Вы находитесь на странице: 1из 184
1. GENERAL 1.1 Intent and scope (2) Intent This design instruction is intended to standardize ways of equipment layout and piping design of the plant to be designed or constructed by TEC, in order to obtain correct, economical and quick plant design. (2) Scope This design instruction applies to all TEC jobs. (3) Notes: Blanks in this instcuction should be filled out and selections made at the time of job. b. If conflict, due to customer's requirements, weather conditions etc., arises between the requirements of this instruction, this instruction should be revised and then used so as to meet them. Where there are conflicts between this instruction and other TEM or TES etc., such conflicts should be solved by assigned Job Engineers and if revisién of other TEM, TES is necessary, contact Standard Engineer and Section Chief. Whenever revision of this instruction is required, contact Section Chief. d. where applicable codes, customer's requirements etc. are in contradiction to this instruction, the formers should govern. 1.2 Outline of project (1) Nane of client : a. Main Contractor b. End user (2) Name of project : (3) Type of contract 9 ENGINEERING OF.0.B 5 TOaN-KEY 3B supervrsrne O cost ews FEE Gl tompsum PRICE D onrr price 5 orners (4) Scope of engineering PROCESS PLOW DIAGRAM rec Oust 0 OTHER Per rec Ocust J oTser PLOT PLAN Oosr 5 ormer Qcusr 0 omer Oosr 5 orser mec 8 =Ocust 0 orer UNDERGROUND PIPING ABOVEGROUND PIPING FIRE-FIGHTING PIPING ouD ooKu gag BB 8 CIVIL INFORMATION mec cust 5 omer DETAIL CIVIL DESIGN Drec Ocust corer 1,3 Outline of plant (1) Licensor + (2) Production capacity : (3) Conteact money + (4) Unit included in the plant UNET NO. [UNIT NAME | CAPACITY EICENSER T I T (5) Site of plant ; 1.4 Climatic conditions 1.4.1 ambient temperature °c *c maximum minimum yearly average : °c design max. °C (for equipment design) design min. *C (for equipment disign) 34026 1.4.2 Humidity max. relative humidity + 2 min. relative humidity + 8 year average humidity =: 8 design relative humidity : 4 (for cold insulation design) 1.4.3. Rainfall max. rainfall n/n, mm/day yearly average mm/day design rainfall + mm/ae 1.4.4 Snowfall max. snowfall : mm max. snowfall weight + kg/n? design snow load: kg/m? " 1.4.5 Direction and speed of wind max. wind speed : n/s : : avecage (monthly,yearly) = n/s design wind speed n/s direction of prevailing wind : } ; wind load: heignt_o ~ om kg/n 2 won ka/m ~ kg /n? 1.5 Topographyic conditions 1.5.1 patum plane of plant Ground level of plant m (=BL.0) ton/n? 1.5.2 Bearing capacity of soil : 1.5.3. Groundwater level 1.5.4 Max, freezing depth 1.5.5 Seismic coefficient 1.5.6 Characteristic of soil (including considerations to design) 1.5.7 Characteristic contour of Land : (including considerations to design) 1.6 Applicable regulations, codes and standards Applicalbe regulations, codes and standards should be as indicated in the contract documents. Make sure that the regulations, codes and standards applied are in what year's editions. I£ regulations, codes and standards other than indicated in the contract are used, the names of such regulations, codes and standards and the reasons why they are used should be clearly stated. 1.6.1 Customer's requirements

Вам также может понравиться