Worldwide experience selected projects Special requirements for underground S/S Planned projects and conceptual solutions Discussion

Copyright Siemens AG Energy Sector / High Voltage Substations

Worldwide Experience Selected Projects


Copyright Siemens AG Energy Sector / High Voltage Substations

Sophisticated Projects
Difficult locations for substations and transformers

S/S in French submarines

Hydropower stations

Offshore wind parks

Metro stations

Copyright Siemens AG Energy Sector / High Voltage Substations

Switzerland, St. Gallen - Breitfeld

St. Gallen Breitfeld


Country: Client: Scope: Switzerland Stadtwerke St. Gallen 5 bays 110 kV GIS type 8DN9 15 bays MV, 24 kV NX Plus 2 x 25 MVA transformers

The substation is located in a stadium. It was a big challenge to coordinate the implementation of the substation with the ongoing work on site. Transformer openings are closed with prefabricated concrete slab, which can be removed with reasonable effort.

Copyright Siemens AG Energy Sector / High Voltage Substations

Switzerland, St. Gallen - Schochengasse

St. Gallen Schochengasse


Country: Switzerland Client: Stadtwerke St. Gallen Scope: 6 bays 110 kV GIS type 8DN9 2 x 40 MVA power transformers 110/10 kV each 17 bays MV, 10 kV GIS The Substation is integrated in a building complex and installed underground in level-3 and level-4. More than 250 t of materials and equipment had to be craned in to a point 15 m below ground level. In the building above is accommodated a bank and the Switzerland institution for material testing

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Project Execution - Heavy Equipment Installation

Preparations for offloading a 40 MVA transformer

Transformer is lifted into the foreseen opening

Transformer placed on the rails and ready to be pulled to final position


Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Closing Transformer Opening Outside

Paving

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Closing Transformer Opening Inside

ceiling

Removable slab
Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation EMI Protection


Faraday Cage Data protection People protection

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Transformer - Fire Extinguishing System Solutions Water CO2 Halon Nitrogen Inergen

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Transformer Separated Fire Safe

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Smoke Extraction System

Activation control from the entrance four floors higher

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Utility Shafts and Emergency Exit

Exhaust air Ladder Emergency exit

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Sprinkler System in Cable Basement Drainage system in cable basement

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation HVAC Dust Protection Fresh air below transformer Fresh air under the ceiling

Copyright Siemens AG Energy Sector / High Voltage Substations

Schochengasse 110/10 kV Substation Transformer - Encapsulated Termination

Increased safety

Copyright Siemens AG Energy Sector / High Voltage Substations

Switzerland, Winterthur - Wlfingen

110/20 kV Substation Wlflingen


Country: Switzerland Client: Stadtwerke Winterthur The location is between school playground and a motorway about 4m above. The substation is used to equalize the height difference and to detain the noise from the cars. The 2 storey building with cable basement has an even access for transformers. The other side is covered by the rising plot.

Copyright Siemens AG Energy Sector / High Voltage Substations

Wlfingen Ground Plan

Copyright Siemens AG Energy Sector / High Voltage Substations

Wlfingen Noise Limits Outside

Sound absorber

Copyright Siemens AG Energy Sector / High Voltage Substations

Wlfingen Playground Outside the Substation

Copyright Siemens AG Energy Sector / High Voltage Substations

Wlfingen Transformer Cooling Devices Side effect: heating system cools transformer

Copyright Siemens AG Energy Sector / High Voltage Substations

Wlfingen Control Room Special Design

Copyright Siemens AG Energy Sector / High Voltage Substations

Wlfingen Intuitive Guiding

Copyright Siemens AG Energy Sector / High Voltage Substations

Australia, Sydney - Haymarket

110/330 kV Substation Haymarket


Country: Australia Client: TransGrid Scope: 25 x bays GIS type 8DN8/145 kV 4 x bays GIS type 8DQ1/362 kV 330/132 kV transformer The substation is integrated in a building complex in Sydney and is installed across 2 above ground and 3 basement floor levels

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation Project Execution - Deep Excavation

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation

app. 10 m, 2 storey design above ground

app. 22 m 3 storey design below ground

foot print app. 30x60 m

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation Main Equipment @ Basement 2

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation Substation Model

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation Arrangement of Equipment

330 kV GIS to 330 kV transformer 110 kV GIS GIS 8DQ1: 8DN8: 4 bays, ring bus bar connection: cable 25 bays and (15 auxiliary cable feeders), supply basement GIB, SF6 100% SF with double bus collection bar 6 gas plenum

Substation control & metering room Gas insulated transformer: 330 kV 400 MVA SF6 single phase transformers, no. 3 transformers in total
Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation SF6 Gas Management


Floor Plan Basement 2 (Equipment Floor)

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation SF6 Gas Management


Floor Plan Basement 3 (Cable Basement and SF 6 Plenum)

Primary SF6 plenum

Secondary SF6 plenum

Copyright Siemens AG Energy Sector / High Voltage Substations

Haymarket 110/330 kV Substation Key Features

Mainly under grounded substation in an urban environment Main electrical equipment with gaseous insulation, thus avoiding fire hazards Compactness due to latest GIS technology Sophisticated SF6 gas monitoring with slow and fast gas leak detection Integrated control system enabling unmanned substation operation

Copyright Siemens AG Energy Sector / High Voltage Substations

Mexico, Monterrey - Faro

132 kV Substation Faro - Monterrey


Country: Client: Scope: Mexico CFE 6 x bays GIS type 8DN9 2 x power transformer 100 MVA

Substation in a park in the middle of commercial district. Access ramp, AC openings and stairs are hidden behind landscaping.

Copyright Siemens AG Energy Sector / High Voltage Substations

United States, City of Anaheim Park Substation

69/12 kV Park Substation City of Anaheim


Country: USA Client: City of Anaheim CA Scope: 8 x bays GIS Type 8DN9 / 69 kV 2 x 69/12 kV 50 MVA transformers 20 x 12 kV panels

Copyright Siemens AG Energy Sector / High Voltage Substations

Park Substation Covered by the Roosevelt Park

Copyright Siemens AG Energy Sector / High Voltage Substations

Park Substation S/S Entrance Design

Copyright Siemens AG Energy Sector / High Voltage Substations

Park Substation S/S Emergency Exit

Copyright Siemens AG Energy Sector / High Voltage Substations

Spain, Madrid Manuela Becerra

245 kV Substation Manuel Becerra


Country: Spain Client: CFE Scope: 245KV, GIS 12 bays 8DN9 One of three Siemens underground substations in multistory buildings in Madrid. Access via crane and open able duct

Copyright Siemens AG Energy Sector / High Voltage Substations

Switzerland, Winterthur - Toessfeld

110/10 kV Substation Toessfeld


Country: Client: Switzerland Stadtwerke Winterthur

Underground substation under a schoolyard in Winterthur. Started May 2008

Copyright Siemens AG Energy Sector / High Voltage Substations

Toessfeld Section View of the Fully Undergrounded Substation

Copyright Siemens AG Energy Sector / High Voltage Substations

Toessfeld Section View

Copyright Siemens AG Energy Sector / High Voltage Substations

Toessfeld Site Mobilization and Supervision

Less effort with single storey underground buildings. Ongoing project in Switzerland: Monitored with Webcam

Shoring

Slope

Copyright Siemens AG Energy Sector / High Voltage Substations

Special requirements for underground S/S

1. Soil + Ground Water 2. Fire Fighting 3. HVAC 4. Emissions 5. Access

Copyright Siemens AG Energy Sector / High Voltage Substations

Soil and Ground Water

Ground water table Soil pressure


Crucial for design and cost

Copyright Siemens AG Energy Sector / High Voltage Substations

Ground Water Cost Impact

/$
Copyright Siemens AG Energy Sector / High Voltage Substations

Fire Protection Concept Fire Fighting

Passive Fire Fighting


No flammable material. 2 separated ventilation systems for transformers and building

Active Fire Fighting


Fire extinguish system

HSE Regulations
Emergency exit No toxic materials (PVC)

Copyright Siemens AG Energy Sector / High Voltage Substations

HVAC

Ventilation
Transformer separated from other devices. More space needed.

Humidity
Avoid humidity by minimizing air exchange

Copyright Siemens AG Energy Sector / High Voltage Substations

Emmissions

Noise
Inconvenient sound of HVACunits and transformers

Electromagnetic
Too small vertical clearance to public places or EDP

Copyright Siemens AG Energy Sector / High Voltage Substations

Access

Heavy Equipment
If possible transformers on ground floor

Aesthetic
Architectural design of visible parts

Copyright Siemens AG Energy Sector / High Voltage Substations

Planned Projects and Conceptual Solutions

Planned Projects and Conceptual Solutions


Copyright Siemens AG Energy Sector / High Voltage Substations

Conceptual Solution Semi Underground

Section 1

Copyright Siemens AG Energy Sector / High Voltage Substations

Conceptual Solution Semi Underground


Section 2

Copyright Siemens AG Energy Sector / High Voltage Substations

Cable Basement & Cable Entry


Sample: U/G S/S Round House West Area P1, Toronto Hydro/Canada

Sample: Chorzow S/S, Poland

HV cables in horizontal position terminated LV cables in cable tray above LCC cubicels LV cable entry to LCC cubicles from the top

If the space between ground surface and water table is limited, the cable basement can be avoided.
Copyright Siemens AG Energy Sector / High Voltage Substations

Conceptual Solutions 66/11 kV GIS


How to cope with the problem of limited space? Use equipment with reduced space requirements

8DN8-72.5 (66 kV GIS)

In construction and technical design 8DN8-72.5 kV corresponds to switchgear 8DN8-145 kV, but is smaller

Nx+C (11 kV GIS)


Conventional air-isolated type

Bay Width: 800 mm Bay Width: 640 mm

Copyright Siemens AG Energy Sector / High Voltage Substations

Design Concept

3 Possible Layouts
Underground S/S Semi underground S/S On top building

Hide as much as possible

Design necessary

2 levels Copyright Siemens AG Energy Sector / High Voltage Substations

Urban Situation Architectural Concept

Possible Urban Situation


Substation surrounded by buildings Park area, trees, plants, green City square, plaza or parking area

Copyright Siemens AG Energy Sector / High Voltage Substations

Design Solution on Top of Public Squares

Copyright Siemens AG Energy Sector / High Voltage Substations

HVAC - Acoustic Solutions for Parks and Sqares

Waterfall Entrance
In park design water is an essential element.

Copyright Siemens AG Energy Sector / High Voltage Substations

Commercial Aspects (Preliminary Approach)


Cost impact (underground S/S in relation to conventional S/S)
% 66 kV DBB GIS 11 kV switchgear Transformer 40 MVA and NER HV cables 66 & 11 kV c/w acc. LV service equipment SCS & CRP LV cables and cable routing Earthing and lightning protection Excavation Civil & structural works Landscaping Mechanical, electrical, plumbing (MEP) works Services (design, installation and testing) 13 28 3 1 1 1 1 1 1 1 1 1 1 bays bays Nos lot lot lot lot lot lot lot lot lot lot 7 10 40 17 25 2 14 4 15 2 6 16 8 2 3 Additional costs in % Costs of new items in % Total 0 0 0 0 0 0 0 0 3 4 2 3 0

Total costs

100%
Conventional S/S

12%
Underground S/S Copyright Siemens AG Energy Sector / High Voltage Substations

Project Execution Schedule


Estimated execution time: 20 months per substation (subject to transformer delivery)