Вы находитесь на странице: 1из 3

Resume

Name : Gaurav Kumar Mobile : +91 9412176091 Address : Qr. No. 4,

E-mail

: gauravrajson@gmail.com

Jawahar Bhavan, Lal Diggi Road, Aligarh-202001, Uttar Pradesh (India)

M. Tech. (GIS & Remote Sensing) B. Tech. (Information Technology)

Summary : A post graduate from Motilal Nehru National Institute of Technology, Allahabad , with almost 4 years of experience in Teaching and also carried out two projects in GIS on contract basis. Objective : To build a challenging and rewarding career that offers continuous building up of innovative ingenuity and which promotes exposure to variety of factors as well as evolving trends in the Research and Development. Educational Details : Qualification University/Board M.Tech MNNIT, Allahabad B. Tech UPTU, Lucknow HSC CBSE SSC ICSE Skills Set : Languages Subjects of Interest Framework Used

Year 2009 2007 2002 2000

CGPA/Percentage 7.5/10 67.34% 63.2% 72.8%

C Geoinformatics, Data Structure, Digital Image Processing, Real Time System, Computer Organization ArcGIS 9.2

Experience : Organisation Name Aligarh College of Engineering & Technology, Aligarh G L Bajaj Group of Institutions, Mathura Personal Information Name D.O.B Permanent Address Nationality Languages Known

From July 2009 January 2013

To December 2012 Till Date

: Gaurav Kumar 27 July 1984 Qr. No. 4, Jawahar Bhavan, Lal Diggi Road, Aligarh, U.P.-202001 Indian English, Hindi Projects and Theses

GIS for Identifying the Strategic Regions to Establish SEZs Course : M. Tech. College : Motilal Nehru National Institute of Technology, Allahabad

Technologies : ArcGIS 9.2 Role : Requirements gathering. Analysing and understanding the requirements. Designing and development. Research Project Description : Special Economic Zones are the economic generators of any country. Lot of land has been acquired on the name of developing SEZs in the country. This work has been carried out for the sake of identifying the suitable regions on the map of India for developing SEZs on various parameters involving national highways, airports, seaports, population, economic institutes, etc. Enterprise Automation System using ERP Course : B. Tech. College : BSA College of Engineering and Technology, Mathura Technologies : ASP.NET 2.0 Role : Requirements gathering. Analysing and understanding the requirements. Project Description : This project has been developed for the sake of providing the flow in the different modules of an organization such that there should be proper updation at every department of an organization for the sale of any object. This is helpful for the fulfillment of the objects for sale from the inventory of the organization. GIS Survey, Investigation in respect to the preparation of 2 MW wind Power Project in the state of Uttarakhand Nature: Contract based Company: Medhaj Techno Concept Pvt. Ltd., Delhi Technologies : ArcGIS 9.2 Role : GPS Surveying Mapping the surveyed data Attributing the shape files created with the data mapped Analysing and Identifying the locations to plant the windmills Project Description : There is a hill site in the village Bachelikhal, near the pilgrimage Deoprayag on the way from Hrishikesh to Deoprayag which had been identified as the most favourable wind prone site among the 12 selected sites in the state of Uttarakahand. GIS study had been carried out for the site to identify the appropriate locations to plant the windmills based upon the altitude values at the different locations over the site. About 130 different altitude values had helped out in classifying all the locations over the site into different intervals for the altitudes. The highest altitude values at different places over the site had promised for the installation of the windmills. Execution of Third Party Inspection of Rural Electrification a/c Government of Sikkim in Four Districts of Sikkim Nature: Contract based Company: Medhaj Techno Concept Pvt. Ltd., Delhi Technologies : ArcGIS 9.2 Role : GPS Surveying Mapping the surveyed data Attributing the shape files created with the mapped data Project Description :

Electrification work has been carried out in the four districts of Sikkim state in the scheme of RGGVY under the 10th and 11th plan. Third party inspection has been carried out for the sake of verification of the total work comprising of the 132 kva, 66 kva, 11 kva power stations, distribution transformers, transmission lines, high tension lines and low tension lines in the 418 villages of the four districts of the Sikkim state. Awards and Achievements: 1. Qualified GATE 2007 in the discipline of Information Technology. 2. Got first prize in JOSH 2008 participating as team member of MNNIT cricket team 3. Got third prize in the event called PRATIBIMB in MNNIT in M. Tech. first year I hereby confirm that all the details mentioned above are true and correct to the best of my knowledge. It would be pleasure working in your organization. Date: Place: Yours Faithfully, (Gaurav Kumar)

Вам также может понравиться