Вы находитесь на странице: 1из 3

CURRICULAM VITAE

V.JEFFERY RAJKUMAR No.4, Vanil Arasu Street, West Tambaram, Chennai - 600 045. Mobile : 0091 9566231300 e-mail : jefferyrajkumar@yahoo.com / jefferyrajkumarh19@gmail.com

PERSONAL DATA Date of Birth : 08.06.1961

Father's Name : R.V.Vellaiyappan Nationality Religion : Indian : Christian

PASSPORT PARTICULARS Number Date of Issue Date of Expiry Place of Issue Educational Qualification Languages Known : : : : : : Z 1760003 03.06.2009 02.06.2019 CHENNAI M.A Public Admin English, Tamil, Hindi, Malayalam (Able to Speak Arabic ) COMPENSATION DETAILS

Last Salary Drawn


TOTAL GULF EXPERIENCE

:
:

Dhs 6300
15 Years

Job Profile

CCR OPERATOR / SHIFT INCHARGE in M/s Doosan Heavy Industries & Construction Co Ltd, Jebel Ali , Dubai.(for DEWA M Project) Worked as CCR Operator from 31st January 2010 to April 2012 and as Shift Incharge from April 2012 to 25th April 2013 at Plant designed for 6x235 MW Gas Turbine 94.3A (Siemens) and Steam Turbine 3x218 MW (Alstom) and HRSG of 6x427 t/hr (HP) and 6x36 t/hr (LP), Mixed Bed Exchanger 350 m3/hr. Job Profile

Worked as DCS / Field Commissioning Operator in M/s Hyundai, Engineering Construction Company Ltd., Jebel Ali , Dubai.(for DEWA L Phase - II) from 21st June 2009 17th December 2009 Job Profile

From 23rd Jan 2008 to 28th Sep 2008 : Worked as DCS/Field Commissioning Operator in M/s Doosan Heavy Industries & Construction Company Ltd., Barkha, Sultanate of Oman. Plant General Description The Plant Barka Ph-II Power & Desalination plant is having the capacity to support a base electrical load of 685 MW of exported power.It also produces desalinated water at the rate of 26.4 MIGD and it is capable of maintaining this level of water production. Commissioning and operation of Ansaldo V94.2 Gas Turbine 3 Nos each of capacity 130 MW, mainly Natural gas firing with Diesel oil as a backup.The plant also has 3 Heat Recovery Steam Generators(HRSG) directly connected to the GTGs.3 HRSGs are connected to HP and LP steam header to meet the steam requirement of 2 Nos of Steam Turbine Generator(STGs Siemens make). Both STGs are connected to common HP steam header. Each STG has a capacity to generate 161 MW. Job Profile

From 16th Oct 2006 to 15th Oct 2007 : Worked as DCS / Field Commissioning Operator in M/s Hyundai Engineering Construction Company Ltd., Jebel Ali ( DEWA L Phase Il ) Dubai.,U.A.E. Plant General Description Commissioning and operation of Siemens V94.3 Gas Turbine 4 nos each of capacity 203 MW, which involves commissioning of Fuel Gas System, Fuel Oil System, Lube Oil System, Air Intake System and Compressor Washing System. I have involved in operation of all commissioning activities until Performance and Reliability Test of Gas Turbine. Job Profile

From 10th Sep 2005 to 19th Sep 2006 : Worked as Field Commissioning Operator in M/s Doosan Heavy Industries & Construction Company Ltd., Sohar, Sultanate of Oman. Plant General Description The Plant Sohar Power & Desalination plant is having the capacity to support a base electrical load of 725 MW of exported power.It also produces desalinated water at the rate of 26.4 MIGD and it is capable of maintaining this level of water production. Commissioning and operation of Siemens V94.2 Gas Turbine 3 Nos each of capacity 135 MW, mainly Natural gas firing with Diesel oil as a backup.The plant also has 3 Heat Recovery Steam Generators(HRSG) directly connected to the GTGs.3 HRSGs are connected to HP and LP

steam header to meet the steam requirement of 2 Nos of Steam Turbine Generator (STGs ABB make). Both STGs are connected to common HP steam header.Each STG has a capacity to generate 161 MW. Job Profile

Feb 2005 to May 2005 : Shutdown job at M/s. Qatar Petroleum, Doha-Qatar. Main Responsibilities Shutdown Activities at Qatar Petroleum in Dhukhan Site. Job Profile

Jan 2004 to June 2004 : Final Commissioning Job in M/s. Hyundai Engg & Construction co.Ltd., Attagadi- Libya. Main Responsibilities Commissioning Job in Sirte Oil Company- ATAS PROJECT / Train 1 & 2 Job Profile

January 2003 to December 2003 :Worked with M/s Doosan Heavy Industries and Construction Ltd, Fujairah, U.A.E. Worked as GT Operator in Commissioning Department of Doosan Heavy Industries and Construction Ltd for its EPC contract to Built 640 MW & 100 MIGD Combined Power and water Plant. I was involved in Pre Commissioning and Commissioning of 4 x 117 MW Gas turbine of GE Frame 9EA make. The Gas Turbine is DLN 1 Combustors System for Nox Control. Job Profile

June 2002 Shutdown Job in M/s.Gulf House of Trade & Cont.Co.W.L.L. Doha-QATAR. Main Responsibilities HGP SHUT DOWN Job in Ras Gas Company Ltd / Train 1 Job Profile

From April 1997 to May 2002 : Worked as Sr. Supervisor in M/s Sree Ashwin Industrial Corporation. The company is involved in Structural Fabrication of lengthy way bridge, Panel boards, tanks etc., and supplying to M/s Hyundai Motors. Job Profile

From April 1994 to February 1997 : Worked as in Power Plant Operator in M/s Galfar Engineering & Contracting Co. LLC Sultanate of Oman in the M.E.W. Dept., Power and Desalination ( SUR ). The whole plant functions in SATT Control & P.L.C. System. Plant Description : Engine Model Wartsila Vasa R32 Finland (9 Cylinder Inline Engine) Engine 2 Nos V.JEFFERY RAJKUMAR Place : Chennai Date :