INSPECTION REQUEST FORM FOR SUBGRADE CONSTRUCTION

Unless otherwise approved,this inspection request form shall be submitted during the daily morning meeting among LTA,Contractor and QP(S) Contractor: SAMWOH CORPORATION PTE LTD SK E&C To: Project:

NO:

ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

Date: Time:

The work described below has been inspected by our Site engineer and is complete and ready for your inspection. A checklist is attached overleaf. Location Checked and Requested By: Chainage Activity Drawings Used for Construction Other Description

Contractor's PM Name & Signature

The meeting noted that the information provided by the Contractor is adequate/not adequate*. QP(S) may proceed *delete where appropriate Request Rejected

INITIAL INSPECTION DECISION BY QP(S)


We have inspected the above referenced works and found them acceptable. You may proceed. However, please return the completed checklist upon completion of the remaining work. You cannot proceed. Please carry out corrective works as noted on the checklist and submit a fresh request for inspection. Other comments:

RTO/RE Name & Signature/ Date

FINAL INSPECTION DECISION BY QP(S)

__________________________________________

QP(S) Name & Signature/Date work approved to start:___________________ LTA The above process for request for inspection of work by Contractor and approval by QP(S) is noted. ___________________________ LTA's Representative/Date/Time work completed on:__________________________

CHECKLIST FOR SUBGRADE CONSTRUCTION


Date/Time:
S/No 1

NO:

Location:
Description of Works

Chainage:
Checked by Contractor Confirmed by QP(S)

Send properly labelled soil samples for last 500mm of subgrade for the following tests 1.1 Maximum Dry Density 1.2 California Bearing Ratio (CBR)

2 3 4 5 6 7 8

Ensure soaked CBR conform to specifications Check formation levels of subgrade Provide proper drainage for subgrade surface Conduct field density tests (TABLE A) Continue mechanical compaction until in-situ test results conform to specifications Check sufficient temporary traffic devices if lane closure is required Others

TABLE A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 Chainage : Wt of soil from hole Wt of sand (+ cylinder ) before pouring (M1) Wt of sand (+ cylinder ) after pouring (M4) Wt of sand in hole (M5 = M1 - M4 - M2 ) Ratio = Mw/M5 Bulk density of sand Pa Bulk density of soil P = (Mw/M5)xPa Moisture content (w) Dry density Pd = 100P/(100+w) Max. dry density Optimum moisture content % of compaction Remarks Calibration (* Cylinder*) *Mean of sand in core (of pouring cylinder) (M2) Volume of calibrating container (V) *Wt of sand (+ cylinder) before pouring (M1) *Wt of sand (+ cylinder) After pouring (M3) *Sand to fill calibrating container (Ma = M1 - M3 - M2) Bulk density of sand Pa = Ma/V Mg/m3 Mg/m3 % Mg/m3 Mg/m3 % m g g g g A B C D E F