY 2009
February 2008
PROJECT
BUDGET ACTIVITY
4 - Advanced Component Development and Prototypes 0603619A - Landmine Warfare and Barrier - Adv Dev
FY 2007 B. Program Change Summary
Previous President's Budget (FY 2008/2009) Current BES/President's Budget (FY 2009) Total Adjustments Congressional Program Reductions Congressional Recissions Congressional Increases Reprogrammings SBIR/STTR Transfer Adjustments to Budget Years -7089 -235 -189 8346 1022 -7324 24737 24580 -157 -157 29423 29234 -189
606
FY 2008
FY 2009
Change Summary Explanation: Funding - FY 2007: $7.089 million reprogrammed out of this PE in support of higher priority Army programs. C. Other Program Funding Summary
0604808A D415 - Landmine Warfare and Barrier Engineering Development
FY 2007
42185
FY 2008
46807
FY 2009
52475
FY 2010
43427
FY 2011
21405
FY 2012
20129
FY 2013
18534
To Compl
Continuing
Total Cost
Continuing
Comment:
D. Acquisition Strategy Autonomous Mine Detection Sensors(AMDS) - The acquisition strategy for Component Advanced Developmemt supports a competitive effort with one or more contractors/technology approaches. MS B is scheduled for 3rd QTR FY10. Risk Reduction and Broad Agency Announcement contract award(s) will begin in 2QFY08. If applicable, AMDS will downselect to one contractor when it transitions from Concept Development (6.4) to System Development (6.5) in FY 2011.
February 2008
PROJECT
BUDGET ACTIVITY I. Product Development Contract Method & Type C-CPFF C/CPFF C/FP, T&M Subtotal: Performing Activity & Location BAE Systems - Austin TX To Be Selected (1) Various
4 - Advanced Component Development and Prototypes 0603619A - Landmine Warfare and Barrier - Adv Dev
Total PYs Cost FY 2007 Cost FY 2007 Award Date 2Q FY 2008 Cost 10000 7320 2830 20150 2Q 2Q 15076 2940 18016 FY 2008 Award Date FY 2009 Cost FY 2009 Cost To Award Complete Date 2Q 2Q 2Q 8627 3015 11642
606
Total Cost 10000 31023 8785 49808 Target Value of Contract
Ground Penetrating Radar Sensor blk upgrade Adv Mine Detection Sensors Other Component Development
Remarks: Acquisition Strategy is to award one or more Broad Agency Announcements and to downselct to one System Development contract, if applicable, in FY2011. II. Support Costs Contract Method & Type MIPR Subtotal: Performing Activity & Location Various OGAs Total PYs Cost FY 2007 Cost FY 2007 Award Date FY 2008 Cost 2264 2264 FY 2008 Award Date 1Q FY 2009 Cost 2761 2761 FY 2009 Cost To Award Complete Date 3313 3313 Total Cost 8338 8338 Target Value of Contract
FY 2007 Cost
FY 2008 Cost 59 59
AMDS
Subtotal:
Performing Activity & Location PM Close Combat Systems Picatinny NJ/ Ft Belvoir VA
Program Management
February 2008
PROJECT
BUDGET ACTIVITY Program Management Contractor Support SBIR/STTR Subtotal: C/FP BRTRC Fairfax VA
4 - Advanced Component Development and Prototypes 0603619A - Landmine Warfare and Barrier - Adv Dev
122 494 688 1022 2107 1957 1752 2Q 543 598
606
1757 688 6838
1022
24580
29234
19007
73843
February 2008
PROJECT
4 - Advanced Component Development and Prototypes 0603619A - Landmine Warfare and Barrier - Adv Dev
Event Name 1
Risk Reduction Effort - Broad Agency Announcement Advanced Mine Detection Sensors Concept Development
606
FY 12 4 1 2 3 4 1 FY 13 2 3 4
FY 07 2 3 4 1
FY 08 2 3 4 1
FY 09 2 3 4 1
FY 10 2 3 4 1
FY 11 2 3
Build Two Brassboards Test Brassboards (1) Downselect (2) AMDS Milestone B (3) AMDS Preliminary Design Review
February 2008
PE NUMBER AND TITLE
0603619A Landmine Warfare and Barrier - Adv Dev
BUDGET ACTIVITY
PROJECT
4 - Advanced Component Development and Prototypes 0603619A - Landmine Warfare and Barrier - Adv Dev
Schedule Detail Risk Reduction Effort - Broad Agency Announcement Advanced Mine Detection Sensors Concept Development Build Two Brassboards Test Brassboards Downselect AMDS Milestone B AMDS Preliminary Design Review AMDS Critical Design Review AMDS Prototype Deliveries AMDS DT/OT AMDS DT/OTMilestone C 2Q - 4Q FY 2007 FY 2008 2Q - 4Q FY 2009 1Q - 4Q 2Q - 4Q 1Q - 2Q 3Q - 4Q 1Q 2Q 3Q 4Q 2Q FY 2010 1Q - 4Q 1Q - 4Q FY 2011 1Q - 2Q 1Q - 4Q 1Q - 4Q FY 2012
606
FY 2013
1Q - 4Q
4Q