1. GENERAL
1.1 Intent and scope
(2) Intent
This design instruction is intended to standardize ways of equipment
layout and piping design of the plant to be designed or constructed by TEC, in
order to obtain correct, economical and quick plant design.
(2) Scope
This design instruction applies to all TEC jobs.
(3) Notes:
Blanks in this instcuction should be filled out and selections made at
the time of job.
b. If conflict, due to customer's requirements, weather conditions etc.,
arises between the requirements of this instruction, this instruction
should be revised and then used so as to meet them.
Where there are conflicts between this instruction and other TEM or TES
etc., such conflicts should be solved by assigned Job Engineers and if
revisién of other TEM, TES is necessary, contact Standard Engineer and
Section Chief. Whenever revision of this instruction is required,
contact Section Chief.
d. where applicable codes, customer's requirements etc. are in
contradiction to this instruction, the formers should govern.
1.2 Outline of project
(1) Nane of client :
a. Main Contractor
b. End user
(2) Name of project :
(3) Type of contract 9 ENGINEERING
OF.0.B
5 TOaN-KEY
3B supervrsrne
O cost ews FEE
Gl tompsum PRICE
D onrr price
5 orners
(4) Scope of engineering
PROCESS PLOW DIAGRAM rec Oust 0 OTHER
Per rec Ocust J oTser
PLOT PLAN Oosr 5 ormer
Qcusr 0 omer
Oosr 5 orser
mec 8 =Ocust 0 orer
UNDERGROUND PIPING
ABOVEGROUND PIPING
FIRE-FIGHTING PIPING
ouD ooKu
gag
BB 8
CIVIL INFORMATION mec cust 5 omer
DETAIL CIVIL DESIGN Drec Ocust corer1,3 Outline of plant
(1) Licensor +
(2) Production capacity :
(3) Conteact money +
(4) Unit included in the plant
UNET NO. [UNIT NAME | CAPACITY EICENSER
T
I
T
(5) Site of plant ;
1.4 Climatic conditions
1.4.1 ambient temperature
°c
*c
maximum
minimum
yearly average : °c
design max. °C (for equipment design)
design min. *C (for equipment disign)
340261.4.2 Humidity
max. relative humidity + 2
min. relative humidity + 8
year average humidity =: 8
design relative humidity : 4 (for cold insulation design)
1.4.3. Rainfall
max. rainfall n/n, mm/day
yearly average mm/day
design rainfall + mm/ae
1.4.4 Snowfall
max. snowfall : mm
max. snowfall weight + kg/n?
design snow load: kg/m?
"
1.4.5 Direction and speed of wind
max. wind speed : n/s : :
avecage (monthly,yearly) = n/s
design wind speed n/s
direction of prevailing wind : } ;
wind load: heignt_o ~ om kg/n
2
won ka/m
~ kg /n?
1.5 Topographyic conditions
1.5.1 patum plane of plant
Ground level of plant m (=BL.0)
ton/n?
1.5.2 Bearing capacity of soil :
1.5.3. Groundwater level
1.5.4 Max, freezing depth
1.5.5 Seismic coefficient
1.5.6 Characteristic of soil (including considerations to design)
1.5.7 Characteristic contour of Land : (including considerations to design)
1.6 Applicable regulations, codes and standards
Applicalbe regulations, codes and standards should be as indicated in the
contract documents. Make sure that the regulations, codes and standards applied
are in what year's editions. I£ regulations, codes and standards other than
indicated in the contract are used, the names of such regulations, codes and
standards and the reasons why they are used should be clearly stated.
1.6.1 Customer's requirements