iCAM Systems LLP A-43, Ground Floor, Sec-7 Noida-201301 Visit us at http://icamsystems.com
Confidential
SPECIALISED IN
SUB-STATION AUTOMATION-400/220/66/33/11KV ROTATIONAL LOAD SHEDDING SYSTEM ROTATIONAL LOAD SHEDDING SYSTEM SCADA SYSTEM - LOAD DESPATCH CENTRE
Confidential
PLC
BASED SUB STATION AUTOMATION
Confidential
Confidential
Automation In a Substation
Protection - Present Duties Monitors Healthiness Of Equipment On Line Trips the CBs On Fault Automatically. Fault Annunciation for Operator
Confidential
Substation Automation
CONTROL EQUIPMENT - Present Duties
Switch On & Off On Demand - Manual Status Indication of Circuit Breakers, Isolators & Other Equipment. Manual Logging of Events. Fault Analysis based On Manual Log
Confidential
Confidential
Long Downtime.
If fault not located change of cable inevitable.
Confidential
No Communication Capability
No Disturbance Recording No Event Logging Not Configurable-Dedicated Outputs Expensive to Expand,
Confidential
Confidential
Implementation
In 1998,the then DESU identified a 33/11KV fault-prone Substation at Shankar Road handling 42MVA power for Automation A Pilot Substation Automation Project was designed
Confidential
Four Substations identified on turnkey basis as PLC based automation Substations at a) 66/11 KV S/Stn (To be upgraded to 220 KV level) b) 33/11 KV S/Stn (In Advanced Stage of Commissioning) c) 33/11 KV S/Stn (In Advanced Stage of Commissioning) d) 66/33/11 KV S/Stn (Under Erection)
Confidential
Manipulation
Modular and Expandable with communication capabilities for Remote Monitoring and Operation Access to Numerical Relays locally/remotely Numerical Relay data a useful tool to diagnose
Confidential
1 2
Civil Works (Item 1 to 4) Boundary wall,yard development,fencing,levelling & steel for granty Foundation of gantry Equipment transformer Control cable trench Control Room building Total Cost of Civil Works
91.00
91.00
3 4 5
6 a
b c 7
Elect. Works (Item 6 to 8) Equipment for 7 bay Power Hardware i.e. CT,CB, ISO,PT,Insulators ,Tx.and Bus material etc. C&R Board* Control cable Sub-total of item 5 Add Erection, testing & commissioning etc. as per DVB schedule Part B Total Cost of Electrical Works Total
489.14 816.74
512.00 776.60
Financial Benefits
PLC based substation is 5% cheaper on capital cost. It is more cheaper for larger no of bays. Execution cost cheaper by 20% Execution of PLC based project requires 20% less time than conventional station. Hence less supervision cost. At least 10% less man-hours for protection and substation commissioning. PLC based substation is requires 40% less space. It requires only 10% control cable in comparison to conventional substation. It requires no trenches and no steel trays for control cable. Quality of Power Supply Improved
Confidential
CONVENTIONAL SUBSTATION
Confidential
Confidential
Confidential
Configuration Diagram
66/33/11KV SUB STATION SYSTEM CONFIGURATION
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Configuration Diagram
SYSTEM CONFIGURATION FOR 66/11KV SUB STATION
Confidential
Configuration Diagram
SYSTEM CONFIGURATION FOR 33/11KV SUB STATION
Confidential
11 kV STATUS
CB OPEN CB CLOSE SPRING CHARGED CB FAILIURE PROTECTION OVER CURRENT OPERATED EARTH FAULT OPERATED CB TEST POSITION CB IN SERVICE POSITION DC FAIL
66 kV COMMANDS CB OPEN
CB CLOSE CB LATCH RESET ISO A OPEN ISO A CLOSE ISO B OPEN ISO B CLOSE ISO C OPEN ISO C CLOSE
11kV COMMANDS
CB OPEN CB CLOSE CB LATCH RESET
11 kV
CURRENT R CURRENT Y CURRENT B INCOMMER 1 VOLTAGE RY INCOMMER 1 VOLTAGE YB INCOMMER 1 VOLTAGE BR INCOMMER 2 VOLTAGE RY INCOMMER 2 VOLTAGE YB INCOMMER 2 VOLTAGE BR
Confidential
SIMPLICITY OF WIRING
Confidential
ENERGY METER
NUMERICAL RELAY
Confidential
Confidential
Confidential
Confidential
PANEL VIEW
having TOUCH
SCREEN
Confidential
KIOSK for
Confidential
SUPERVISION RELAYS
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
BAYS:
GAS TURBINE 4 NOS OUTGOING LINES 8 NOS BUS COUPLER 5 NOS FEATURES: HOTBACKUP COMMUNICATION NETWORK REDUNDANCY REMOTE COMMUNICATION ON PLCC USING 870-5-101 PROTOCOL LINE SYNCHRONIZATION METERING INFORMATION EVENT RECORING WITH 1ms RESOULUTION
Confidential
Confidential
Confidential
Confidential
Confidential
HARDWARE USED:
CONTROL LOGIX IN HOTBACKUP DUAL CONTROLNET NETWORK CNET PLC-5 & LSM FOR SYNCHRONIZATION POWER MONITERS FOR METERING ON ETHERNET
Confidential
Confidential
FRONT VIEW REAR VIEW MAIN CONTROL PANEL WITH PLC IN REDUNDENCY
Confidential
FRONT VIEW REAR VIEW BAY CONTROL PANEL WITH FIELD I/O, PM & SOE
Confidential
BUS SYNCHRONIZATION
Confidential